| 1 | S/F of 30 mtr high mast pole of approved make with rising system hot galvanized pole heaving sheet thickness 4mm top dia minimum 150mm bottom dia 500mm and base plate 32 mm thick in 1:3:6 cement concrete including excavation back filling etc comp. in all respect. |
| 2 | S/F top mounting finial done & accessories (Market Rate) |
| 3 | National Flag (20\"x30\") market Rate. |
| 4 | S/F of single unit avaition light completed (SCh no-409) CAT AAA |
| 5 | S/F LED flood light having die cast alluminium body and diffuse/reflector with driver set suitable for 175 to 200 watt confirming to ip 66 protection and above protection completed in all respect (no-1455) |
| 6 | S/W of submain with 2 nos of 2.5 sqm pve insulated 1100 grade single core. Completed in all respect (Sch no-1307-c) |
| 7 | Cable sd/I of alluminium conductor PVC insulated armound served sheated 25 sqmm 3-1/2 core cable complete in all respect (SCH no-501j) |
| 8 | S/F of 7 mtr high G.I octagonal pole for flood light with painting (SCh no-641) |
| 9 | Supply and burying of earthing of 600x600x6mm gi place vertically 20mm dia gi pipe for watrring pannel complete in all respect (SCH-702) |
| 10 | S/F of 2 kw algonthm bassed automatic switch ip66 box water proof complete (sch-807) |
| 11 | Eraction and commissioning of flag mast system (non schedul item) |
| 12 | S/F of granite stone for inauguration |
| 13 | Dismentling of old damage rcc chap -45 item-694, sche-2022 |
| 14 | E/W in excavation in ordinary soil including lift up to 1.5m chap -22, item 251, sche-2022 |
| 15 | Cement concrete with 4 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 8:4:1, including supply of all materials, labour, tools & Plants etc required for proper completion of the work as per direction of chap-5, item-281 sche-2022 |
| 16 | M-150 brick work in 1:4 one cement and three course sand of 1.75 F.M. mortar in foundation and plinth including supply of all materials labour, T&P etc. required for proer complition of the work S.I. No. 307(a) sche-2022 |
| 17 | 12mm thick C/P 1:4 cement and course sand SIN. 584 (A), Sche-2022 |
| 18 | P/I of granite stone for plateform in ratio 1:3 |
| 19 | S/af of stainless steel for railing |
| 20 | Electric connection 3 kw at site (to be paid as per actual expense slip received from hydel dept) |
| 21 | Operation and maintenance for three years including washing and replaceing of flags, Maintaing of lights. |
| 22 | ADD Cess 1% |
| 23 | Add [email protected]%= |