| 1 | Earth work in excavation of foundation in all kinds of soil with initial lead & lift including rough dressing and leveling the bed and sides and laying in layers not exceeding 0.3mt depth as per direction of E.I.C including 5 km. mechanical lead. |
| 2 | Supplying, filling sand in foundation with well watered and rammed including cost, conveyance and royalty of sand and cost of labour, T&P etc., complete |
| 3 | CC(1:3:6) using 4cm size H.B.G. metal (other than granite) including cost of all materials, labour, T&P, watering, curing etc. complete. |
| 4 | Cement concrete (1:11/2:3) with 12mm. Size hard broken granite chips (Crusher broken) for R.C.C. works including hoisting, laying, all cost, conveyance, royality etc. complete. |
| 5 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 6 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentalingthen after casting including cost of materials complete. R.C.C. foundation and Plinth bend and footing bases of columns, mass concrete, pre-cast slabs etc. |
| 7 | R.C.C. floor and roof slabs, landings,balconies, projecting, sun shades and chajjas upto 4.3 mtr. height. |
| 8 | Solid Cement concrete block masonary work in C.M.(1:6) in F&P etc. Completed. |
| 9 | Flyash Brick masonary in cement mortar (1:6) by using 9\" size fly ash.Bricks including all cost, conveyance etc. complete.(SS) |
| 10 | 12mm thick cement plaster (1:4) for brick orwork stone masonry.Per 1 Sqm. |
| 11 | White washing 2 coat with shell lime. |
| 12 | Wall painting 2 coats with plastic emulsion paint of approved shade on new workto give an even shade including cost of paint. |
| 13 | Supplying, fitting and fixing of Vetrified tile of premium grade having thickness 8mm to 10mm conforming to IS 13756 of size 60cm x 60cm plain (Ivory) in floors with application of polymer modified cement based water resistance adhesive bed of required thickness of 10 mm and filling joints with epoxy grout of approved quality including cost of all materials, labour, T&P, etc. complete required for the work as per direction of the Engineer-in-charge. |
| 14 | Addsign board and photo |