Due Date Extended for tenders closing on 29-07-2024
Admin Corrigendum Date Extend
04-09-2024
Name of Work:TERM CONTRACT FOR ARTIFICER WORKS FOR OTM ACCN AT SECTOR \"A\" AND \"B\" UNDER GE (ARMY) BARODA
Sl. No.
Item Description
1
To perform under term contract such services and execute such works on the terms and conditions contained or referred to in the \"MES standard Schedule of Rates 2009 Part-I Specification and MES Standard Schedule of Rates 2020 Part-II Rates together with errata/amendments as applicable and upon the conditions contained in tender documents, as may be demanded, and as are enumerated in the aforesaid Standard Schedule of Rates during the period of TWELVE MONTHSfrom the date of acceptance at the rates contained in the aforesaid MES Standard Schedule of Rates OR at such other rates as may be fixed under the provision of condition 62 of \"General Conditons of Contract (IAFW-2249)\" 1989 print with errata/amendments as applicable.
2
Note:(i)Tenderer shall insert percentage rate at the 17th row and \"F\" column of this BOQ Excel sheet.(ii) Tenderer shall refer and select the option Excess (+) or less (-) available at the 17th row and \"E\" column of this BOQ Excell sheet to quote the percentage above/below MES Standard Schedule of Rates.(iii) Amount inserted by the MES under rate col and the total amount reflected in this page is a rough guidence and for reference only. Similiarly the quoted amount worked out (based on percentage rate quoted by contractor) shall also be treated as rough and for reference only. the acceptance of contractor\"s offer shall be done for quoted percentage rate on MES Standard Schedule of Rates. The work order for various works/services shall be placed for amount worked out/priced on the rates contained in MES Standard Schedule of Rates Part-II duly adjusted by Percentage rate quoted by contractor.(iv) Contractor\"s special attention is invited to condition \"4 (A) WORKS TO BE CARRIED OUT (APPLICABLE ONLY TO TERM CONTRACTORS)\" and condition \"56 TERMINATION OF CONTRACT (APPLICABLE ONLY TO TERM CONTRACTS)\" of\"General Conditions of Contract (IAFW-2249)\". The provision of these Conditons of \"General Conditions of Contract (IAFW-2249)\"are strictly to be followed.
3
(v) It is an express Condition of this Contract that the amount of total works/services required to be done. Under this contract can vary to any extant irrespective of the amount worked out/mentioned in this BOQ sheet and contractor shall be bound to execute such works/services at the rates contained in MES Standard Schedule of rates 2020 Part-II duly adjusted by quoted percentage rate during contract period No claim of the contractor shall be entertained due to increase or decrease in quantum of work required to be done/work done.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.