| 1 | Excavation in foundation in ordinary soil. Upto 1.50 M lift and 30 M lead. |
| 2 | Providing and laying P.C.C. (1:4:8) with cement, 40 mm stone ballast and coarse sand including supply of all material, labour and T&P etc. required for proper comletion of the work. In foundation and floors. |
| 3 | Providing and laying C.C. (1:3:6) with cement, 10-20 mm stone aggrigate and coarse sand including supply of all material, labour and T&P etc. required for proper comletion of the work. In foundation and floors. |
| 4 | Brick work with common brunt clay F.P.s. (non mudular) bricks of designation,150 in foundation and plinth in cement mortar (1:4) |
| 5 | Providing and laying C.C. (1:2:4)cement, 10-20mm stone gritt and coarse sand including supply of all material, labour and T&P etc. required for proper comletion of the work. In foundation and floors |
| 6 | 12 mm thick cement Plaster on brick work with cement mortar of mix (upto 10 meter height from GL in(1:4) |
| 7 | 15 mm Thick Cement Plaster in 1:3 with Cement Coarse Sand Motar Up to 10m Height |
| 8 | Neat Cement Punning on Roof As PER DSR SP NO.13.18 |
| 9 | R.C.C. work(1:2:4)with cement,coarse send ,10-20mm stone gritt |
| 10 | Supply of 10-12 mm twisted m.s. bar for item no.7 |
| 11 | Laying of 150 mm And 4 kgf/cm2 P.V.C. pipe |
| 12 | Laying and fitting of 110 mm dia 4kgf/cm2 P.V.C. pipe |
| 13 | P.V.C. Reducer tee of 150*110 mm dia |
| 14 | 110mm dia P.V.C. bend |
| 15 | 110mm dia Iron Clip |
| 16 | Fastner |
| 17 | Solvent cement |
| 18 | supply and filling of 40 mm size stone ballast |
| 19 | supply and filling of 10-20 mm stone gritt |
| 20 | supply and filling of coarse sand |
| 21 | 110 mm dia P.V.C. pipe complet boring workof 30 m depth in Recharge pit |
| 22 | Nylone mess |
| 23 | Disposel of surplus earth excavated earth |
| 24 | Fitting of PVC pipe and all plumbing work |
| 25 | Wall wrinting and wall painting |
| 26 | 150mm PVC Bend |
| 27 | Complete gate valve for first rain water flush drain out |