Tender For Fabrication And Installation, Repair Work Of Steel Gates Of Miners Under The Control Of National Water Management Project, Sharda Canal Division, Shahjahapur (Lot No.-03), Shahjahanpur-Uttar Pradesh
TDR : 44359369
Tender Notice
BOQ
Expired
Shahjahanpur
Uttar Pradesh
Tender For Fabrication And Installation, Repair Work Of Steel Gates Of Miners Under The Control Of National Water Management Project, Sharda Canal Division, Shahjahapur (Lot No.-03)
Name of Work: राष्ट्रीय जल प्रबन्ध योजना, शारदा नहर खण्ड, शाहजहाँपुर के नियंत्रणाधीन माइनरों के स्टील गेटों के फैब्रीकेशन एवं स्टालेशन, मरम्मत के कार्य (Lot No.-03)
Sl. No.
Item Description
1
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter.
2
C.C. 1:3:6 i/c cost of all material, labour and T&P etc.
3
1st class Brick Masonary in 1:3with cement and corse sand i/c cost of all material, labour and T&P with all lead and lift for proper completion of work approved by Engineer - in- charge etc.
4
Cement pointing in 1:2 (Deep struct ) on Brick masonry i/c cost of material, labour and T&P etc.
5
Color washing with lime on udercorated wall surface two coats over and and including a primary coat including all material ,labour and T&P etc.
6
Earth work in embankment by power transpotad earth with a led beyond 200 M and upto 1 k.m. encluding execavation, loding, unloding, manual compection, dressing and all lifts complets.
7
Laying Boulder in Toe wall in wire crates work (Wire crate of size 2.50m x0.60mx1.00m )including cost of all material and labour and T&P required for proper completion of work.
8
R.R. Stone Masnory (1:4 Cement Mortar) in construction of toe wall and sleepers for boulder pitching including cost of all material and labour and T&P required for proper completion of work.
9
Laying Pea Gravel 4 to 12 mm including cost of all material and labour and T&P required for proper completion of work.
10
Laying Pea Gravel 12 to 20 mm including cost of all material and labour and T&P required for proper completion of work.
11
Supplying and laying boulder 20 to 40 kg on side slopes and d/s of syphon including cost of all material and labour and T&P required for proper completion of work.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.