Power Boards / Undertakings / PSU Closing in 0 days TDR #44611359

Tender For Running Contract For Deposit Works Under Edd-Baheri

Issued by Boards / Undertakings / PSU · Bareilly, Uttar Pradesh
Tender Value
30 Lakhs
Estimated cost
Bid Submission
12 Aug 2024
0 days left
EMD
30000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bareilly → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Running Contract For Deposit Works Under Edd-Baheri. - The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 STP 9 Mtr Long 4 STP 11 Mtr Long 5 Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc 6 11/0.4 KV 1 Phase 10/16 KVA T/F 7 11/0.4 KV 3 Phase 25 KVA T/F 8 11/0.4 KV 3 Phase 63 KVA T/F 9 11/0.4 KV 3 Phase 100 KVA T/F 10 11/0.4 KV 3 Phase 250 KVA T/F 11 11/0.4 KV 3 Phase 400 KVA T/F 12 11 KV Pilfer proof Metering cubical and CT PT Unit 13 33 KV Pilfer proof Metering cubical and CT PT Unit 14 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 15 PCC Pole 8.5 Mtr Long Single Pole 16 PCC Pole 8.5 Mtr Long Double Pole 17 ST Pole 9 Mtr Long Single Pole. 18 ST Pole 9 Mtr Long Double Pole. 19 ST Pole 11 Mtr Long Single Pole. 20 ST Pole 11 Mtr Long Double Pole. 21 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms 22 PCC Pole 8.5 Mtr Long Single Pole 23 PCC Pole 8.5 Mtr Long Double Pole 24 ST Pole 9 Mtr Long Single Pole. 25 ST Pole 9 Mtr Long Double Pole. 26 ST Pole 11 Mtr Long Single Pole. 27 ST Pole 11 Mtr Long Double Pole. 28 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 29 Dismantling of Old and damaged conductor complete in all respect 30 Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect 31 Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect 32 11/0.4 KV 3 Phase 25 KVA T/F 33 11/0.4 KV 3 Phase 63 KVA T/F 34 11/0.4 KV 3 Phase 100 KVA T/F 35 11/0.4 KV 3 Phase 250 KVA T/F 36 11/0.4 KV 3 Phase 400 KVA T/F 37 Laying, Stringing & Sagging of Following Conductor complete in all respect 38 ACSR Weasal Conductor 39 ACSR Rabbit Conductor 40 ACSR Dog Conductor 41 3 Phase Arial Bunched Conductor 42 1 Phase Arial Bunched Conductor 43 After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 44 After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 45 Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits 46 11 KV XLPE Cable Size 3x70 sqmm 47 11 KV XLPE Cable Size 3x120 sqmm 48 11 KV XLPE Cable Size 3x185 sqmm 49 33 KV XLPE Cable Size 3x120 sqmm 50 33 KV XLPE Cable Size 3x185 sqmm 51 33 KV XLPE Cable Size 3x300 sqmm 52 Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect.Alongwith filling of 04 nos cable jointing kits 53 11 KV XLPE Cable Size 3x70 sqmm 54 11 KV XLPE Cable Size 3x120 sqmm 55 11 KV XLPE Cable Size 3x185 sqmm 56 33 KV XLPE Cable Size 3x120 sqmm 57 33 KV XLPE Cable Size 3x185 sqmm 58 33 KV XLPE Cable Size 3x300 sqmm 59 Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 dia 4 Mtr long including the jumpering complete with clamps , nut and bolts. 60 11 KV XLPE Cable Size 3x70 sqmm 61 11 KV XLPE Cable Size 3x120 sqmm 62 11 KV XLPE Cable Size 3x185 sqmm 63 33 KV XLPE Cable Size 3x120 sqmm 64 33 KV XLPE Cable Size 3x185 sqmm 65 33 KV XLPE Cable Size 3x300 sqmm 66 Supply & Laying of 6 dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6 would be Provided by contractor at his own cost) 67 Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work. 68 Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5(L)x5(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation. 69 The work of digging of pits, erection of Stay Clamp, Insulator etc. 70 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 71 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 72 Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 73 Mounting of Following Capacity Transformers as per norms complete in all respect - 74 25 KVA T/F 75 63 KVA T/F 76 100 KVA T/F 77 250 KVA T/F 78 400 KVA T/F 79 Fixing of Distribution Box complete in all respect 80 Guarding at road crossing complete in all respect 81 Supply & Fixing of Following Items to complete the work (If Not available in stores) 82 LT Clamps as per RESSPO Norms for PCC/ST pole 83 Nut & Bolt off size 84 F Clampas per RESSPO Norms 85 Shackle Insulatoras per RESSPO Norms 86 X-Arm Holding Clampas per RESSPO Norms 87 Stay Clampsas per RESSPO Norms 88 11 KV Composite Polymer Disc insulatoras per RESSPO Norms 89 Top Channel of size 100x50x2240 mmas per RESSPO Norms 90 T off Channelas per RESSPO Norms 91 11 KV Polymer Pin Insulator as per RESSPO norms 92 Safe back carriage of Scrap (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. 93 Safe back carriage of Distribution Transformer from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. 94 11/0.4 KV 3 Phase 25 KVA T/F 95 11/0.4 KV 3 Phase 63 KVA T/F 96 11/0.4 KV 3 Phase 100 KVA T/F 97 11/0.4 KV 3 Phase 250 KVA T/F 98 11/0.4 KV 3 Phase 400 KVA T/F

BOQ

Name of Work:Running Contract for Deposit under EDD-Baheri
Sl. No. Item Description
1The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading.
2PCC Pole 8.5 meter long.
3STP 9 Mtr Long
4STP 11 Mtr Long
5Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc
611/0.4 KV 1 Phase 10/16 KVA T/F
711/0.4 KV 3 Phase 25 KVA T/F
811/0.4 KV 3 Phase 63 KVA T/F
911/0.4 KV 3 Phase 100 KVA T/F
1011/0.4 KV 3 Phase 250 KVA T/F
1111/0.4 KV 3 Phase 400 KVA T/F
1211 KV Pilfer proof Metering cubical and CT PT Unit
1333 KV Pilfer proof Metering cubical and CT PT Unit
14Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
15PCC Pole 8.5 Mtr Long Single Pole
16PCC Pole 8.5 Mtr Long Double Pole
17ST Pole 9 Mtr Long Single Pole.
18ST Pole 9 Mtr Long Double Pole.
19ST Pole 11 Mtr Long Single Pole.
20ST Pole 11 Mtr Long Double Pole.
21Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
22PCC Pole 8.5 Mtr Long Single Pole
23PCC Pole 8.5 Mtr Long Double Pole
24ST Pole 9 Mtr Long Single Pole.
25ST Pole 9 Mtr Long Double Pole.
26ST Pole 11 Mtr Long Single Pole.
27ST Pole 11 Mtr Long Double Pole.
28The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
29Dismantling of Old and damaged conductor complete in all respect
30Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect
31Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect
3211/0.4 KV 3 Phase 25 KVA T/F
3311/0.4 KV 3 Phase 63 KVA T/F
3411/0.4 KV 3 Phase 100 KVA T/F
3511/0.4 KV 3 Phase 250 KVA T/F
3611/0.4 KV 3 Phase 400 KVA T/F
37Laying, Stringing & Sagging of Following Conductor complete in all respect
38ACSR Weasal Conductor
39ACSR Rabbit Conductor
40ACSR Dog Conductor
413 Phase Arial Bunched Conductor
421 Phase Arial Bunched Conductor
43After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits
44After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits
45Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits
4611 KV XLPE Cable Size 3x70 sqmm
4711 KV XLPE Cable Size 3x120 sqmm
4811 KV XLPE Cable Size 3x185 sqmm
4933 KV XLPE Cable Size 3x120 sqmm
5033 KV XLPE Cable Size 3x185 sqmm
5133 KV XLPE Cable Size 3x300 sqmm
52Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect.Alongwith filling of 04 nos cable jointing kits
5311 KV XLPE Cable Size 3x70 sqmm
5411 KV XLPE Cable Size 3x120 sqmm
5511 KV XLPE Cable Size 3x185 sqmm
5633 KV XLPE Cable Size 3x120 sqmm
5733 KV XLPE Cable Size 3x185 sqmm
5833 KV XLPE Cable Size 3x300 sqmm
59Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 \" dia 4 Mtr long including the jumpering complete with clamps , nut and bolts.
6011 KV XLPE Cable Size 3x70 sqmm
6111 KV XLPE Cable Size 3x120 sqmm
6211 KV XLPE Cable Size 3x185 sqmm
6333 KV XLPE Cable Size 3x120 sqmm
6433 KV XLPE Cable Size 3x185 sqmm
6533 KV XLPE Cable Size 3x300 sqmm
66Supply & Laying of 6\" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6\" would be Provided by contractor at his own cost)
67Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work.
68Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5\"(L)x5\"(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
69The work of digging of pits, erection of Stay Clamp, Insulator etc.
70Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
71Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
72Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
73Mounting of Following Capacity Transformers as per norms complete in all respect -
7425 KVA T/F
7563 KVA T/F
76100 KVA T/F
77250 KVA T/F
78400 KVA T/F
79Fixing of Distribution Box complete in all respect
80Guarding at road crossing complete in all respect
81Supply & Fixing of Following Items to complete the work (If Not available in stores)
82LT Clamps as per RESSPO Norms for PCC/ST pole
83Nut & Bolt off size
84F Clampas per RESSPO Norms
85Shackle Insulatoras per RESSPO Norms
86X-Arm Holding Clampas per RESSPO Norms
87Stay Clampsas per RESSPO Norms
8811 KV Composite Polymer Disc insulatoras per RESSPO Norms
89Top Channel of size 100x50x2240 mmas per RESSPO Norms
90T off Channelas per RESSPO Norms
9111 KV Polymer Pin Insulator as per RESSPO norms
92Safe back carriage of Scrap (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
93Safe back carriage of Distribution Transformer from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
9411/0.4 KV 3 Phase 25 KVA T/F
9511/0.4 KV 3 Phase 63 KVA T/F
9611/0.4 KV 3 Phase 100 KVA T/F
9711/0.4 KV 3 Phase 250 KVA T/F
9811/0.4 KV 3 Phase 400 KVA T/F

AI Tender Summary

OUR REF NO 44611359
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 30 Lakhs
LAST DATE 12-08-2024
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Running Contract For Deposit Works Under Edd-Baheri. - The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading. 2 PCC Pole 8.5 meter long. 3 STP 9 Mtr Long 4 STP 11 Mtr Long 5 Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc 6 11/0.4 KV 1 Phase 10/16 KVA T/F 7 11/0.4 KV 3 Phase 25 KVA T/F 8 11/0.4 KV 3 Phase 63 KVA T/F 9 11/0.4 KV 3 Phase 100 KVA T/F 10 11/0.4 KV 3 Phase 250 KVA T/F 11 11/0.4 KV 3 Phase 400 KVA T/F 12 11 KV Pilfer proof Metering cubical and CT PT Unit 13 33 KV Pilfer proof Metering cubical and CT PT Unit 14 Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms 15 PCC Pole 8.5 Mtr Long Single Pole 16 PCC Pole 8.5 Mtr Long Double Pole 17 ST Pole 9 Mtr Long Single Pole. 18 ST Pole 9 Mtr Long Double Pole. 19 ST Pole 11 Mtr Long Single Pole. 20 ST Pole 11 Mtr Long Double Pole. 21 Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms 22 PCC Pole 8.5 Mtr Long Single Pole 23 PCC Pole 8.5 Mtr Long Double Pole 24 ST Pole 9 Mtr Long Single Pole. 25 ST Pole 9 Mtr Long Double Pole. 26 ST Pole 11 Mtr Long Single Pole. 27 ST Pole 11 Mtr Long Double Pole. 28 The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms 29 Dismantling of Old and damaged conductor complete in all respect 30 Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect 31 Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect 32 11/0.4 KV 3 Phase 25 KVA T/F 33 11/0.4 KV 3 Phase 63 KVA T/F 34 11/0.4 KV 3 Phase 100 KVA T/F 35 11/0.4 KV 3 Phase 250 KVA T/F 36 11/0.4 KV 3 Phase 400 KVA T/F 37 Laying, Stringing & Sagging of Following Conductor complete in all respect 38 ACSR Weasal Conductor 39 ACSR Rabbit Conductor 40 ACSR Dog Conductor 41 3 Phase Arial Bunched Conductor 42 1 Phase Arial Bunched Conductor 43 After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 44 After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits 45 Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits 46 11 KV XLPE Cable Size 3x70 sqmm 47 11 KV XLPE Cable Size 3x120 sqmm 48 11 KV XLPE Cable Size 3x185 sqmm 49 33 KV XLPE Cable Size 3x120 sqmm 50 33 KV XLPE Cable Size 3x185 sqmm 51 33 KV XLPE Cable Size 3x300 sqmm 52 Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect.Alongwith filling of 04 nos cable jointing kits 53 11 KV XLPE Cable Size 3x70 sqmm 54 11 KV XLPE Cable Size 3x120 sqmm 55 11 KV XLPE Cable Size 3x185 sqmm 56 33 KV XLPE Cable Size 3x120 sqmm 57 33 KV XLPE Cable Size 3x185 sqmm 58 33 KV XLPE Cable Size 3x300 sqmm 59 Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 dia 4 Mtr long including the jumpering complete with clamps , nut and bolts. 60 11 KV XLPE Cable Size 3x70 sqmm 61 11 KV XLPE Cable Size 3x120 sqmm 62 11 KV XLPE Cable Size 3x185 sqmm 63 33 KV XLPE Cable Size 3x120 sqmm 64 33 KV XLPE Cable Size 3x185 sqmm 65 33 KV XLPE Cable Size 3x300 sqmm 66 Supply & Laying of 6 dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6 would be Provided by contractor at his own cost) 67 Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work. 68 Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5(L)x5(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation. 69 The work of digging of pits, erection of Stay Clamp, Insulator etc. 70 Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. 71 Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 72 Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect 73 Mounting of Following Capacity Transformers as per norms complete in all respect - 74 25 KVA T/F 75 63 KVA T/F 76 100 KVA T/F 77 250 KVA T/F 78 400 KVA T/F 79 Fixing of Distribution Box complete in all respect 80 Guarding at road crossing complete in all respect 81 Supply & Fixing of Following Items to complete the work (If Not available in stores) 82 LT Clamps as per RESSPO Norms for PCC/ST pole 83 Nut & Bolt off size 84 F Clampas per RESSPO Norms 85 Shackle Insulatoras per RESSPO Norms 86 X-Arm Holding Clampas per RESSPO Norms 87 Stay Clampsas per RESSPO Norms 88 11 KV Composite Polymer Disc insulatoras per RESSPO Norms 89 Top Channel of size 100x50x2240 mmas per RESSPO Norms 90 T off Channelas per RESSPO Norms 91 11 KV Polymer Pin Insulator as per RESSPO norms 92 Safe back carriage of Scrap (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. 93 Safe back carriage of Distribution Transformer from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. 94 11/0.4 KV 3 Phase 25 KVA T/F 95 11/0.4 KV 3 Phase 63 KVA T/F 96 11/0.4 KV 3 Phase 100 KVA T/F 97 11/0.4 KV 3 Phase 250 KVA T/F 98 11/0.4 KV 3 Phase 400 KVA T/F
Basic Detail
Tender No 13/EDCB/2024-25
Bidding Type Tender
Location
City Bareilly
State Uttar Pradesh
Key Dates
Publish Date 06 Aug 2024
Submission Date 12 Aug 2024
Open Date 13 Aug 2024
Finance
Tender Value 30 Lakhs
Tender Fee 3540
EMD 30000
Exemption Not Available
Document List
bc30618b-44a7-47e3-aa13-33811dc91066.html
BOQ_1634668.xls
Tendernotice_1.pdf
Tender_form.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 06, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 13, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

bc30618b-44a7-47e3-aa13-33811dc91066.html

xls

BOQ_1634668.xls

pdf

Tendernotice_1.pdf

pdf

Tender_form.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders