| 1 | For the work of Construction of 06 NOSNewLT 250KVA T/FunderEUDD-I, Bareilly for strengtheningofElectrification System Under EUDD-I, Under Business Plan-2024-25 Bareilly. |
| 2 | Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading |
| 3 | ST Pole 11 Meter long |
| 4 | PCC Pole (8.5 mtr. Long) |
| 5 | 11 KV Cable jointing kit O/D (3x120 Sqmm) |
| 6 | 11 KV XLPE Cable(3x120 Sqmm) |
| 7 | LT XLPE Cable (1x400 sqmm) |
| 8 | AB Cable (3x120 sqmm.) |
| 9 | New 250 KVA T/F |
| 10 | Weasel Conductor |
| 11 | 3-Phase Distribution Box |
| 12 | other associatedmaterials |
| 13 | Erection Work |
| 14 | Erection of S.T. D / Pole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 15 | Erection of PCC.Pole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 16 | Construction of plinth complete (2.0x2.0x1.5) meter, by providing firstclass Bricks work as per RESPO norms. (Material will be supplied by Contractor). |
| 17 | EarthingofPolesby MS Earthing Rod . |
| 18 | Erection of 250 KVA T/F on Plinthby laying of cable ,Jumpering & commissioning of T/F . |
| 19 | Earthing of distribution T/Ffor body & neutral upto water level with GI Pipe of 1.5\" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
| 20 | The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor). |
| 21 | Stringing and sagging AB Cable (3x120 sqmm.) |
| 22 | Lying of LT XLPE Cable 1x400 sqmm. |
| 23 | Erection and Fixing 11 KV Cable jointing kit O/D (3x120 Sqmm) |
| 24 | Laying of 11 KV XLPE Cable(3x120 Sqmm. |
| 25 | Laying of Weasel Conductor |
| 26 | Erection and fixing 3-phase Distribution Box and making all Connections |
| 27 | Supply & Fixing ofFollowing Items |
| 28 | G.I. Pipe 06 Inch Dia. |
| 29 | Stone Pad |
| 30 | Barbed wire |
| 31 | Piercing connector |
| 32 | Lug (400 sqmm) |
| 33 | S/s Holding Clamps . |
| 34 | Holding Clamps forT-OFF |
| 35 | PG Clamps |
| 36 | Danger Board |
| 37 | Distribution Box Clamps |
| 38 | Shackle Insulator |
| 39 | Tail Less Unit (400 Amp.) |
| 40 | Fixing of associated Items i.e.T-off Chanlle-06 ,Top Channel-06 ., Pin insulator with pin-18 No, |
| 41 | WorkofIncreasingCapacity of Distribution T/F from 100 KVA to 250 KVA at Behind Registry Office under EUDD-I Bareilly for strengtheningofElectrification System Under EUDD-I, Under Business Plan-2024-25 Bareilly. |
| 42 | Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading |
| 43 | New 250 KVA T/F |
| 44 | LT XLPE Cable (1x400 sqmm) |
| 45 | Dismantling ofold 100 KVA T/F from site and Back Carriage from site to E.S.CS store C.B Ganj including loading & unloading |
| 46 | Construction of plinth complete (2.0x2.0x1.5) meter, by providing firstclass Bricks work as per RESPO norms. (Material will be supplied by Contractor). |
| 47 | Erection of new 250 KVA T/F on Plinth by laying of cable ,Jumpering & commissioning of T/F . |
| 48 | The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor). |
| 49 | Earthing of distribution T/Ffor body & neutral upto water level with GI Pipe of 1.5\" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
| 50 | Laying ofLT XLPE Cable (1x400 sqmm) |
| 51 | Providing and Fixing of Tell-Less Unit (600 Amp.) |
| 52 | Providing and Fixing Al. lugs(for 240 sqmm.) Cable |
| 53 | for the work of Overhead Laying 11 KV XLPE Cable (3x185 SQMM) from Subash Nagar S/s to ICICI Bank on 11 KV BDA-2 Feeder strengtheningofElectrification System Under EUDD-I, Under Business Plan-2024-25 Bareilly |
| 54 | Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading |
| 55 | 11 KV XLPE Cable (3x185 sqmm) |
| 56 | PCC Pole (8.5 mtr long) |
| 57 | 11 kv XLPE Cable jointing kit O/D (3x185 sqmm) |
| 58 | Stay set complete |
| 59 | Other Line materials |
| 60 | Erection Work |
| 61 | Erection of PCC.Pole including digging of pit & grouting work complete and fitting of all accessories complete |
| 62 | EarthingofPolesby MS Earthing Rod |
| 63 | Erection of Stay Set Complete |
| 64 | Overhead Laying of 11 KV XLPE Cable (3X185) |
| 65 | Erection and Fixing 11 KV Cable jointing kit O/D (3x185 Sqmm) |
| 66 | Fixing of associated Items i.e.Stay Wire-203 Kgs. |
| 67 | Fabrication of MS Angle(102 Kgs.) for holding11 KVXLPE Cable |
| 68 | Providing and Fixing Clamps with nut Bolts . |