Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 0 days TDR #44436923

Tender For Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw

Issued by Boards / Undertakings / PSU · Raigarh, Chhattisgarh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Oct 2024
0 days left
EMD
3 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Raigarh → Chhattisgarh
EMD Exemption
Available
Quantity
Not Available

Project Description

Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Chhattisgarh , 1.0- Design, Engineering (Including 3D Modelling Of Complete Ahp), Selection Of Equipment Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 1.1- Design, Engineering, 3D Modelling Of Complete Ahp Including Electrical Buildings In Ahp, Selection Of Equipment Etc Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 2.0- Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Touch Up Paints, Consumables, Commissioning Spares Etc Of The Following Including Customs Clearance/ Port Clearance. , 2.1- Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Item Sl. No. 2.2 To 2.6 Below). , 2.2- Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.3- Complete Dewatering Bin System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Associated Equipment At Dewatering Bins As Per The Scope Of Specification. , 2.4- Fly Ash Classification System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 2.5- Fly Ash Bagging System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 2.6- Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.7- Lt Switchgear & Busduct For Ahp , 2.8- Lt Transformers For Ahp , 2.9- Cables- Ht / Lt Power , Screen , Control , Ofc And Communication Cables With All Accessories For Clamping, Jointing & Termination As Per The Scope Specifications , 2.10- Cable Trays, Tray Supports , Earthing & Lightening Protecton Materials, Conduits, Steel For Base Framwes, Hardwares, Illumination System, Ups, Plant Requirements And All Other Electrical And C&I Equipments As Per Scope Matrix, Which Are Not Considered In 2.1 To 2.9Above. , 3.0- Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Intra Site Handling And Handing Over To End Customer. , 3.1- Mandatory Spares For Complete Ahp As Per As Per The Scope Of Specification ( Other Than Item Mentioned In Sl.No. 3.2 Below ). , 3.2- Mandatory Spares For Lt Switchgear & Busduct For Ahp , Services-Erection & Commissioining,Operation & Maintenance,Training, Unloading,Receipt, Storage Including Intra Site Handling, Painting At Site,Trial Run,Functional Test, Pg Test, Handing Over To End Customer Etc As Per Scope Of Specifications (Price Quoted For Sl.No. 4.1 To 4.11 Shall Be Comprises Of All The Activities) , 4.1- Erection And Commissioning For (Sl. No. 2.1 Above) Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Sl. No. 2.2 To 2.6 Above). , 4.2- Erection And Commissioning For (Sl. No. 2.2 Above) Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.3- Erection And Commissioning For (Sl. No. 2.3 Above) Complete Dewatering Bin System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Asociated Equipments At Dewatering Bins As Per The Scope Of Specification. , 4.4- Erection And Commissioning For (Sl. No. 2.4 Above) Fly Ash Classificatication System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Classifier Silo,Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 4.5- Erection And Commissioning For (Sl. No. 2.5 Above) Fly Ash Bagging System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 4.6- Erection And Commissioning For (Sl. No. 2.6 Above) Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.7- Erection And Commissioning Of Bhel Free Supplied Items (Cast Basalt Lined Ba & Ca Pipes, Fly Ash Conveying Pipes From Classifier To Hcsd/Fine Fly Ash Silo And Hcsd Seamless Pipes) For Unit #1 & 2 As Per The Scope Of Specification. , 4.8- Erection,Testing , Commissioning & Operation Services For Bhel Supplied Items For Ahp - Ht Motors, Ht Swgr , Ht Transformer, Ups, Charger , Vms , Dcs ,As Per Scope Matrix And Detailed Technical Specification. , 4.9- Erection Testing , Commissioning & Operation Services Of Supply Items In Serial No 2.7, 2.8, 2.9, 2.10 Above. , 4.10- Training Of Employers Perssonel (End User) On Complete Ash Handling System As Defined In The Nit Specification , 4.11- Operation And Maintenace Of Complete Ash Handling Plantas Per The Scope Of Specification. Each Shift Will Be Of Of 8 Hrs Duty. , 5.0- Freight/ Transportation Charges , 5.1- Total Freight/ Transportation Charges For Supply Of All Plant & Equipment Including Spares

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 09-Aug-2024 Corrigendum-1 Pre bid clarifications Lot 1 Other 19-Aug-2024
2 17-Aug-2024 Corrigendum-2 Extension and Amendment to SCC Date 28-Aug-2024
3 23-Aug-2024 Corrigendum-3 Extension and Clarifications Lot 2 Date 06-Sep-2024
4 31-Aug-2024 Corrigendum-4 Clarifications Lot 3 Other 06-Sep-2024
5 03-Sep-2024 Corrigendum-5 Extension of bid submission end date Date 12-Sep-2024
6 09-Sep-2024 Corrigendum-6 Extension of bid submission end date Date 25-Sep-2024
7 17-Sep-2024 Corrigendum-7 Clarifications Lot 4 Other 25-Sep-2024
8 24-Sep-2024 Corrigendum-8 Extension of bid submission end date Date 03-Oct-2024

BOQ

Item/ Package: Ash Handling System PackageProject: Lara STPP Stage-II (2x800 MW), Chhattisgarh
Sl. No. Item Description
11.0- Design, Engineering (including 3D modelling of complete AHP), Selection of Equipment of Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification
21.1- Design, Engineering, 3D modelling of complete AHP including Electrical buildings in AHP, Selection of Equipment etc of Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification
32.0- Manufacturing, Supply, Inspection & Testing, shop floor testing, shop floor painting, packing & forwarding, touch up paints, consumables, commissioning spares etc of the following including customs clearance/ port clearance.
42.1- Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification (except item Sl. No. 2.2 to 2.6 below).
52.2- Complete Wet bottom Ash handling system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) from Boiler seal plate assembly, bottom flange of Eco, Eco Outlet, APH and Duct hoppers to the Bottom ash slurry sumps for Unit #1 & 2 as per the scope of specification.
62.3- Complete Dewatering bin system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) from slurry dury knife gate valves at dewatering bin top to the discharge of ash to the Mixing tanks for Unit 1&2 along with all associated equipment at dewatering bins as per the scope of specification.
72.4- Fly Ash Classification system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) at Classifier silo, Fine ash & Coarse ash hoppers for Unit #1 & 2 as per the scope of specification.
82.5- Fly ash bagging system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) at Fine fly ash silo to storing at Bagging shed, Retrieval and Truck loading for Unit #1 & 2 as per the scope of specification.
92.6- HCSD Pumps for Unit #1 & 2 as per the scope of specification.
102.7- LT Switchgear & Busduct for AHP
112.8- LT transformers for AHP
122.9- Cables- HT / LT power , Screen , Control , OFC and communication cables with all accessories for clamping, jointing & termination as per the scope specifications
132.10- Cable trays, tray supports , earthing & lightening protecton materials, conduits, steel for base framwes, hardwares, Illumination system, UPS, Plant requirements and all other electrical and C&I equipments as per scope matrix, which are not considered in 2.1 to 2.9above.
143.0- Spares-Manufacturing, Supply, Inspection & Testing, shop floor testing, shop floor painting, packing & forwarding, Intra site handling and Handing over to end customer.
153.1- Mandatory Spares for complete AHP as per as per the scope of specification ( other than item mentioned in Sl.No. 3.2 below ).
163.2- Mandatory spares for LT Switchgear & busduct for AHP
17Services-Erection & Commissioining,Operation & Maintenance,Training, Unloading,Receipt, Storage including intra site handling, painting at site,Trial run,Functional test, PG test, Handing over to end customer etc as per scope of specifications (Price quoted for sl.no. 4.1 to 4.11 shall be comprises of all the activities)
184.1- Erection and commissioning for (Sl. No. 2.1 above) Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification (except sl. No. 2.2 to 2.6 above).
194.2- Erection and commissioning for (Sl. No. 2.2 above) Complete Wet bottom Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) from Boiler seal plate assembly, bottom flange of Eco, Eco Outlet, APH and Duct hoppers to the Bottom ash slurry sumps for Unit #1 & 2 as per the scope of specification.
204.3- Erection and commissioning for (Sl. No. 2.3 above) Complete Dewatering bin system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) from slurry dury knife gate valves at dewatering bin top to the discharge of ash to the Mixing tanks for Unit 1&2 along with all asociated equipments at dewatering bins as per the scope of specification.
214.4- Erection and commissioning for (Sl. No. 2.4 above) Fly Ash Classificatication system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) at Classifier silo,Fine ash & Coarse ash hoppers for Unit #1 & 2 as per the scope of specification.
224.5- Erection and commissioning for (Sl. No. 2.5 above) Fly ash bagging system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) at Fine fly ash silo to storing at Bagging shed, Retrieval and Truck loading for Unit #1 & 2 as per the scope of specification.
234.6- Erection and commissioning for (Sl. No. 2.6 above) HCSD Pumps for Unit #1 & 2 as per the scope of specification.
244.7- Erection and commissioning of BHEL free supplied items (Cast basalt lined BA & CA pipes, Fly ash conveying Pipes from Classifier to HCSD/Fine fly ash silo and HCSD Seamless pipes) for Unit #1 & 2 as per the scope of specification.
254.8- Erection,testing , commissioning & Operation services for BHEL supplied items for AHP - HT Motors, HT SWGR , Ht transformer, UPS, Charger , VMS , DCS ,as per scope matrix and detailed technical specification.
264.9- Erection testing , commissioning & Operation services of supply items in serial no 2.7, 2.8, 2.9, 2.10 above.
274.10- Training of Employer\"s perssonel (End user) on Complete Ash handling system as defined in the NIT specification
284.11- Operation and Maintenace of complete Ash handling plantas per the scope of specification. Each shift will be of of 8 hrs duty.
295.0- Freight/ Transportation Charges
305.1- Total Freight/ Transportation charges for supply of all plant & equipment including spares

AI Tender Summary

OUR REF NO 44436923
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 03-10-2024
Authority
Authority Name Bharat Heavy Electricals Limited
Work Description Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Chhattisgarh , 1.0- Design, Engineering (Including 3D Modelling Of Complete Ahp), Selection Of Equipment Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 1.1- Design, Engineering, 3D Modelling Of Complete Ahp Including Electrical Buildings In Ahp, Selection Of Equipment Etc Of Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification , 2.0- Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Touch Up Paints, Consumables, Commissioning Spares Etc Of The Following Including Customs Clearance/ Port Clearance. , 2.1- Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Item Sl. No. 2.2 To 2.6 Below). , 2.2- Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.3- Complete Dewatering Bin System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Associated Equipment At Dewatering Bins As Per The Scope Of Specification. , 2.4- Fly Ash Classification System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 2.5- Fly Ash Bagging System (Mechanical, Civil & Structural, Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 2.6- Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 2.7- Lt Switchgear & Busduct For Ahp , 2.8- Lt Transformers For Ahp , 2.9- Cables- Ht / Lt Power , Screen , Control , Ofc And Communication Cables With All Accessories For Clamping, Jointing & Termination As Per The Scope Specifications , 2.10- Cable Trays, Tray Supports , Earthing & Lightening Protecton Materials, Conduits, Steel For Base Framwes, Hardwares, Illumination System, Ups, Plant Requirements And All Other Electrical And C&I Equipments As Per Scope Matrix, Which Are Not Considered In 2.1 To 2.9Above. , 3.0- Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Intra Site Handling And Handing Over To End Customer. , 3.1- Mandatory Spares For Complete Ahp As Per As Per The Scope Of Specification ( Other Than Item Mentioned In Sl.No. 3.2 Below ). , 3.2- Mandatory Spares For Lt Switchgear & Busduct For Ahp , Services-Erection & Commissioining,Operation & Maintenance,Training, Unloading,Receipt, Storage Including Intra Site Handling, Painting At Site,Trial Run,Functional Test, Pg Test, Handing Over To End Customer Etc As Per Scope Of Specifications (Price Quoted For Sl.No. 4.1 To 4.11 Shall Be Comprises Of All The Activities) , 4.1- Erection And Commissioning For (Sl. No. 2.1 Above) Complete Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) As Per The Scope Of Specification (Except Sl. No. 2.2 To 2.6 Above). , 4.2- Erection And Commissioning For (Sl. No. 2.2 Above) Complete Wet Bottom Ash Handling System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.3- Erection And Commissioning For (Sl. No. 2.3 Above) Complete Dewatering Bin System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Asociated Equipments At Dewatering Bins As Per The Scope Of Specification. , 4.4- Erection And Commissioning For (Sl. No. 2.4 Above) Fly Ash Classificatication System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Classifier Silo,Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , 4.5- Erection And Commissioning For (Sl. No. 2.5 Above) Fly Ash Bagging System (Mechanical, Civil & Structural,Electrical And C&I Equipment / Items) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , 4.6- Erection And Commissioning For (Sl. No. 2.6 Above) Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , 4.7- Erection And Commissioning Of Bhel Free Supplied Items (Cast Basalt Lined Ba & Ca Pipes, Fly Ash Conveying Pipes From Classifier To Hcsd/Fine Fly Ash Silo And Hcsd Seamless Pipes) For Unit #1 & 2 As Per The Scope Of Specification. , 4.8- Erection,Testing , Commissioning & Operation Services For Bhel Supplied Items For Ahp - Ht Motors, Ht Swgr , Ht Transformer, Ups, Charger , Vms , Dcs ,As Per Scope Matrix And Detailed Technical Specification. , 4.9- Erection Testing , Commissioning & Operation Services Of Supply Items In Serial No 2.7, 2.8, 2.9, 2.10 Above. , 4.10- Training Of Employers Perssonel (End User) On Complete Ash Handling System As Defined In The Nit Specification , 4.11- Operation And Maintenace Of Complete Ash Handling Plantas Per The Scope Of Specification. Each Shift Will Be Of Of 8 Hrs Duty. , 5.0- Freight/ Transportation Charges , 5.1- Total Freight/ Transportation Charges For Supply Of All Plant & Equipment Including Spares
Basic Detail
Tender No 77/24/6037/KMS
Bidding Type Tender
Location
City Raigarh
State Chhattisgarh
Key Dates
Publish Date 24 Sep 2024
Submission Date 03 Oct 2024
Open Date 03 Oct 2024
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3 Crore
Exemption Available
Document List
Technical_Enclosures_14_o_5.rar
19a2f210-88ad-449e-9125-37f28dc06684.html
BOQ_40111.xls
CommercialDocs.rar
EnquirySpecification.pdf
NIT.pdf
PQR.pdf
Technical_Enclosures_10_o_1.rar
Technical_Enclosures_11_o_2.rar
Technical_Enclosures_12_o_3.rar
Technical_Enclosures_13_o_4.rar
Technical_Enclosures_1_of_6.rar
Technical_Enclosures_2_of_7.rar
Technical_Enclosures_3_of_8.rar
Technical_Enclosures_4_of_9.rar
Technical_Enclosures_5_of_10.rar
Technical_Enclosures_6_of_11.rar
Technical_Enclosures_7_of_12.rar
Technical_Enclosures_8_of_13.rar
Technical_Enclosures_9_of_14.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 24, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 19, 2024
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Aug 28, 2024
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 06, 2024
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 06, 2024
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 12, 2024
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 25, 2024
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Sep 25, 2024
18:00 IST

Corrigendum-7 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 03, 2024
18:00 IST

Corrigendum-8 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 03, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 03, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
rar

Technical_Enclosures_14_o_5.rar

html

19a2f210-88ad-449e-9125-37f28dc06684.html

xls

BOQ_40111.xls

rar

CommercialDocs.rar

pdf

EnquirySpecification.pdf

pdf

NIT.pdf

pdf

PQR.pdf

rar

Technical_Enclosures_10_o_1.rar

rar

Technical_Enclosures_11_o_2.rar

rar

Technical_Enclosures_12_o_3.rar

rar

Technical_Enclosures_13_o_4.rar

rar

Technical_Enclosures_1_of_6.rar

rar

Technical_Enclosures_2_of_7.rar

rar

Technical_Enclosures_3_of_8.rar

rar

Technical_Enclosures_4_of_9.rar

rar

Technical_Enclosures_5_of_10.rar

rar

Technical_Enclosures_6_of_11.rar

rar

Technical_Enclosures_7_of_12.rar

rar

Technical_Enclosures_8_of_13.rar

rar

Technical_Enclosures_9_of_14.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders