| 1 | The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading. |
| 2 | PCC Pole 8.5 meter long. |
| 3 | STP 9 Mtr Long |
| 4 | STP 11 Mtr Long |
| 5 | Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc |
| 6 | 11/0.4 KV 1 Phase 10/16 KVA T/F |
| 7 | 11/0.4 KV 3 Phase 25 KVA T/F |
| 8 | 11/0.4 KV 3 Phase 63 KVA T/F |
| 9 | 11/0.4 KV 3 Phase 100 KVA T/F |
| 10 | 11/0.4 KV 3 Phase 250 KVA T/F |
| 11 | 11/0.4 KV 3 Phase 400 KVA T/F |
| 12 | 11 KV Pilfer proof Metering cubical and CT PT Unit |
| 13 | 33 KV Pilfer proof Metering cubical and CT PT Unit |
| 14 | Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms |
| 15 | PCC Pole 8.5 Mtr Long Single Pole |
| 16 | PCC Pole 8.5 Mtr Long Double Pole |
| 17 | ST Pole 9 Mtr Long Single Pole. |
| 18 | ST Pole 9 Mtr Long Double Pole. |
| 19 | ST Pole 11 Mtr Long Single Pole. |
| 20 | ST Pole 11 Mtr Long Double Pole. |
| 21 | Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
| 22 | PCC Pole 8.5 Mtr Long Single Pole |
| 23 | PCC Pole 8.5 Mtr Long Double Pole |
| 24 | ST Pole 9 Mtr Long Single Pole. |
| 25 | ST Pole 9 Mtr Long Double Pole. |
| 26 | ST Pole 11 Mtr Long Single Pole. |
| 27 | ST Pole 11 Mtr Long Double Pole. |
| 28 | The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms |
| 29 | Dismantling of Old and damaged conductor complete in all respect |
| 30 | Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect |
| 31 | Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect |
| 32 | 11/0.4 KV 3 Phase 25 KVA T/F |
| 33 | 11/0.4 KV 3 Phase 63 KVA T/F |
| 34 | 11/0.4 KV 3 Phase 100 KVA T/F |
| 35 | 11/0.4 KV 3 Phase 250 KVA T/F |
| 36 | 11/0.4 KV 3 Phase 400 KVA T/F |
| 37 | Laying, Stringing & Sagging of Following Conductor complete in all respect |
| 38 | ACSR Weasal Conductor |
| 39 | ACSR Rabbit Conductor |
| 40 | ACSR Dog Conductor |
| 41 | 3 Phase Arial Bunched Conductor |
| 42 | 1 Phase Arial Bunched Conductor |
| 43 | After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits |
| 44 | After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand formDouble Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits |
| 45 | Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits |
| 46 | 11 KV XLPE Cable Size 3x70 sqmm |
| 47 | 11 KV XLPE Cable Size 3x120 sqmm |
| 48 | 11 KV XLPE Cable Size 3x185 sqmm |
| 49 | 33 KV XLPE Cable Size 3x120 sqmm |
| 50 | 33 KV XLPE Cable Size 3x185 sqmm |
| 51 | 33 KV XLPE Cable Size 3x300 sqmm |
| 52 | Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect.Alongwith filling of 04 nos cable jointing kits |
| 53 | 11 KV XLPE Cable Size 3x70 sqmm |
| 54 | 11 KV XLPE Cable Size 3x120 sqmm |
| 55 | 11 KV XLPE Cable Size 3x185 sqmm |
| 56 | 33 KV XLPE Cable Size 3x120 sqmm |
| 57 | 33 KV XLPE Cable Size 3x185 sqmm |
| 58 | 33 KV XLPE Cable Size 3x300 sqmm |
| 59 | Hoisting of Following size 11 KV & 33 KV XLPE Cableon double pole with GI pipe of size 6 \" dia 4 Mtr long including the jumpering complete with clamps , nut and bolts. |
| 60 | 11 KV XLPE Cable Size 3x70 sqmm |
| 61 | 11 KV XLPE Cable Size 3x120 sqmm |
| 62 | 11 KV XLPE Cable Size 3x185 sqmm |
| 63 | 33 KV XLPE Cable Size 3x120 sqmm |
| 64 | 33 KV XLPE Cable Size 3x185 sqmm |
| 65 | 33 KV XLPE Cable Size 3x300 sqmm |
| 66 | Supply & Laying of 6\" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6\" would be Provided by contractor at his own cost) |
| 67 | Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work. |
| 68 | Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5\"(L)x5\"(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
| 69 | The work of digging of pits, erection of Stay Clamp, Insulator etc. |
| 70 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. |
| 71 | Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect |
| 72 | Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect |
| 73 | Mounting of Following Capacity Transformers as per norms complete in all respect - |
| 74 | 25 KVA T/F |
| 75 | 63 KVA T/F |
| 76 | 100 KVA T/F |
| 77 | 250 KVA T/F |
| 78 | 400 KVA T/F |
| 79 | Fixing of Distribution Box complete in all respect |
| 80 | Guarding at road crossing complete in all respect |
| 81 | Supply & Fixing of Following Items to complete the work (If Not available in stores) |
| 82 | LT Clamps as per RESSPO Norms for PCC/ST pole |
| 83 | Nut & Bolt off size |
| 84 | F Clampas per RESSPO Norms |
| 85 | Shackle Insulatoras per RESSPO Norms |
| 86 | X-Arm Holding Clampas per RESSPO Norms |
| 87 | Stay Clampsas per RESSPO Norms |
| 88 | 11 KV Composite Polymer Disc insulatoras per RESSPO Norms |
| 89 | Top Channel of size 100x50x2240 mmas per RESSPO Norms |
| 90 | T off Channelas per RESSPO Norms |
| 91 | 11 KV Polymer Pin Insulator as per RESSPO norms |
| 92 | Safe back carriage of Scrap (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. |
| 93 | Safe back carriage of Distribution Transformer from work siteto C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading. |
| 94 | 11/0.4 KV 3 Phase 25 KVA T/F |
| 95 | 11/0.4 KV 3 Phase 63 KVA T/F |
| 96 | 11/0.4 KV 3 Phase 100 KVA T/F |
| 97 | 11/0.4 KV 3 Phase 250 KVA T/F |
| 98 | 11/0.4 KV 3 Phase 400 KVA T/F |