| 2 | OD218244/2023-2024: Lifting the upto 1-3 HP motor after disconnecting the wire connection, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 3 | OD218209/2023-2024:Lifting the5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 4 | OD218210/2023-2024:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 5 | OD218211/2023-2024: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 6 | OD218212/2023-2024:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 7 | OD218213/2023-2024: Lifting the above 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. |
| 8 | OD218214/2023-2024: Lowering down and erecting upto 1-3 HP motor/vacuum motor pump set and erecting the motor on the base plate in position giving connections checking correct alignment and trial run on full load |
| 9 | OD218243/2023-2024: Lowering down and erecting 5-10 HP motor and erecting the motor on the base plate coupling with pumpin position giving connections checking correct alignment and trial run on full load |
| 10 | OD218215/2023-2024:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 11 | OD218216/2023-2024: Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 12 | OD218217/2023-2024: Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 13 | OD218218/2023-2024:Lowering down and erecting above 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load |
| 14 | 2.1.1:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.32 Amp TP & N |
| 15 | 2.1.6:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.200 Amp TP&N |
| 16 | 2.1.7:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.320 Amp TP&N |
| 17 | 90.14.28.9:S & F Motor starters of the following ratingsFully automatic star delta starter for 50HP motor |
| 18 | OD221025/2023-2024: Supply of industrial type ball bearing 6317 C3, SKF / FAG or equivalent |
| 19 | OD221026/2023-2024:Supply, transportation, erection and commissioningofNON RETURN VALVE cast Iron double flange as per IS/5312 PN 1.6 rating complete with Bronze body & wedge Stainless Steel spindle, Gland packing, Rubber gasket 250mm dia Non Return Valve, including cutting, modifications and fabrications as required |