| 1 | Carriage of 25 kva 11/0.4kv New Transformer from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 2 | Carriage of STP 11 Mtr Long from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 3 | Carriage of PCC Pole 8.5 MTR LONG from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 4 | Carriage ofLT ABC 3x120+1x95+1x16 SQ MM from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 5 | Carriage of ABC CANDUCTOR 3×50+1×35+1x16 SQ MM from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 6 | Carriage of ACSR weasel Conductor from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 7 | Carriage of line material as per site requirement:- TOP CHANNEL 100x50x2240- 12 Nos, MS CHANNEL 100*50*5 MM- 130 Kg, DROPER CHANNEL 100*50*2240- 10 Nos, MS ANGEL 65*65*6MM- 70 Kg, MS ANGEL with complete set- 8 Nos, 11 KV COMP POLY DISC INSULATOR - 18 Nos, 11KV COMPOSITE POLYMER PIN INSULATOR- 18 Nos, 11KV PIN INSULATOR with fitting- 54 Nos, 11KV PIN INSULATOR- 51 Nos, 11 KV PIN WITH NUT- 51 Nos, 11 KV DRAW OUT FUSE SET- 9 Nos, 11 KV FUSE SET- 12 Nos, 11 KV TPMO SET- 4 Nos, STAY SET- 18 Nos, LT DISTRIBUTION BOX (3 PHASE)-14 Nos, LT PVC CABLE 3.5×25 SQMM - 90 Nos, BASE CHANNEL 100*75*75 Complete set- 6 Nos, TF BASE angle 65*65*6*2028- 20 Kg, BASE CHANNEL- 8 Nos, 11 KV DISC FITTING 45KN- 12 Nos, 11 KV DISC INSULATOR WITH FITTING- 24 Nos, T - OFF CHANNEL- 12 Nos, DEAD CLAMP- 21 Nos, STAY INSULATOR- 2 Nos, STAY CLAMP- 4 Nos, STAY WIRE- 20 Kg, V CROSS ARMS- 9 Nos, DEAD END CLAMP WITH EYE HOOK- 16 Nos... etc from Store center to various work site loading and unloading both side. distance 1 km to 50 km. |
| 8 | Erection of ST POLE 11 MTR LONG (Double Pole- 16 Nos) complete in all respect as per respo Norms. |
| 9 | Erection of PCC POLE 8.5 MTR LONG complete in all respect as per respo Norms. |
| 10 | Providing and Grounting/Concreting of Pole complete in all respect as per respo Norms. |
| 11 | Providing and Complete EARTHING OF T/F WATER LAVEL with all accessories complete in all respect as per respo Norms. |
| 12 | Providing and Earthing of Pole complete in all respect as per respo Norms. |
| 13 | Safely placing of 25 kva new T/F on the Double Pole by the help of Crane/Chain Cuppie complete in all respect as per Respo Norms at various site. |
| 14 | Laying, Lifting and sagging of LT ABC 3x120+1x95+1x16 SQ MM complete in all respect as per respo Norms. |
| 15 | Laying, Lifting and sagging of ABC CANDUCTOR 3×50+1×35+1x16 SQ MM complete in all respect as per respo Norms. |
| 16 | Laying, Lifting, Jumpring and sagging of ACSR weasel Conductor complete in all respect as per respo Norms. |
| 17 | Complete Fixing/Installation of different kind of line material as per site requirement:- TOP CHANNEL 100x50x2240- 12 Nos, MS CHANNEL 100*50*5 MM- 130 Kg, DROPER CHANNEL 100*50*2240- 10 Nos, MS ANGEL 65*65*6MM- 70 Kg, MS ANGEL with complete set- 8 Nos, 11 KV COMP POLY DISC INSULATOR - 18 Nos, 11KV COMPOSITE POLYMER PIN INSULATOR- 18 Nos, 11KV PIN INSULATOR with fitting- 54 Nos, 11KV PIN INSULATOR- 51 Nos, 11 KV PIN WITH NUT- 51 Nos, 11 KV DRAW OUT FUSE SET- 9 Nos, 11 KV FUSE SET- 12 Nos, 11 KV TPMO SET- 4 Nos, STAY SET- 18 Nos, LT DISTRIBUTION BOX (3 PHASE)-14 Nos, LT PVC CABLE 3.5×25 SQMM - 90 Nos, BASE CHANNEL 100*75*75 Complete set- 6 Nos, TF BASE angle 65*65*6*2028- 20 Kg, BASE CHANNEL- 8 Nos, 11 KV DISC FITTING 45KN- 12 Nos, 11 KV DISC INSULATOR WITH FITTING- 24 Nos, T - OFF CHANNEL- 12 Nos, DEAD CLAMP- 21 Nos, STAY INSULATOR- 2 Nos, STAY CLAMP- 4 Nos, STAY WIRE- 20 Kg, V CROSS ARMS- 9 Nos, DEAD END CLAMP WITH EYE HOOK- 16 Nos... etc complete in all respect as per respo Norms. |
| 18 | Supply & Fixing/Installation BARBED WIRE at various site complete in all respect as per respo Norms. |
| 19 | Supply & Fixing/Installation EARTH ROD 2540*20MM at various site complete in all respect as per respo Norms. |
| 20 | Supply & Fixing/Installation EARTHING SET at various site complete in all respect as per respo Norms. |
| 21 | Supply & Fixing/Installation STAY SET 16*1800 at various site complete in all respect as per respo Norms. |
| 22 | Supply & Fixing/Installation STAY WIRE GI 7/8 SWG at various site complete in all respect as per respo Norms. |
| 23 | Supply & Fixing/Installation DANGER BOARD WITH CLAMP at various site complete in all respect as per respo Norms. |
| 24 | Supply & Fixing/Installation CONCEREETING OF Stay at various site complete in all respect as per respo Norms. |
| 25 | Supply & Fixing/Installation CONCEREETING OF SUPPORT at various site complete in all respect as per respo Norms. |
| 26 | Supply & Fixing/Installation NUT BOLT WITH WASHER at various site complete in all respect as per respo Norms. |
| 27 | Supply & Fixing/Installation CLEAMP WITH NUT BOLT at various site complete in all respect as per respo Norms. |
| 28 | Supply & Fixing/Installation STONE PAD 300*300*75 at various site complete in all respect as per respo Norms. |
| 29 | Supply & Fixing/Installation ALUMINIUM BINDING WIRE at various site complete in all respect as per respo Norms. |
| 30 | Supply & Painting REDOXIDE PAINT at various site complete in all respect as per respo Norms. |
| 31 | Supply & Fixing/Installation NUMBER PLATE at various site complete in all respect as per respo Norms. |
| 32 | Supply & Fixing/Installation J HooK at various site complete in all respect as per respo Norms. |
| 33 | Supply & Fixing/Installation PRC CLAMP at various site complete in all respect as per respo Norms. |
| 34 | Supply & Fixing/Installation SUSPENTION CLAMP WITH EYE HOOK at various site complete in all respect as per respo Norms. |
| 35 | Supply & Fixing/Installation SUSPENTION CLAMP at various site complete in all respect as per respo Norms. |
| 36 | Supply & Fixing/Installation LT PIERCING CONNECTOR 95/50 at various site complete in all respect as per respo Norms. |
| 37 | Supply & Fixing/Installation MS HOLDING CLAMPS at various site complete in all respect as per respo Norms. |
| 38 | Supply & Fixing/Installation GI WIRE 6 SWG at various site complete in all respect as per respo Norms. |
| 39 | Supply & Fixing/Installation MS ANGEL at various site complete in all respect as per respo Norms. |
| 40 | Supply & Fixing/Installation Grouting of Stay at various site complete in all respect as per respo Norms. |
| 41 | All other works complete in all respect as per site requirement. |