tender For The Work Of Issuing New Connection Of 100 Kw (Hv-2) By Making Independent Feeder For Uninterrupted Power Supply To Regional Public Analyst Food And Drug Laboratory Nd Regional Office Building Bamrauli Katara In Full Deposit Scheme Under Edd-1 Agra, 1 Carriage of ST Pole 13 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 2 Carriage of ST Pole 11 Mtr Long. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 3 Carriage of 8.5 Mtr Long PCC Pole from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 4 Carriage of 400 KVA T/F from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 5 Carriage of 11 KV 3x70 sqmm XLPE Cable & LT PVC Cable 400 sqmmfrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 6 Carriage of 11 KV Pilfer Proof Metering Cubicalfrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 7 Carriage of 11 KV VCB(I/C 600/300/5A, 350 MVA 24 VOLT) & 11 KV VCB (O/G CRT 200/100/5A, 350 MVA, 24 VOLT)from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 8 Carriage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators,clamps, Dist. Box, Barbed wire, Armour Rod and other line material, if required in Estimate/Package. 9 Erection and groutingof 11 Mtr. long ST Single Pole in 1:2:4 ratio (cement, sand and bricks ballast)including fixing ofall accessories for 11 KV/LT line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 10 Erection and groutingof 11 Mtr. long ST Double Pole in 1:2:4 ratio (cement, sand and bricks ballast)including fixing ofall accessories for 11 KV/LT line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 11 Erection and groutingof 13 Mtr. long ST Single Pole in 1:2:4 ratio (cement, sand and bricks ballast)including fixing ofall accessories for 11 KV/LT line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 12 Erection and groutingof 8.5 Mtr. long PCC Single Pole in 1:2:4 ratio (cement, sand and bricks ballast)including fixing ofall accessories for 11 KV/LT line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 13 Laying sagging stringing and binding and jumperingofACSR Weasel Conductor at 11 KV lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 14 Laying sagging stringing and binding and jumperingofACSR DogConductor at 11 KV lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 15 Providing & Fixing of Stone Pad 300x300x75 mm Make as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 16 Providing & Fixing of Number Plate as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 17 Providing & Fixing ofDanger Board as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 18 Providing & Fixing ofBolt & Nut as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 19 for the work of Chemical Earthing of 400 KVA T/F as per RESPO Manual.(All material provided by the contractor at his own cost) 20 Construction of plinth of 400 KVA T/F size 5 * 5 * 4 above ground level one ft below the ground level of 9 After Exavation of 4 earth brick ballast shall be provided and rammering willbe done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. .(All material provided by the contractor at his own cost) 21 Net Fencing of400 KVA T/F Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut ..(All material provided by the contractor at his own cost) 22 Laying, Stringing, Binding of 11 KV 3x70 sqmm XLPE overhead cable on PCC/Round Poles to connecting the Lines as per RESPO NORMS. 23 Hoisting and Stringing of 11 KV 3x70 sqmm XLPE overhead Cable with 6 Dia G.I. Pipe includes unroling cutting / megaring & sealing both ends as per Norms. (Above G.I. Pipe 6 Dia provide & fixing by Contractor at his own cost). 24 Laying, Stringing, Binding of LT PVC cable 400 sqmm to connecting the Lines as per RESPO NORMS. 25 Installation of 11 KV I/C & O/G VCB in proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works. 26 Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 27 Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 28 Making HT T off connection on existing mains labour, T &P and carrier etc. required for proper completion of work. 29 Filling of 11KV 3×70 sqmm outdoor/Indoor cable boxes and making connection as per direction of supervising engineer. 30 Installation of D.O. Fuse set as per RESOP Manual. 31 Installation of 11 KV Pilfer Proof Metering Cubical & Making connection. 32 Fixing of TPMO on Poles as per Site requirment and RESPO Norms. 33 Painting of 13/11 Mtr. Long ST Poles (41 Nos.) with single coat of red oxide primer and Double coat of Aluminium paint as per RESPO norms. 34 Installation of 400 KVA T/F on newly constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work