E-tender for Erection, dismantling of poles ,HT/LT lines and other allied extension works in of Construction/Gobi subdivison ; 1 Excavationofpolepitup to27 (8.0 m) Pole by using JCB or manual 2 Excavationofpolepit above8mtr pole PSC/RCC/RSJ pole by using JCB or manual 3 Excavation of Staypit4.5 to 5depthby using JCB or manual 4 Excavation of pole / stay pit hard rocks requires blasting 5 Excavation of pole / stay pit hard rocks without blasting (where houses are located ) 6 Erection of PSC/RCCpoles/Metalpolesupto 8.00m. (27) by using JCB or manual 7 Dismantling of PSC/RCCpoles/Metalpolesupto 8.00m. (27) by using JCB or manual 8 Erection of PSC/RCC /Metalpoles above 8.0m.(27) by using JCB or manual 9 Erection of RSJ/Rail/fabricated/tubular poles above 30-0 (9.0m) by using JCB or manual 10 Dismantling of RSJ/Rail/fabricated/tubular poles above 30-0 (9.0m) by using JCB or manual 11 Erectionofstaysetcomplete 12 Dismantling of stay set 13 Fixing of HTV crossarms(all types) / channelcrossarms/guardingCrossarms 14 Dismantling of V X arm(all types),channel X arm,guarding X arm 15 Fixing of LT 3 phasecrossarms 16 Dismantling of LT 3 phase X arm 17 Fixing of LT Single phase cross arms 18 Dismantling of LT single phase X arm 19 Fixing of HT/LTTIFittings 20 Dismantling of HT/LT TI fitting 21 FixingofHTpinInsulators 11 KV 22 Dismantling of 11 KV/22KV pin insulator 23 FixingofHT11 KVstraindisc. 24 Dismantling of 11KV strain disc 25 FixingofLTpinInsulator 26 Dismantling of LT pin insulator 27 FixingofLTshackle 28 Dismantling of LT shackle 29 FixingofAluminium Knob 30 Dismantling of Aluminium knob 31 Earthing of pole with coil earthing including burying looping and binding 32 Paving and stringing of ACSR 7/4.09 mmRaccoon conductor 33 Paving and stringing of ACSR 7/3.35mm /AAAC 3.15mm Rabbitconductor 34 Paving and stringing of ACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor 35 Sleeveconcreting including materials (Cement + river sand/M-sand and Blue metals and watering) 36 Guarding arrangement with Flat guarding includng fixing of 2 Nos cross arms 37 Guarding arrangements for HT Guarding 38 Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8Km plains.(No return charge) 39 Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) above 8Kms for additional Km (Irrespective of weight in tonnage). (No return charge) 40 Loadingofpolesupto8.0 mtr / 27 41 Loadingofmetal poles ( all sizes) 42 Unloadingofpolesupto8.0 mtr / 27 43 Unloadingofmetal poles ( all sizes) 44 Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manualup to 100 m 45 Transportingofpolesfromroadsite topolepitincludingloadingandunloading ofpoles by using JCB or manual beyond 100 m 46 LoadingorunloadingofTransformer upto100 KVA 47 LoadingorunloadingofTransformer above 100 KVA upto 200 KVA 48 LoadingorunloadingofTransformer above200 KVA 49 Erection of new transformer for all capacities (with jumpering) 50 Erection of Street light including fixure fitting 51 Erection of street light service 52 Releasing of grills from RCC poles 53 Releasingofsingle phaseserviceand re-fixing. 54 Releasingof3 phaseserviceand(upto 50 HP)re-fixing. 55 Labourchargesforalterationof Back clamps/Stay Clamp tosuitfortheworks 56 Resagging of HT/LT Line with ACSR 7/3.35 mm/AAAC 7/3.15mm Rabbit conductor 57 Resagging of HT/LT Line with ACSR 7/2.59 mm/AAAC 7/2.50mm Weasel and ACSR 7/2.11 mm conductor 58 Providing LT bus bar arrangement in distn.Trs structure location 59 Provision of Distribution Transformer Name Board, ( Name of the 22/11 KV feeder , Name of the SS , Capacity of the DT). 60 ReleasingofACSR/AAACconductors fromconductordrumandcoiling ACSR 7/3.35, 7/2.59, AAAC7/2.50, 7/3.15 mm 61 Cutting of coconut leaves /per tree 62 Drilling of hole in channel only 3/4 & 1 63 T.I.Fitting welding with clamps 64 Clearing of branches of treeper tree 65 Feeder arrangementswith Open Type fuse Units 66 Painting of Transformer (Double coat) 67 Releasing of HTS Wire from PSC Pole 68 Replacing of HQ&EM Meter to static meter 69 Replacement of earthing of pole with coil earthing including burying looping and binding 70 Erection of new earth pipe by replacing the corroded earth pipe 71 Erection of new 10 earth pipe by replacing the corroded earth pipe and renewal of earthing including buryiung looping and binding 72 Fixing of meter on LV side of DT 73 Fencing of Distribution Transformer structure at road side Fabrication and erection 74 Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 Nos. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle including concreting. (Except erection of Transfomer) 75 Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 Nos. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle excluding concreting. (Except erection of Transfomer) 76 Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting. 77 Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreting. 78 Erection of Single pole Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 Nos. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,transformer bed structure including concreting. (Except erection of Transfomer) 79 Erection of Single pole Transformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 Nos. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,transformer bed structure excluding concreting. (Except erection of Transfomer) 80 Set right the leaning of poles 81 Engaging of JCB/Crane for first 2 Hrs 82 Engaging of JCB/Crane for Every additional Hrs 83 Replacement of failed transformers all capacities 84 Clearing of shrub in yard DT/SS 85 Mass Concreting including materials(Cement+River sand /M sand and Blue metals and watering) 86 Stay concreting including cost of materials and labour 375mmX375mmX50mm. 87 Dismantling ofTransformer, strucure complete in all respects with wiring, earthing,fixing of open typefuse units, HT/LT LAS and jumpeing 3 Nos. Earth pits with coller including painting of metal parts, structurepoles, fixing of tapping channel,channel, belting angle excluding concreting. 88 Dismantling of of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreting. 89 Resagging ACSR 7/4.09 mm Raccoon conductor 90 Cutting of flat 91 Cutting of Channel 92 Cutting of Angle 93 Cutting of Pipe 94 Dismantling of ACSR 7/3.35mm or AAAC 7/3.15 conductor 95 Dismantling of ACSR 7/2.59 mm or AAAC2.50 mm7/2.11 ACSRconductor