| 1 | Jungle ClearanceClearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.By Manual Means, In area of thorny jungle |
| 2 | Hill Area :- Road Formation Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 |
| 3 | CC Side DrainConstruction of CRM side drain 15cm thick both side wall height 0.32cm in 1:4 CM with hardstone, cc base in M10(cc 1:3:6) 15cm thick i/c inside plastering in cement morter 1:4 i/c earthwork complete as per drawing and direction of engineer incharge. |
| 4 | (b) Unlined Trapezoidal Side Drain Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.)i) Mechanical Means |
| 5 | Subgarde PreparationLoosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per TechnicalSpecificationClause 303.5.2. |
| 6 | Earthen ShoulderConstruction of Subgrade and Earthen ShouldersConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 7 | Granular Sub-BaseConstruction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete |
| 8 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(B) By Mechanical Means |
| 9 | Prime Coat Providing and applying of prime coat with bitumen emulsion (SS-1) on prepared surface of granular base i/c clearing of base surface and spraying emulsion at the rate of 1.2 - 1.5 kg per sqm. using mechanical means as per technical specification clause 502 (high porosity) |
| 10 | Tack CoatProviding and applying tack coat with Bitumen emulsion (CRS-1)using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 11 | Mix Seal SurfacingProviding, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 |
| 12 | Cross DrainageEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sideI. Ordinary Soil Upto 3 m depth. |
| 13 | II. Ordinary rock (Not requiring blasting) upto 3m. |
| 14 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I). P.C.C grade M 10Nominal mix 1:3:6 |
| 15 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.II) Coursed Rubble Masonry (2nd sort)In 1:4 Cement mortar. |
| 16 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204II) Coursed Rubble masonry (2nd Sort) (iii) In cement mortar (1:4) |
| 17 | Providingand laying reinforced cement concrete in superstructure as per drawing and technical specifications clause 800,1205.4 and 1205.5RCCM25(slab) |
| 18 | Supplying fitting,and placing HYSD bar reinforcement in superstructure as per drawing and technical specification Clauses 1002,1010 and 1202 |
| 19 | Providing and laying reinforced cement concrete in superstructure as per Drg. and technical specification clauses 800,1205.4,1205.5R.C.C grade M 20 |
| 20 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 |
| 21 | Protection Works Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.Ordinary soil Upto 3 m depth |
| 22 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 10 Nominal mix 1:3:6 Wall Base |
| 23 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204In cement mortar (1:3)Random rubble masonry |
| 24 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 |
| 25 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(I) Granular material |
| 26 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 27 | RoadsFurnitures Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703i) 5th Kilometre Stone (Precast) |
| 28 | ii) Ordinary Kilometer Stone (Precast) |
| 29 | BoundaryPillars Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 |
| 30 | Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thickwith areaexceeding 0.9 sqm supported on mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos.firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 |
| 31 | Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
| 32 | Providing and Fixing Title information Board of VVP Project(RCC) |
| 33 | Providing and Fixing Citizen information Board of VVP Project(RCC)\"A\" |
| 34 | Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001. i) Men at Work |
| 35 | ii) Diversion |
| 36 | iii) Road closed |
| 37 | iv) Stop |
| 38 | v) Road ahead closed |
| 39 | vi) Slow |
| 40 | Routine Maintenance |
| 41 | First Year |
| 42 | Second Year |
| 43 | Third Year |
| 44 | Fourth Year |
| 45 | Fifth Year |