| 1 | Removing old unserviceable thermal insulation and supply and insulation of thermal insulation on ducts / chiller pipe line exposed to sun light using closed cell O nitrite rubber elastometric insulation of density 40-55 kg/m3 thermal conductivity of 0.037 W/mk at 20 degree celcius mean temp and MZ 7000 (without any additional vapour barrier) and with chemical treated factory laminated Woven fibre glass cloth with 200+/- 20 gsm to be applied on ducts manufactureds recommended rubber based adhesive in a blend of solvents complete all as specified and as directed. |
| 2 | Servicing of AC plants of 50 TR capacity (01 No working and 01 No standing), safety checking and replacement of burnt outsingle core copper cable as per site condition with copper lugs servicing micro processor control electric panel pnematric rewiring of controller servicing of all AHU of any CFM cleaning and washing of Filter of AHU of any size / any CFM, cleaning of cooling coil, Greasing of condensor / chiller motor pump and filling Glantory with existing size, if any rubber packing is unserviceable to change new rubber packing and cleaning and washing of syphon, cleaning and washing of cooling coil for using a chemical C-shine (Alkaline coil cleaner and brightener) and testing the unit complete all as specified and as directed. |
| 3 | Supply, installation and testing in replacement of Cooling coil circuites inside AHU(Each AHU 38 Nos) as per suitable existing size all complete all as specified and as directed. |
| 4 | Supply, installation and testing in replacement of Heating coils circuitinside AHU ( Each AHU 19 Nos) as per suitable existing size all complete all as specified and as directed. |
| 5 | Servicing / Cleaning andtesting of Electrically Operated Pan type Humidifiercapacity9 KW alongwith all necessary items fitting and all suitable / all necessary electrical wiring in between electricalpanle to Humidifier complete all as specified and as directed. |
| 6 | Servicing / Cleaning andtesting of Pressurization unit in cold water line( PSU-225 as per site) alongwith all necessary items fitting and all suitable / all necessary electrical wiring omplete all as specified and as directed. |
| 7 | Servicing / Cleaning andtesting of Pressurization unit in Hotwater line( PSU-225 as per site) alongwith all necessary items fitting and all suitable / all necessary electrical wiring omplete all as specified and as directed. |
| 8 | Removing old unserviceable port Y strainer and material and labour for Y strainer 80mm size of both end flanged including supply and welding flange of size 80 mm two nos complete all as specified and as directed. |
| 9 | Removing old unserviceable port Y strainer and material and labour for Y strainer 65mm size of both end flanged including supply and welding flange of size 65 mm two nos complete all as specified and as directed. |
| 10 | Removing old unserviceable port Y strainer and material and labour for Y strainer 50mm size of both end flanged including supply and welding flange of size 50 mm two nos complete all as specified and as directed. |
| 11 | Supply and fix in repairs Gun Metal gate valve with Iron wheel head screwed both ends for GI steel tubing 25 mm dia including taking down unserviceable valves complete all as specified and directed |
| 12 | Supply and fix in repairs Gun Metal gate valve with Iron wheel head screwed both ends for GI steel tubing 32 mm dia including taking down unserviceable valves complete all as specified and directed |
| 13 | Taking down old unserviceable butter fly valve and material and labour for butter fly valve of size 80 mm with rubber packing complete all as specified and as directed. |
| 14 | Taking down old unserviceable butter fly valve and material and labour for butter fly valve with rubber packing of size 65 mm complete all as specified and as directed. |
| 15 | Taking down old unserviceable butter fly valve and material and labour for butter fly valve of size 50 mm with rubber packing complete all as specified and as directed. |
| 16 | Taking down old unserviceable butter fly valve and material and labour for butter fly valve of size 32 mm with rubber packing complete all as specified and as directed. |
| 17 | Taking down old unserviceable butter fly valve and material and labour for butter fly valve of size 15 mm with rubber packing complete all as specified and as directed. |
| 18 | Supply, installation and testinginreplacement of 3 Way valve with actuator of suitable size of Pipe line Complete and all as specified. |
| 19 | Supply, installation, testing and commissioning in replacement of Cast Iron manual balancing valves in chilled water and condensed water plumbing and adequately supported as per specifications of size 80 mm complete all as specified and as directed. |
| 20 | Supply, installation, testing and commissioning in replacement of Cast Iron manual balancing valves in chilled water and condense water plumbing and adequately supported as per specifications of size 65 mm complete all as specified and as directed. |
| 21 | Supply, installation, testing and commissioning in replacement of Cast Iron manual balancing valves in chilled water and condense water plumbing and adequately supported as per specifications of size 50 mm complete all as specified and as directed. |
| 22 | Supply, fixing, testing and commissioning in replacement of80 mm size non-return valve with dual plate of CI body SS plates vulcanized NBR seal flanged end and PN 1.6 pressure rating for chilled / hot water circulation including insulation complete all as specified and as directed. |
| 23 | Supply, fixing, testing and commissioning in replacement of65mm size non-return valve with dual plate of CI body SS plates vulcanized NBR seal flanged end and PN 1.6 pressure rating for chilled / hot water circulation including insulation complete all as specified and as directed. |
| 24 | Supply, fixing, testing and commissioning in replacement of50mm size non-return valve with dual plate of CI body SS plates vulcanized NBR seal flanged end and PN 1.6 pressure rating for chilled / hot water circulation including insulation complete all as specified and as directed. |
| 25 | Taking down old unserviceable water flow switch of any size,supply and fixing testing of water flow switch ( Flow rate 150 psi) as per existing make and model /suitable size including suitable wiring with control panel complete all as specified and as directed. |
| 26 | Taking down unserviceable / burnt scroll compressor of capacity 20 TR andMaterial & Labour for scroll compressor of capacity 20 TR suitable for 60 TR (3 x 20 TR)air cooled plant of make Blue Star including removing of refrigerent empty cylinder R-407 flushing the system with nitrogen gas pressure testing and leak repairing vaccumising the system 700 micron charging the refrigerent R-407c complete all as specified and as directed.Note : Initial charge of refrigerent will be paid seperately. |
| 27 | Taking down unserviceable / burnt scroll compressor of capacity 20 TR and reconditioning of scroll compressor of capacity 20 TR suitable for 60 TR (3 x 20 TR)air cooled plant of make Blue Starincluding removing of refrigerent empty cylinder R-407 flushing the system with nitrogen gas pressure testing and leak repairing vaccumising the system mcharging the refrigerent R-407c complete all as specified and as directed.Note : Initial charge of refrigerent will be paid seperately. |
| 28 | Supply and fix in replacement PLC based control module with digital display of Package / Central type AC unit suitable for 50 TR capacity having start / stop functions, settings option to change the seetings as per requirement complete all as specified and as directed. |
| 29 | Taking down old unserviceable expansion valve 13/20 TR compressor suitable for using 50 TR air cooled centralised AC plant double unit complete all as specified and as directed. |
| 30 | Taking down old unserviceable Air vent valve 15 / 20 mm and supply and fixing testing of air vent valve 15 mm complete all as specified and as directed. |
| 31 | Providing and fixing in replacement of position the industrial type pressure gauges complete all as specified and as directed. |
| 32 | Supply and fix in replacement of pressure transducer 16/18 & 30/40 bar suitable for 50 TR air cooled central type AC plants complete all as specified and as directed. |
| 33 | Supply and fix in replacement of Chilled water sensor complete all as specified and as directed. |
| 34 | Supply and fixing in replacement of pressure switch (HP switch) upto 260 PSI NO and 190 PSI NC including removing of refrigerent empty cylinder and checking of pressure testing leak testing vaccume the system of 700 micron charging the refrigerent in the system complete all as specified and as directed. |
| 35 | Supply and fixing in replacement of low pressure switch (LP switch) upto 25 PSI NO and 45 PSI NC including removing of refrigerent empty cylinder and checking of pressure testing leak testing vaccume the system of 700 micron charging the refrigerent in the system complete all as specified and as directed. |
| 36 | Disconnecting, dismantling the defective three phase induction motor 415 volts 50 Hz of any RPM for motor of capacity up to 15 HP ( AHU Motor) and rewinding with super enamelled copper wire of best quality of existing size / gauge and weight including replacement of insulation material, varnish bearing connection plate and all other petty items required to make the motor in functional and reassembling the motor including installation commissioning and testing on full load all as specified and as directed.NOTE :-(i) Disconnecting and removing the electric motor from installed position and loading unloading, transporting to authorised/approved work shop(ii) Dismantling existing burnt winding from the motor and rewinding complete with super enamelled copper winding wire of existing guage including all material such as insulated paper sleeves tape varnish etc complete for class F insulation and including shaft metalising, bearing cover slieving , necessary replacement of cooling fan, nut-bolt etc(iii) Loading, unloading and transporting motor & reinstalling in position and in alignment including electric conection commissioning and testing in actual working condition for 8 hours continuosly to check the performance on full load and designed RPM to the complete satisfaction of Engr-in-Charge all as specified and directed |
| 37 | All as per Sr Item No 36 here-in- before but for Induction Motor of Capacity 7.5 / 10 HP (Chiller Motor) |
| 38 | All as per Sr Item No 36 here-in- before but for Induction Motor of Capacity Upto 5HP (HWG Motor) |
| 39 | Disconnecting, dismantling of centrifugal monoblock pump set of Pump 7.5/10HP Hp Capacity (Chiller Pump) of any RPM and dismantling and replacement ofdefective parts such as impeller nut, glant, impeller key, gland packing water deflector bush bearings sleeve, gasket, volute stud and nuts suction and delivery flange and stud and nuts and all other petty items required to make the pumpset in functional and reassembling the pumpset including installation commissioning and testing all as specified and as directed. |
| 40 | All as per Sr Item No 39 here-in- before but For Pumpup to 5 HP Capacity (HWG Pump) |
| 41 | Servicing / Cleaning and testingof HWG capacity 55 KW / 63 KW capacity safely, M & Lchecking and replacement of burnt out / not working of thermostate / suitable elements as per site conditions , all internal control wiring alongwith all necessary connections check and repair complete all as specified and directed |
| 42 | Supply and fix in replacement of step conroller microprocessor based multistae electronic progressive staging sequencer with thermistor sensor to control the unit in stages with relay output 8A for hot water generatopr 55KW/63 KW complete all as specified and as directed. |
| 43 | Supply , installation and testing in replacement ofDigital step contoller of Hot Water Generator 55 KW / 63 KW capacity along with Voltmeter and apm meter with all necessary wiring / connection complete as specified and as directed. |
| 44 | Supply and installation testing and commissioning in replacement of electric rod heater of 6.12 KW for hot / As per suitable Capacity of Hot water generator complete all as specified and as directed. |
| 45 | Taking down old unservicable anti freeze thermostat suitable to 39/50Rplant capacity and supply, fixing and testing of anti freeze thermostat of suitable size including suitable wiring with controler panel complete all as specified and directed |
| 46 | Material and labour for replacement of terminal connecting plate suitable for 15//10/7.5 HP/5 HP/3HP/2HP of monoblock pumpset complete all as specified and as directed. |
| 47 | Supply and fixing in replacement of air cooling unit as per existing size and capacity 250 CFM of copper piping with aluminium finches complete all as specified and as directed. |
| 48 | Material and labour in replacement of fanbelt any size of suitable model for using of AHU motor,complete all as specified and as directed. |
| 49 | Supply and charging of Refrigerent R-407C or as per site conditionin sealed container of 45 Kg complete all as specified and as directed. |
| 50 | Preparation of old painted surface of MS / CI pipesinlet / out let and applying a coast ofsynthetic enamel paint as per colour code given by the depttcomplete all as specified and as directed. |
| 51 | Supply, laying and testing in replacement of MS pipes (ERW steel) including cutting bending and welding as per site requirement and specials with flanged and drilled ends, jointing materials like nuts, bolts and gasket etc of nominal dia 80 mm as per IS 3589 (1981) thickness 6.0 mm fixed in replacement of existing unserviceable, by cutting road and footpath and making surface good as previous complete all as specified and as directed. |
| 52 | Supply, laying and testing in replacement of MS pipes (ERW steel) including cutting bending and welding as per site requirement and specials with flanged and drilled ends, jointing materials like nuts, bolts and gasket etc of nominal dia 50 mm as per IS 3589 (1981) thickness 6.0 mm fixed in replacement of existing unserviceable, by cutting road and footpath and making surface good as previous complete all as specified and as directed. |
| 53 | Supply, laying and testing in replacement of MS pipes (ERW steel) including cutting bending and welding as per site requirement and specials with flanged and drilled ends, jointing materials like nuts, bolts and gasket etc of nominal dia 32 mm as per IS 3589 (1981) thickness 6.0 mm fixed in replacement of existing unserviceable, by cutting road and footpath and making surface good as previous complete all as specified and as directed. |
| 54 | Supply and fix in replacement of damper actuator (autometic fresh air honey well) suitablein Existing AHU ( 25 TR ) complete all as specified and as directed. |
| 55 | Providing and fixing in replacement of position the mercury-in-glass industrial type thermometers gauges as per site condition complete all as specified and as directed. |
| 56 | Supply and fix in replacement of DOL starter for Upto 10 HP motorcomplete all as specified and as directed. |
| 57 | Supply and fix in replacement of AC contactor 63 Amp 415 volts complete all as specified and as directed. |
| 58 | Supply and fix in replacement of AC contactor 100 Amp 415 volts complete all as specified and as directed. |
| 59 | Supply and fix in replacement of over load relay 9 to 15 amp complete all as specified and as directed. |
| 60 | Supply and fix in replacement of over load relay 6 to 10 amp complete all as specified and as directed. |
| 61 | Taking down old unservicable heating strips and supply and fixing of heating strip suitable to 13/20 TR compresser with all necessary connections complete all as specified and directed |
| 62 | Taking down unserviceable liquid line filter drier and material and labour for liquid line filter drier suitable for 20 TR air cooled scroll unit of make Blue star including removing of refrigerent empty cylinder R-407cflushing the system with nitrogen gas pressure testing and leak repairing vaccumising the system 700 micron, charging the refrigerent of R-407 / R22 or as per site conditions complete all as specified and as directed. Note :- Refrigerent will be paid separately. |
| 63 | Taking up condenser / Evaporatorfrom AC plant and transporting to existing make / approvedmanufacture workshop and removing old unserviceable copper tube from evaporator/ condenser of Air cooled AC Palnt and supply, fixing testing and commissioning copper tube cell forexisting size and capacity and nos of copper cell for condenser / evaporator suitable for 50 TR Aircooled scroll unit complete all as specified and as directed.Note : Warranty of condenser / evaporatordefect liability period is minimum two years after completion of contract. |
| 64 | Dismaltling of old angle iron and Material & Labour for Angle iron 50x50x5 mm for post & struts for support to cold water and hot water pipe line of AC Plant including cutting tops to shape as directed, drilling holes, nothich for wire etc including all necessary drilling, bolting or riveting, etc conforming to FE 410 W Gde E-250 |
| 65 | Supply and fixing in replace of flexible PVC Pipe of size 15mm complete all as specifed and directed. |
| 66 | Supply and fix in replace of MCB TPN 40-100 Amp 415 volt , 10ka complete all as specified and as directed. |
| 67 | Supply and fixing in replacement of MCB SP 6 To 32 amp rating 240V, 10KA \"C\" curvecomplete all as specified and directed. |
| 68 | Supply and fixing in replacement of MCBSPN 32 AMPrating 240V, 10KA \"C\" curvecomplete all as specified and directed. |
| 69 | Supply and fixing in replacement of MCB SPN 40 to 63 AMP rating 240V, 10KA \"C\" curvecomplete all as specified and directed. |
| 70 | Dismaltling / removing of old cable tray and S & F preforated cable tray hot dip galvanised of size3mm mm thick, 200mm width and 40mm height made out of GI sheet and all as specified and directed. |
| 71 | Supply , fixing and testing in replacement of AHU Pre Filter overall size as per site 610x305x50mm , all complete fitting as per site condition complete all as specified and as directed. |
| 72 | Supply , fixing and testing in replacement of AHU Pre Filter overall size as per site 610x610x50mm , all complete fitting as per site condition complete all as specified and as directed. |
| 73 | Supply , fixing and testing in replacement of AHU Secondary / BAG filter overall size as per site 610 x 305x305mm and all fitting as per site requirment, all complete fitting as per site condition complete all as specified and as directed. |
| 74 | Supply , fixing and testing in replacement ofAHU Secondary / BAG filter overall size as per site 610 x 610x305mm and all fitting as per site requirment, all complete fitting as per site condition complete all as specified and as directed. |
| 75 | Supply and fixing in replacement of air fire dampner suitable as per site conditition complete and as specified. |
| 76 | Supply, assembly and erection in repair of GI sheet with C & SS rectangular/square duct made out of L shapped hollow profile, duly factory boxed, incl all accessories such as corner, cleat, carraige bolt, gasket and appropriate sealant on longitudinal joint etc includingall any other necessary itmes complete of size 24 gauge complete all as specified and as directed.. |
| 77 | Material & Labour in repair for duct insulation with resin bonded fibre glass wool roll of density 24 Kg/Cum, with factory laminated aluminium vapour barrier, thickness of insulation 50 mm all as specified and including the following :-(a) Material & Labour for cleaning the duct surface (to be insulated) by scrapping carefully with wire brush etc. to make the surface completely free of milllscale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage.(b) M & L for applying rubber based adhesive CPRX compound. (c) M & L for sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50 mm wide, to make the insulation leakproof.(d) M & L for securing the insulation with and including mechanically fastened nylon / steel straps of size 12 mm / 50 mm at maximum intervals of 1.2 mtr. |
| 78 | Compressive maintenance and repairs to AC plants including attend break down complaints and stand by duty on the days of VIP visits for theScroll type Water Cooled AC plant 2 x 39 TR and 1 x 39 TR Standby at New Ac Plant Tech Area. Make:- BLUE STAR Air Conditioners, electrically operated with automatic / manual dual controlled operation located in the various technical complex bldg all as specified and directed. |
| 79 | All as per Sr Item No 78 here-in- before but Scroll type Water Cooled AC plant 2 x 37.5 TR and 1 x 37.5 TR Standby at OLD ACPlant Tech Area. Make:- BLUE STAR. |
| 80 | All as per Sr Item No 78 here-in- before but Scroll type Air cooled AC Plant2 x 50 TR ( 01 x Stand By) total 24 Nos AC Plants at AKASH Complex ,Make:- Blue Star . Note for Item No - 78 to 80 :- (i) The rate quoted by the contractor include the rate for inspection / maintenance and testing of Air Conditioning Plant only through the authorised OEM service engineer, checking of water flow, over heating of compressor, serviceability of all components like refrigerant gas pressure switch (High/Low) sensors, condenser / chiller water flow switches, crank case heater, thermostatic expansion valve, electric controle centre micro computer control system, PCBs, SMPS, MCCB, MCBs control wiring etc.(ii) The duration of the checking is once in every month throughout the currency of contract through OEM authorized service engineer/dealers.(iii) Periodical test report to be submitted monthly through the authorized OEM service engineer duly signed.(iv) Report of monthly inspection maintenance carried out by the contractor also to be submitted on every inspection / maintenance and after rectification of any breakdown.(v) Apart from the monthly periodic inspectionthe contractor is liable for conducting inspection/maintenance/repair on call basis through the OEM if required.On call the contractor is required to attend the complaint within 24 hrs.Not attending the complaint within 24 hrs contractor shall liable to pay a penalty Rs 2000/- per day.(vi) The components/spares/consumablesrequired for AC plants will be measured and paid separately under the relevent items here in after. |