tender for Hydraulic Re-Railing Equipment (Hre),Design, Manufacture And Supply Of Hydraulic Re-Railing Equipment As Per Clause 4.2 Of Section Iv & Spares For Two Years Normal Operation And Maintenance As Per Clause 3.0 Of Section V Conforming To Technic Al Specification No. Cr/Ir/Hre/2023 Important Features Of Tender, Technical Specification And Formats & Drawi Ngs I.E Section Iv , V &Vi. [ Warranty Period: 24 Months After The Date Of Delivery ] ] , Design, Manufacture And Supply Of Hydraulic Re-Railing Equipment As Per Clause 4.2 Of Section Iv &Spares For Two Years Normal Operation And Maintenance As Per Clause 3.0 Of Section V Conforming To Technic Al Specification No. Cr/Ir/Hre/2023 Important Features Of Tender, Technical Specification And Formats & Drawi Ngs I.E Section Iv , V &Vi. [ Warranty Period: 24 Months After The Date Of Delivery ] ] , Design , Manufacture And Supply Of Hydraulic Re-Railing Equipment As Per Clause 4.2 Of Section Iv &Spares For Two Years Normal Operation And Maintenance As Per Clause 3.0 Of Section V Conforming To Technic Al Specification No. Cr/Ir/Hre/2023 Important Features Of Tender, Technical Specification And Formats & Drawi Ngs I.E Section Iv , V & Vi. [ Warranty Period: 24 Months After The Date Of Delivery ] ] Senior Section Engineer Maharashtra 1.00 Set , Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 01 ] At (Location) Htxr Mmr, Cr Maharashtra 1.00 Set 5 6579N04 Essential Non Stock --- Yes Consignee Inr Services (Y) Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 03 ] At (Location) Sr.Sec.Engr/ C&W/ Ajni, Cr Maharashtra 1.00 Set 6 6579N06 Essential Non Stock --- Yes Consignee Inr Services (Y) Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 05 ] Senior Section Engineer Maharashtra 1.00 Set At (Location) (C&W) Solapur, Cr 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Commencement : Within 0 Days Of Issue Of Contract, Completion : Delivery To Be Within 11 Months Thereafter Completed Within 08 Months And Installation, Commissioning And Proving Out To Be Completed Within 3 Months Thereafter. (Total 11 Months) As Per Section -Iv, Clause 7.0 . Payment Terms Page 2 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 S.No Description Payment Terms 1 As Per Section-Iv, Clause Nos. 8.1 & 8.2 Statutory Variation Clause S.No Description 1 Statutory Variation Clause (Svc) Is Applicable As Per Clause 9.1 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Option Clause S.No Description 1 Not Applicable Railway Standard Fall Clause S.No Description 1 Not Applicable Standard Governing Conditions S.No Description 1 This E-Tender Will Be Governed By Central Railway Bid Document (Updated) August 2022 As Attached To The Tender And As Available On Website Www.Ireps.Gov.In And All Other Terms And Conditions As Envisaged In The Tender Document. 2 Irs Conditions Of Contract: The Tender /Contract Shall Be Governed By, Indian Railway Standard (Irs) Conditions Of Contract (Revised September 2022) Version 1.0, As Attached To The Tender. 3 Condition For Procurement Of M&P Items As Per Clause 40.0 Of Section Ii Of Central Railway Bid Document (Updated) August 2022 Shall Be Applicable. 4. Eligibility Conditions Special Eligibility Criteria S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 The Tenderers Who Have Designed , Manufactured , Supplied And Yes Yes Allowed Commissioned At Least 10 Sets. Of Same / Similar Machines Which Shall Be (Mandatory) Used Primarily For Re-Railing Railway Rolling Stock Such As Coaches, Wagons And Locomotives In The Event Of Accident During The Last 10 Years To Be Reckoned From The Original Date Of Closing Of Tender Shall Be Eligible For Placement Of Order. Past Performance, As Asked Above, Shall Be Furnished In The Proforma As Given In Section Vi Annexure - A , Para ( 2B ) And Uploaded Along With The Bid Duly Enclosing Copy Of Ptcs Etc. No Back Reference Shall Be Made In This Regard. Tenderers Who Have Performance Certificate For At Least 5 Such Machines (Stated Above) Issued During Last 10 Years To Be Reckoned From The Original Date Of Closing Of Tender With Satisfactory Working For Atleast One Year Since Commissioned With Clear Signature And Address Of The End User Where The Machine Is Installed And Commissioned Shall Be Eligible For Placement Of Order. Performance Certificate Of Satisfactory Working Should Be Uploaded With Bid And Details Should Be Furnished In The Proforma As Given In Section Vi Annexure - A, Para (2C) Also To Be Uploaded With The Bid. No Back Reference Shall Be Made In This Regard. For Similar Machines, The Supply Equipment Shall Be The Equipment With Same Or Higher Specification Specified In Clause 1.2.2.4, 1.2.6.1, 1.2.9.7 And 1.2.9.9 Of Section V Of The Technical Specification Only 5. Compliance Conditions Page 3 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 Check List S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 This Is An E-Tender. Manual Offers/Bids For This Tender Will Not Be Accepted No No Not Allowed Under Any Circumstances, Only Electronic Offers/Bids Shall Be Accepted. 2 Have You Furnished The Statement Of Deviations, If Any? No No Not Allowed 3 Have You Mentioned Make/Brand Of Oem ? No No Not Allowed 4 Have You Kept Your Offer Validity As Per Condition For Responsiveness Of No No Not Allowed Offer? 5 Have You Attached Relevant Document For Mse If You Claimed Benefits And No No Not Allowed Preferential Treatment As Mse Firm? 6 Have You Indicated The Hsn Code Of Your Offered Product? No No Not Allowed 7 Have You Indicated The Percentage Of Local Content In The Relevant No No Not Allowed Column? 8 Have You Submitted The Details Of Location(S) Where Local Value Addition Is No No Not Allowed Made? 9 Have You Carefully Reviewed The Contents Of The Undertaking/Declaration No No Not Allowed Regarding Non-Participation Of Sister Concerns Or Affiliates In This Tender As The Submission Of False Information/Declaration Could Lead To Rejection Of The Bid. Commercial-Compliance S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 Earnest Money Deposit (Emd) Shall Be As Per Clause 23.0 Of Section Ii Of Yes Yes Allowed Central Railway Bid Document (Updated) August 2022. Emd Is (Optional) Compulsory And Offers Without Emd, Except Those Exempted, Will Be Summarily Rejected. Vendors (Other Than Those Appearing On Vendor Panels Of Approving Agencies) Seeking Exemption From Emd, Shall Have To Attach Scanned Copy Of Requisite Document Alongwith Offer In Support Of Their Claim For Exemption, Failing Which Their Offer Will Not Be Considered Eligible For Exemption From Emd. Bidders Claiming Exemption Shall Also Be Required To Sign The Bid Securing Declaration As Follows:- I/We Certify That, My/ Our Offer Is Eligible For Exemption From Submission Of Bid Security/ Earnest Money Deposit, In Terms Of The Tender Conditions. In Case My/Our Claim To Exemption From Submission Of Bid Security/Earnest Money Deposit Is Not Found Valid As Per Terms Of The Tender, I/We Understand And Accept That Railways Has Unquestionable Right To Summarily Reject My Bid And My Offer Shall Not Be Considered For Ordering. Further, I/We Hereby Understand And Accept That If I/We Withdraw Or Modify My/Our Bids During The Period Of Validity, Or If I/We Are Awarded The Contract And On Being Called Upon To Submit The Performance Security/Security Deposit, Fail To Submit The Performance Security/Security Deposit Before The Deadline Defined In The Request For Bid Document/Notice Inviting Tender, I/We Shall Be Debarred From Exemption Of Submitting Bid Security/Earnest Money Deposit And Performance Security/Security Deposit For A Period Of 6 (Six) Months, From The Date I/We Are Declared Suspended Disqualified From Exemption From Submission Of Emd/Sd, For All Tenders For Procurement Of Goods Issued By Any Unit Of Indian Railways Published During This Period . Page 4 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 2 Bidders Must Agree To Furnish Security Deposit As Applicable As Per Yes Yes Allowed Clause 24.0 Of Section Ii Of Central Railway Bid Document (Optional) (Updated) August 2022. The Sd Amount Shall Be @ 5% Of Contract Value (Excluding Camc Charges) As Mentioned In Clause 24.3 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Bidders (Except Approved Vendors For Tendered Item / Items) Claiming Exemption From Paying Sd Must Upload Requisite Document Towards Such Claim, Alongwith The Offer. Offers From Firms Denying To Pay Security Deposit Will Be Summarily Rejected. 3 Goods & Services Tax (Gst): As Per Clause 9.0 And All Sub-Clauses Of Yes Yes Allowed Central Railway Bid Document (Updated) August 2022. All (Optional) Tenderers To Quote Correct Hsn Code And Corresponding Gst Rate For The Item/Items Quoted. Misclassification In Hsn Code, If Quoted By Any Bidder, Shall Be Dealt As Per Clause 9.0(Iv) Of Section Ii Of Central Railway Bid Document (Updated) August 2022. 4 In Case The Successful Tenderer Is Not Liable To Be Registered Under Yes Yes Allowed Cgst/Igst/Utgst/Sgst Act, The Railway Shall Deduct The Applicable (Optional) Gst From His/Their Bills Under Reverse Charge Mechanism [Rcm] And Deposit The Same To The Concerned Tax Authority. 5 Bidders Shall Also Give Declaration As Below:- I/We Agree To Pass On Such Yes Yes Allowed Additional Input Tax Credit As May Become Available In Future Under Gst (Optional) Scheme, In Respect Of All The Inputs Used In The Manufacturing And/Or Supply Of Final Goods/Services On The Date Of Supply By Way Of Reduction In Price And Advise The Purchaser Accordingly. 6 The Bidder Agrees To Supply The Tendered Stores At The Rates Quoted By Him Yes Yes Allowed In Accordance With The Standard Governing Conditions Of This Tender. (Optional) 7 The Bidder Confirms That Rates And Other Financial Terms Quoted In Relevant Yes Yes Allowed Columns Of Financial Bid Will Only Be Ruling Terms For Acceptance, And Such (Optional) Terms Quoted Anywhere Else Should Be Ignored. [Denial Of This Condition Is Not Recommended]. 8 Participation By Manufacturers Is Preferred. Agents/Dealers Participating In Yes Yes Allowed Tender On Behalf Of Manufacturers Must Provide Tender Specific (Mandatory) Authorization (Tsa) Issued By The Oem Alongwith An Undertaking That In Case The Agent/Dealer Fails To Fulfil The Warranty And Camc Obligations, Post Supply Of Machine, The Same Shall Be Undertaken By The Oem Himself. Bidders Must Upload Above Authorization Letter And Undertaking Along With Their Offer Failing Which Their Offer Will Not Be Considered As An Offer From That Manufacturer And That Make And Will Be Dealt Accordingly. I) In A Tender, Either The Authorized Agent/Dealer On Behalf Of The Principal/Oem Or The Principal/Oem Itself Can Bid But Both Cannot Bid Simultaneously For The Same Item In The Same Tender And Such Bids Will Be Summarily Rejected. Further, Against A Particular Tender, One Principal/Oem Should Not Issue Tender Specific Authorization To More Than One Agent/Dealer. Such Offers With Different Terms Against A Particular Product, If Treated As Ambiguous Offers, The Bidder(S) Or Their Principal/Oem Will Have No Right To Lodge Any Claim. Ii) If An Authorized Agent/Dealer Submits Bid On Behalf Of The Principal/ Oem, The Same Agent/Dealer Shall Not Submit A Bid On Behalf Of Another Principal/Oem In Same Tender For The Same Item/Product And Such Bids Will Be Summarily Rejected. 9 An Indian Agent Quoting In Inr On Behalf Of A Foreign Principal/Oem Should Yes Yes Allowed Submit A Copy Of Invoice / Proforma Invoice From Oem Along With Their (Mandatory) Offer As Well As Should Undertake To Furnish All Import Documents And Should Comply To Clause 22.0 Of Section Ii Of Central Railway Bid Document (Updated) August 2022 10 Bidders To Submit Details Of Location(S) Where Local Value Addition Is Made. Yes Yes Allowed In Case No Details Are Furnished, It Will Be Presumed That Works Address(Es) (Mandatory) Of Manufacturing In India Are The Location(S) Of Local Value Addition Page 5 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 11 All Bidders Shall Confirm Declaration As Below In Terms Of Clause 5.15 Of Yes Yes Allowed Section Ii Of Central Railway Bid Document (Updated) August (Mandatory) 2022 In Compliance Of Restrictions Under Rule 144(Xi) Of Gfr- 2017 :- A) I Have Read The Clause Regarding Restrictions On Procurement From A Bidder Of Country Which Shares A Land Border With India. B) I Certify That This Bidder Is Not From Such A Country Or, If From Such A Country, Has-Been Registered With The Competent Authority. C) I Hereby Certify That This Bidder Fulfills All Requirements In This Regard And Is Eligible To Be Considered. (Where Applicable, Evidence Of Valid Registration By The Competent Authority Is Attached). If The Bidder Fails To Give Such Declaration, As Above, Then It Will Be Presumed That The Contents Of Above Declaration Have Been Read And Unconditionally Agreed And Accepted By The Tenderer. If Any Tenderer Is Not Agreeable To This Declaration They Have To Categorically Mention About The Disagreement In Techno Commercial Deviation. 12 Vendors Claiming To Avail Benefits And Preferential Treatment Extended To Yes Yes Allowed Micro And Small Enterprises [Mses] Must Necessarily Upload Relevant (Optional) Documents With Their Offer In Terms Of Clause 4.0 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Vendors Claiming Mse Benefit, Despite Upward Re-Classification, Must Upload Document Confirming Their Mse Status Within A Span Of 03 Years From The Date Of Closing Of This Tender Else Status Of Such Vendors Shall Not Be Considered As Mse. 13 Please Enter The Percentage Of Local Content In The Material Being Offered. No Yes Allowed Please Enter 0 For Fully Imported Items, And 100 For Fully Indigenous Items. (Optional) The Definition And Calculation Of Local Content Shall Be In Accordance With The Make In India Policy As Incorporated In The Tender Conditions. General Instructions S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 Ranking Of Offers Will Be Arrived On For Destination Basis Only. No No Not Allowed 2 In Case Of Any Change In Statutory Tax Regime After Date Of Closing Of A No No Not Allowed Tender, All The Offers Shall Be Evaluated As Per Tax Regime As Applicable On The Date Of Closing Of Tender Only. 3 Liquidated Damages In Delivery Period Extensions Will Be Applicable As Per No No Not Allowed Clause 15.0 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Upper Limit For Recovery Of Ld In Supply Contracts Will Be 10% (Ten Percent) Of The Value Of Stores Delayed And Not The Value Of Contract, Irrespective Of Delays. 4 Benefits To Micro & Small Enterprises (Mses) Shall Be As Per Clause 4.0 Of No No Not Allowed Section Ii Of Central Railway Bid Document (Updated) August 2022. 5 Public Procurement Policy For Preference To Make In India Shall Be As Per No No Not Allowed Clause 5.0 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Other Conditions S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 By Tpi Agency, As Per Section V, Clause 7.0 No No Not Allowed Special Conditions S.No. Description Confirmation Remarks Documents Required Allowed Uploading Page 6 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 1 Delivery Is To Be Made On For Destination Basis As Per Clause 27.0 Of No No Not Allowed Central Railway Bid Document (Updated) August 2022. Non Compliance Of The Clauses Specified In The Bid Document Will Lead To Rejection Of Offer. 2 Firms To Ensure That Their Offer Is As Per Tendered Specification Only. No No Not Allowed 3 Technical And Commercial Deviations, If Any, Must Be Quoted In Relevant No No Not Allowed Column Specified While Submitting The Bid. Any Deviation In Offer Quoted Anywhere Else In The Tender Or In Uploaded Documents, Shall Be Ignored And Contract Shall Be Placed After Ignoring Such Deviations, Which Will Be Binding On The Firm. 4 The Purchaser Shall Be Entitled And It Shall Be Lawful On His Part To Forfeit The No No Not Allowed Security Deposit In Whole Or In Part In The Event Of Any Default, Failure Or Neglect On The Part Of The Contractor In The Fulfillment Or Performance In All Respects Of The Contract Under Reference Or Any Other Contract With The Purchaser Or Any Part Thereof To The Satisfaction Of The Purchaser And The Purchaser Shall Also Be Entitled To Deduct From The Said Deposits Any Loss Or Damage Which The Purchaser May Suffer Or Be Put By Reason Of Or Due To Any Act Or Other Default, Recoverable By The Purchaser From The Contractor In Respect Of The Contract Under Reference Or Any Other Contract And In Either Of The Events Aforesaid To Call Upon The Contractor To Maintain The Security Deposit At Its Original Limit By Making Further Deposits, Provided Further That The Purchaser Shall Be Entitled To Recover Any Such Claim From Any Sum Then Due Or Which At Any Time Thereafter May Become Due To The Contractor Under This Or Any Other Contracts With The Purchaser. Wherever The Supplies Are To Be Delivered In More Than One Instalment, Each Such Instalment Forms A Severable Contract. In Case Of Failure By Contractor To Meet Deliveries For Any Instalment, Purchaser May Cancel The Contract For Defaulted Part By Forfeiting Sd Commensurate To That Instalment. Apart From Claiming Damages From Vendors, In Case Of Failure To Comply With The Contractual Obligations, Railways Shall Record Poor Performance Of The Vendors For Taking Suitable Penal Action As Per Extant Instructions. 5 Risk Purchase Will Not Be Applicable And Clause 36.0 Of Section Ii Of No No Not Allowed Central Railway Bid Document (Updated) August 2022 Is Deleted. Wherever Sd Has Been Exempted, For Any Reason, And The Supplier Fails To Supply Goods As Per Conditions Of The Contract, As Amended From Time To Time, Purchaser Shall Have The Right To Levy Damages On The Supplier For Failing To Comply With The Contractual Conditions, Not By Way Of Penalty, An Amount Equal To Sd Amount, As Would Have Been Applicable If The Contract Was With A Non-Exempted Vendor. These Damages Shall Be Treated As Recoveries Outstanding Against The Supplier And Dealt With Accordingly In Terms Of Clause 24.7 Of Section Ii Of Central Railway Bid Document (Updated) August 2022 6 Criteria For Classification Of Enterprises Based On Investment And Turnover No No Not Allowed Vide Gazette Notification Dated 26.06.2020, As Amended Time To Time,Issued By Ministry Of Micro, Small And Medium Enterprises Is Applicable In The Tender. In Case, Conditions Contained In The Above Notification Contradict With Any Of The Tender Conditions, Conditions Contained In The Above Notification, As Amended, Shall Prevail In Terms Of Clause 4.4 Of Section Ii Of Central Railway Bid Document (Updated) August 2022. 7 Tenderers Are Required To Quote For A Comprehensive Annual Maintenance No No Not Allowed Contract. However Camc Charges Are Optional And Not The Part Of The Evaluation Criteria. Technical-Compliances S.No. Description Confirmation Remarks Documents Required Allowed Uploading Page 7 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 1 Bidders Have To Fill All Annexures/Formats As Given In Section-Vi And Yes Yes Allowed Attach With Their Bid (Mandatory) 2 Bidders Are Required To Submit Documentary Evidence For The Reasonability Yes Yes Allowed Of The Quoted Prices, Preferably The Copies Of Recent Contract(S) For The (Optional) Same Item Or Price Lists Published By Oem/Oes/Opm As Applicable 3 Bidders Should Submit Para-Wise Compliance Statement To The Tendered Yes Yes Allowed Specification No.Cr/Ir/Hre/2023 (Mandatory) Undertakings S.No. Description Confirmation Remarks Documents Required Allowed Uploading 1 The Tenderer Undertakes To Have Gone Through The Central Railway No No Not Allowed Bid Document (Updated) August 2022 Attached With The Tender, The Tender Document And The Indian Railway Standard (Irs) Conditions Of Contract (Revised September 2022) Version 1.0 And Undertakes To Abide By All The Above By Submitting The Offer. 2 The Tenderer Undertakes By Submitting The Bid Against This Tender To Have No No Not Allowed Carefully Gone Through The Irs Conditions Of Contract ( Uploaded Along With The Tender) Particularly Para 2500 Pertaining To Code Of Integrity, Misdemeanour And Penalties. The Tenderer Further Undertakes As Below :- I/We Hereby Certify That No Other Sister Concerns Or Affiliates (Such As Having Common Partner/Director/Promoter/Owner/Holding Company Decision Control Etc.) Have Participated In This Tender Which Can Give Rise To A Conflict Of Interest Or Fall Under Anti-Competitive Practices. We Understand That The Offers Of All Such Sister Concerns Including Ours Are Liable To Be Rejected In Terms Of The Relevant Provisions Of Irs Terms And Conditions. I/We, Affirm That We Shall Abide By The Code Of Integrity In General, With Specific Reference To Conflict Of Interest [Para 2502 (E)], Anti Competitive Practices [Para 2502(C)] And Obligation To Proactive Disclosures [Para 2503]. I/We Understand That We Are Fully Responsible For The Above Declaration And It Shall Not Be The Railways Responsibility To Verify The Same. I/We Are Aware That We Shall Be Liable For All Consequences Of Violation Of Code Of Integrity, If Detected, At Any Stage. 6. Documents Attached With Tender S.No. Document Name Document Description 1 5009976.Pdf Central Railway Bid Document (Updated) August 2022 2 5009983.Pdf Irs Conditions Of Contract (Rev Sep 2022) Ver 1.0 3 5010052.Pdf Imp Features Of Tender (Section-Iv) For Mmr & Ajni 4 5045549.Pdf Format For Eligibility As Per Para 2 (B), 2 (C) 5 5010067.Pdf Cr/Ir/Hre/2023 (Section-V) 6 5010075.Pdf Formats & Drawings (Section-Vi) 7 5010054.Pdf Imp Features Of Tender (Section-Iv) For Sur 7. Responsiveness S.No. Description Validity Of Offer: Validity Of Offer Should Be 150 Days As Per Clause 1.8.5 Of Section Ii Of Central Railway Bid 1 Document (Updated) August 2022 (Or) As Stipulated In The Tender Document, Whichever Is Longer. Offers Quoted With Lesser Validity Shall Be Deemed As Commercially Unresponsive And Shall Be Summarily Rejected. Bidders Must Quote On Firm Price Basis Only As Price Is Not Subject To Any Variation. Offers Quoted With Price 2 Variation Clause (Pvc) Will Be Considered Unresponsive And Will Be Summarily Rejected In Terms Of Clause 32.0 (I) Of Section Ii Of Central Railway Bid Document (Updated) August 2022. Page 8 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document Tender No 71245071 Closing Date/Time 26/08/2024 11:30 The Tenderers In Their Bid Shall Indicate The Details Of Their Gst Jurisdictional Assessing Officers (Designation, Address & Email Id). In Case Of A Contract Award, A Copy Of Purchase Order Shall Be Immediately Forwarded By Purchaser To The Gst Jurisdictional Assessing Officer Mentioned In Tenderers Bid This Tender Complies With Public Procurement Policy (Make In India) Order 2017, Dated 15/06/2017, Issued By Department Of Industrial Promotion And Policy, Ministry Of Commerce, Circulated Vide Railway Board Letter No. 2015/Rs(G)/779/5 Dated 03/08/2017 And 27/12/2017 And Amendments/ Revisions Thereof. As A Tender Inviting Authority, The Undersigned Has Ensured That The Issue Of This Tender Does Not Violate Provisions Of Gfr Regarding Procurement Through Gem. Digitally Signed By Dy.Cmm/Es ( Ridhima Singh ) Page 9 Of 9 Run Date/Time: 30/07/2024 13:04:05 , Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 03 ] At (Location) Sr.Sec.Engr/ C&W/ Ajni, Cr Maharashtra 1.00 Set 6 6579N06 Essential Non Stock --- Yes Consignee Inr Services (Y) Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 05 ] Senior Section Engineer Maharashtra 1.00 Set At (Location) (C&W) Solapur, Cr 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Commencement : Within 0 Days Of Issue Of Contract, Completion : Delivery To Be Within 11 Months Thereafter Completed Within 08 Months And Installation, Commissioning And Proving Out To Be Completed Within 3 Months Thereafter. (Total 11 Months) As Per Section -Iv, Clause 7.0 . Payment Terms Page 2 Of 9 Run Date/Time: 30/07/2024 13:04:05Stores/Central Rly Tender Document , Installation , Testing , Commissioning And Proving Out Of Hydraulic Re- Railing Equipment I.E. Item # 05 ] Senior Section Engineer Maharashtra 1.00 Set At (Location) (C&W) Solapur, Cr 3.