Carriage of PCC pole from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 2 11/13 Mtrs. long ST pole / 9/8.5 Mtrs. long PCC pole 3 Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material 4 CT Pole Mountain Unit 5 Metering Cubical Pilfar 6 AB Cable 1x16+1x25 7 ACSR Weasel Conductor 8 ACSR Dog Conductor 9 Cable Alluminium 3x70 Sqmm 10 33 Kv XLPE Cable 3x300 Sqmm 11 16 KVA Distribution Transformer 12 25 KVA Distribution Transformer 13 Erection ofsinglesupportby11/13 Mtrs. long ST/9/8.5 Mtrs. long PCCpole includingfixingcompleteHT/LT fittingsasperRESSPOMunualincludingthecostoflabour, T&P and carrier etc. required for proper completion of work. 14 Groutingofsinglesupport 9/8.5 Mtrs. long PCC pole asperRESSPOManual including of the cost of labour,T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 15 Erection & grouting ofdouble pole including fixing completeHT/LTfittingasperRESSPOManualincludingthe cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. 16 Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 17 Laying, sagging, stringing, binding & jumpering of ACSR Dog conductor on the newly erected pole asperRESPOmanualandasperdirectionofsupervising engineer,includingthecostofarrangementoflabour,T&P carrier etc. required for proper completion of work. 18 Layingspreading,liftingandfinalsaggingofArialBunched Cable(allsize). includingfixingof allaccessoriesasper RESSPO Manual and as per direction ofsupervising engineer, includingthecostofarrangementoflabour,T&Pcarrieretc. required for proper completion of work. : 19 Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of allgrouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. 20 Fixing &connectingofearthingrods as perRESSPOManual includingthecostoflabour,T&Petc.requiredforproper completion of work. 21 Fixing ofLTDistribution box including making connections of distributionboxwithLTmainsbypiercingclampsforArial BunchedCable.Theworkwillalsoincludethe openingofthe serviceconnectionoftheconsumeranditsconnectingin distribution box. 22 Mounting of 16 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 23 Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. 24 Digging, laying and back filling of 3X185 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangementof brick, sand, labour and T&P etc. required for proper completion of the work. 25 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Indoor/Outdoor Type) Suitable for XLPE 3x70 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 26 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Indoor/Outdoor Type) Suitable for XLPE 3x300 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 27 Filling Of 11 Kv Heat Shrinkable Cable Jointing Kit (Straight Through Type) Suitable for XLPE 3x300 Sqmm with Supply. (including the cost arrangement of labour, T&P, carrier etc. required for proper completion of work) 28 Guardingof HT/LT 11 Kv Line with GI wire as per RESPO Norms. includingthe costofarrangementoflabour, T&P etc required for proper completion of work. 29 SafecarriageofCT/PTPoleMountingUnitanditsproper installationondoublepooleafterfixingofchannelwithM.S. clamps and nuts & bolts for holding the channel angle etc. The unitbodyshallbeearthedbyconnectingM.S.Stripofsutaible size finallyconnectedtoearthingrod.11 KVline shall be connected tounit as per instructions of SDO / AE(M). The M.S. Strip & earth rod shall be included in the scope of work. 30 Safecarriageof11KVPilferProofMeteringCubical sutaible size anditsproperinstallationatpitsiteasperRESSPO Manuals 31 Installation & Fixing of following accessories. includingthecostoflabour, T&P and carrier etc. required for proper completion of work. 32 Stay Clamp 33 Stone Pad 34 LT Clamp for PCC 35 Stay Insulator 36 Disc Insulator 37 MS T-Off Channel 38 Disc Fitting 39 MS Top Channel 40 TF Base Angle 41 Dropper Channel 42 Dropper Angle 43 DP Clamp 44 Holding Clamp 45 Fuse Set 46 Cross Arm V type 47 11 Kv Pin Insulator 48 Cross Arm Clamp 49 Suspension Clamp 50 Nut Bolt 51 F Clamp 52 33 Kv Pin Insulator 53 11 Kv TPMO 54 F Bracket 55 FE Bracket 33 Kv Pin 56 GI Stay Rod 57 I-Hook 58 33 Kv Pin with Nut 59 PG Clamp 60 Bracing Angle 61 Danger Board 62 33Kv Line Isolator 63 33 Kv Pin Insulator 64 33 Kv Disc Fitting 65 33 Kv Disc Insulator 66 11 Kv Pin with Nut Bolt