| 1 | Item No 1 :Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingtheexcavatedmaterialuptoadistanceof50m.beyondthebuildingareaand stackingandspreadingasdirected,dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means Additional.Specification-Bd.A.1 Page Number 259 SSR 2022-23 Item no 21.01 |
| 2 | Item No 2 :Providingsoling using80mm sizetrapmetalin15cm.layerincludingfilling voidswith Crushed sand/grit, ramming, watering etc. complete.Additional.Specification-As directed by Engineer-in-charge SSR 2022-23 Item no 21.40 |
| 3 | Item No 3 : Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing out water,Steel centering,formwork, laying/pumping, compacting,rough ening the mifspecial finish is to be provided, finishing if required and curing complete,with fullyautomatic micro processor based PLC with SCADA enabled rever sible Drum Type mixer/ concrete Batch mix plant (Panmixer ) etc. complete .With fine aggregate (NaturalSand/Crushed sand VSI Grade finely washed etc ) Additional Spec.bd .E.1 Page No 287 SSR2022-23 Item No 24.01 |
| 4 | Item No 4 : Providing cast in situ/ ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc.including necessary form work, compaction, finishing and curing etc.complete.(with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA With fine aggregate (NaturalSand/Crushed sand VSI Grade finely washed etc )cment 4.05 bage/cumt) Chapter ;Cross Drainage Works Add Spec CD 8 Page 163 SSR2022-23 Item No 11.28 |
| 5 | Item No 5: Construction of dry lean cement concrete Sub- base over aprepared sub-gradewith coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved byEngineer-in-charge , compacting withvibratory roller, finishing,curing andincluding preparation of sub-grade surface if required etc. complete.with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.Additional Specification Bd. E. 1 Page No.28 SSR 2022-23 Item no 5.13 |
| 6 | Item No 6: Providing and laying Cast in situ /Ready Mix cement concrete in M20 of trap/granite/quartzite/gneiss metal for wearing course 8 cm thik including compacting ,finishing,curing and filing in joints with bitumen etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant / panmixer with fine agreegates of required specifications (Natural sand/ VSI sand finely washed etc ) Chapter ;Bridge Super Structure Add Spec MORTH 801 SSR2022-23 Item No 14.39 |
| 7 | Item No 7: Fixing in position Road Junction/ Informatory Sign Board in ground with C.C.1:4:8 block of 60cm x 60cm x 75cm size including all leads complete.SSR 2022-23 Item No 6.20 |
| 8 | Total in Figures- Part A |
| 9 | Item No 8 - Charges for testing of material in vigilance and quality control laboratory for Concrete Compressive Strength Of C C Cube (Set of 3 Cubes |
| 10 | Item No 9 : Royalty charges b) For All Other Minerals = Royalty + surcharge (2%) As Per SSR 2022-23 The Government of Maharashtra, Revenue and Forest Departments Gazette No.146 Dt.04 June 2021 |
| 11 | Total in Figures Part |