Tender For The Engaging Contractors For Png Industrial And Commercial Connectivity Works In Kanpur, Unnao, Bareilly And Jhansi
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Jul 2024
0 days left
EMD
40000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
→ Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
The Engaging Contractors For Png Industrial And Commercial Connectivity Works In Kanpur, Unnao, Bareilly And Jhansi
BOQ
| Sl. No. | Item Description |
| 1 | Part-1 INDUSTRIAL & COMMERCIAL WORK1-Supply & Installation of MS pipes & fittings |
| 2 | Supply & Installation ofMS pipes & fittings, Installation of meter, regulators,filter, Valves etc. including NPT threading, as specified, Drillings of holes through the walls (Brick, RCCI, Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tacklet using proper sealant/grout material and colours to match the original replacement of the damages during drilling, restoring the area to the original conditior! Painting of pipe and fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint. |
| 3 | Assessment of material requir\"ement for installation at site, Purchasing of MS Pipes & fittings from approved /recommended vendors of CUGL, Scheduling, Planning ofmaterial & Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor\"s store. Receiving, taking over, handling loading, transportation and unloading of owner supplied above ground fittings such as regulators, meters, Filter, Isolation Valves and other free issue items as defined in specification from 0wner\"s designated stock yards to Contractor\"s own stores / work sites, proper storing, stacking, identification, providing security and insurance cover.Preparation and approval of sketches, schedules & execution procedures. Finalising optimum route with consent of customer from transition fitting to meter outlet connection ( as per drawingJ and ensuring installations in well ventilated area. |
| 4 | Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2\" screws, grout material, suitable thread sealant i.e. Teflon Tape, foining oftransition fitting to above ground MS pipes, testin& Jumper, purging and commission of the complete installation. |
| 5 | Supply and installtion of 3/4\" & 1\" MS pipe |
| 6 | Installation of Equipment and Valves |
| 7 | Installation of non domestic Diagphragh meter (Inclusive of supply & installation of 1 no. Ball Valve) |
| 8 | Installation of RPD meter with EVC (lnclusive of supply & installation of 1 no. Globe Valve) |
| 9 | Installation of threaded Non-Domestic regulator |
| 10 | Installation of flanged regulator |
| 11 | Installation of Pressure gauges & Vent Pipe |
| 12 | Fencing to cover the installation |
| 13 | Supply & Installation of TATA BIue Sheet |
| 14 | Supply of all material, including erection and installation of TATA Blue Sheet [0.4 to 0.5 mm thick) tor Shed, as per specification enclosed and instruction of Engineer-in-Charge. |
| 15 | Installation of DRS/MRS for PNG supply. (DRS - Capacityupto 5000 SCMH) |
| 16 | Loading,Transpoftation of DRS/ MRS from Owner\"s designated store/ site to another site. Also includes unloading ofthe regulating systems, shiffing ofskids on the platform / foundation using cranes / hydra as required as per the site condition. |
| 17 | PART-II PE SECTION |
| 18 | Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes from Owner\"s designated stock yards to Contractor\"s own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Procurement and Installation of PE Fittings, PE Valves, Transition Fittings, Warning Mats, HDPE Pipes and other items required for execution shall also be in Contractor\"s scope. Preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc.Restoration of the abandoned excavation / trial pits (excavated to depth of 1.5 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site-in charge. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies).Trenching to the required depth in all type of surface (however putting up sufficient protection/casings without any additional cost at locations where proper depth cannot be attained), uncoiling / stringing of pipes, jointing of the pipe ends/ fittings/ valves by qualified personnel, using approved electro fusion techniques as per the specification. |
| 19 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. |
| 20 | Lowering the MDPE pipe line in trench, padding around pipeline with suitable soil, laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand/ soil as per directions of EIC/ Site-In charge.Compaction with manual technique/ jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles/ slabs/ curb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid. Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners/ EIC to the complete satisfaction of local authorities. The laying shall be carried out by any methodology as per specification in consultation with EIC. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner. |
| 21 | Procurement & installation of GI Sleeves, 2.5\" NB x 300 mm length to3\" NB x 300 mm length GI Sleeve / Half Round Concrete Sleeves for domestic connections/ commercial and industrial installationsas per Instruction of Owner/Owner\"s representative for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of CUGL/PMC. |
| 22 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. |
| 23 | Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements.Restore all surrounding ground features to that as existing before and as directed by EIC, which would include replanting of any uprooted trees etc. Pneumatic testing and commissioning as per specification and approved procedures, providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Returning of all unused material to Owner stores on completion of Gas Charging. Submission of all documents required for contract closure as mentioned in the contract. Any other activities related to operation / safety / statutory / maintenance of the works not mentioned above shall also be covered under the Scope of work and has to be completed by the Contractor within specified schedule without any extra cost to Owner. |
| 24 | Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge. |
| 25 | Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise |
| 26 | Includes laying of pipeline in all type of surface i.e. all kinds including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid. |
| 27 | Laying using any method (Open trench including chipping method, Moling and/or HDD) with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by CUGL/PMC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-graphs and as-built drawings as per the attached specification and the instruction of CUGL/PMC. |
| 28 | Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract. |
| 29 | Liasioning with Land Owning agencies - Submission of applications as per approved drawings provided by owner / owner\"s representative (Initial Route Survey,Preperation of Drawings, measuring and providing details of surface type shall be in scope of Contractor with approval from Owner / Owner\"s representative), obtaining & submission of demand note, Coordination, Liaisoning, Obtaining written permissions& NOC after completion of work (if applicable) fromLandowingagencies likeNagar Nigam,PWD,Development Authority,AAI,Forest Dept, NHAI,IndianRailways andany other government agencies who maintains the public lands. These rates are not applicable for Private lands i.e. Apartments/institutions etc. Note: Service lines laid against SOR item no. 1.5are not applicable; |
| 30 | The Laying of Service Line of Dia 20 mm, would include installation of TF inside the pedestal and supply of material and making of pedestal for TF shall be inclusive. |
| 31 | 20 mm Dia |
| 32 | 32 mm Dia |
| 33 | 63 mm Dia (Excluding HDD with casing) |
| 34 | All service lines left out initially during mainline laying, shallbe laid under above mentionedSOR . MDPE Pipe line layingby HDD Method, withoutCasing |
| 35 | Survey of the under groundutilities, submissionof profile for approval,execution of the work as per the standardprocedure attached,includingexcavationofthepits, Jointingandinsertionofthe carrierpipe,subsequent backfilling,compaction, submissionof as built graphs and final HDD profiles as per attached specificationand the instructionof EIC / Site Engineer of Owner. The other activities are as per SOR Item No. 1and as detailedin specificationand as per the instructions of the EIC / Site engineer of Owner |
| 36 | 125 mm Dia HDD without casing |
| 37 | Fabrication & Installation of Pipeline Markers: |
| 38 | Supply and Installation of RCC Route Markers, Powder Coated Plate / Pole Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, supply and application of approved colour and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge. The rates shall include liaison rates with statutory bodies and restoration rates and no separate rates are payable under this SOR. |
| 39 | RCC Route Markers as per Drawing |
| 40 | Pole markers with foundation as per Drawing and instructions of EIC and specification. |
| 41 | Plate Marker as per Drawing |
| 42 | Foundation works: (Excavation, Providing and Laying Plain Cement Concrete (1:2:4)) |
| 43 | Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and properly compacted complete in all respect as per scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. |
| 44 | RESTORATION OF EXCAVATED WORKS |
| 45 | Restoration to original condition surface like asphalted/Bituminous Road, Concrete Pavement, Agra/ Kota Stones/ Tiles(Chequered/ Interlocking. Etc.). |
| 46 | For NOC/Permission from land owning agencies/private builders etc., based on \"Dig and Restore\" basis, payment for restoration will be released only after satisfactory completion and certification by Third party/Consultant. |
| 47 | Contractor must also have to arrange his own equipment for restoration work like water tanker and jumping jack compactor for compaction of backfilled trenches and roller and other required equipment/ machinery for asphalting/ road works. |
| 48 | Restoration to original conditions of dismantled surface like Asphalted/Bituminous Road, Concrete Pavement, Agra /Kota Stones / Tiles (Chequered/interlocking etc.), Dry Brick Pavement as per the technical specifications attached in the tender after laying of pipeline in Built- Up surface, as per the directions of EIC / Site lncharge. Scope includes supply of the approved quality material, testing of materials by third party agencies as per technical specification / CPWD /IRC Standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities /landowners / third party inspection agencies designated by land owing agencies and Owner. Bidder has to provideNo objection certificate from land owning agency. The payment against this item shall be made after receipt of No objection certificate. |
| 49 | Permanent brick surface |
| 50 | Cement Concrete |
| 51 | Interlocking tiles |
| 52 | Total Amount inclusive of BOCW @1%and Bidder to Mandatory fill GSTin Percentage(%) |
AI Tender Summary
Tender Timeline
Jul 10, 2024
11:30 IST
Tender Published
Tender notice published.
CompletedJul 24, 2024
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 25, 2024
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender