Tender For Renovation Of Katchery Jetty At Kadmath; 1 Schedule - I- Dismantling & Reconstructingof western side jetty Approach at Kadmath:- Phase IDismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bedincluding hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of laboursetc complete. 2 RCC 1:0.9:1.80 using 20mm graded stone jelly for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite jelly, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete. 3 Providing and laying RCC with 1:11/2:3 mix (1cement 11/2 Msand,3 20mmchips) forHand railposts, handrails and lightpost etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips),transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete. 4 Centering and shuttering forHand railposts, handrails and lightpost etcincluding cost of all materials , form work, transportation charge of materials to the site, hire charge of woodcutting tools, vibrator and minor tools as per the direction of EIC etc complete. 5 Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Kadmath, cost of binding wires, all T&P required for the work and minor tools etc. complete. 6 Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) forwearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete. 7 Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides ofthe newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete. 8 Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete. 9 10 T 10 20 T 11 SCHEDULE - II - Dismantling & Reconstructingof western side jetty B/HEAD at Kadmath:- Phase IDismantling of existing damaged concretes of slab, longitudinal beams,cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bedincluding hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of laboursetc complete. 12 Providing & laying RCC 1:0.9:1.80 using 20mm graded stone agregate for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite stone, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete. 13 Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T&P required for the work and minor tools etc. complete. 14 Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) forwearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips),transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete. 15 Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides ofthe newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete. 16 Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete. 17 20 T Bollard