|
| 1 | Providing services for 16 nos.of category worker for collection & loading of coalrejects/refuges, silt, ash, sludge, solid waste, brick bats, steelscraps, assorted debris from 6ABC & 8ABCD conveyor belt areas,vats, dustbins, road side stacks to low line areas, millrejects/refuges crushed or dusts coal rejection system from chutesinto tractor trolley/dumper followed by helping in unloading atdestination point and spreading and other miscellaneous work asper direction of EIC |
| 2 | Providing services for 12 nos.of no-category worker for collection & loading of coalrejects/refuges, silt, ash, sludge, solid waste, brick bats, steelscraps, assorted debris from 6ABC & 8ABCD conveyor belt areas,vats, dustbins, road side stacks to low line areas, millrejects/refuges crushed or dusts coal rejection system from chutesinto tractor trolley/dumper followed by helping in unloading atdestination point and spreading and other miscellaneous work asper direction of EIC |
| 3 | Engagement of worker in sl no-01in emergency work e.g. Manual unloading of feeder etc. as perdirection of EICi) For 16 nos. of category workers |
| 4 | Engagement of worker in sl no-02e.g. Manual unloading of feeder etc. as per direction of EICi) For 12 nos. of no-category workers |
| 5 | Carriage for removal including loadingby mechanical means of stone/coal boulders of any sizes duringspecified hours of the day from 3ABCD ,6ABC, 8ABCD Conveyor belt, wagon tipper, track hopper areas after weighing inthe departmental weigh bridge and unloading mechanically andspreading after disposal by truck within plant area as perdirection. |
| 6 | Carriage for removal of millrejects/refuges crushed or dusts loading mechanically from the siloof Unit no-5 & 6 coal rejection system, loading manually coalrejects/refuges crushed or dusts from Unit no-3 & 4, silt, ash,sludge, solid waste, brick bats, steel scraps, assorted debris from6ABC & 8ABCD conveyor belt areas, vats, dustbins, road sidestacks to low line areas, mill rejects/refuges crushed or dusts coalrejection system from chutes upto a distance not exceeding 5.00KM and unloading at destination point and sprea- ding as perdirection. (This rate is exclusive of loading,unloading and spreading charges.)(Measurement: 7/8th of truck volume considering sinkage orshrinkage.) |
| 7 | Hiring charge of JCB forfor earthwork / shifting of Departmental material/dressing ofmaterial. |