| 1 | Improvement works |
| 2 | Dismantling for Brick Wall,including Cost of all Labours,Tools and Tackles, lead,lift,etc, Complete., |
| 3 | Dismantling for MDF- Board Partition including Cost of all Labour,Tooles and Taddes,lead,lift.etc,Complete. |
| 4 | Well Gravel filling for road Subbase , including Cost of all materials, Labour, lead,lift, consolidation,etc, Complete., |
| 5 | Providing laying Wet mix 150 mm compacted thickness with grade metal using 1CUM of 63-45 mm IRC metal with 0.24 CUM or quarry dust mix for blindge for10 sq. m including cost and conveyance of all materials and stacking them at site to dept guage for pre measurment, labour for fixing and spreading metal and dust, hand packing to camber watering with all leads and compaction with 80-100 KN power rollar including hire charges for power roller etc., complete |
| 6 | PCC 1:2:4, using 20 mm HBG metal for road without form work including cost of cement all materials, labour, lead, lift, curing etc., complete |
| 7 | Laying Chain Link Fencingas per standard specification including cost of all materials,labour, lead , lift,curing,earth work,fixing charges, transport charges,Barbed wire, concrete etc., complete. |
| 8 | Aluminium Partition with anodized aluminium frame using medium gauge hallow tube section of size 62 x 35mm and 95mm at bottom fixed with approved quality and 4mm thick cooling glass 4mm thick for top panel nd 12mm thick particle board with laminationof approved quality for board partition fixing in equal panel (or) as directed by engineer in charge of the work including cost of all materials labour charges for fabirication and fixing ,lead,lift, etc.,Complete., |
| 9 | White washing two coats using colour pigments including costof all materials,labour lead,lift etc complete 100 Sqm. |
| 10 | supply and fixing of steel gate using MS flate of size not less than12 X 5 mm and suitable angies as per the instruction of Engineer incharge including painting two coats of enamel paint over a coat of one coat of primer including cost of materials,labour charges,lead,lift etc.,complete. |