| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils (B/1.8) |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).(B/3.1.6) |
| 3 | Providing and laying in position specified grade ofcement concrete forall RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix (B/4.1) |
| 4 | Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcementfor Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix (B/4.2) |
| 5 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beam, raft , bases of columns etc.(B/4.9) |
| 6 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for :Walls (any thickness) including attached pilasters,buttressesplinthandstring course. (B/4.10.1) |
| 7 | Labour charges for cutting, bending for fabrication and binding reinforcement (plain or tor/ribbed/TMT steel) as per drawing and design for R.C.C. and R.B. work including cost of binding wire with all lead and lift up to floor five level complete.(B/4.14) |
| 8 | \"Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (\"Original producers\" who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)\"Thermo-mechanically Treated bars (Conforming of relevent IS code) (B/4.13.3) |
| 9 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). (B/6.1.6) |
| 10 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick. (B/12.3.2) |
| 11 | Providing&fixingprecastcementconcretecoping1:2:4mix50mmthickcompleteas per specification : (B/3.8) |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead upto 50m andlift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil. Deductfor not rolling with power roller of 8 to 10 tonne capacity for banking excavated earth in layers not exceeding 20 cm in depth.Deduct fornotwateringtheexcavatedearthforbanking. (B/1.6-1.4-1.5+G 4.1(9)- 4.1(4)) |
| 13 | P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2.) approved quality /makeincluding joining the pipe with solvent cement rubber ring and lubricant.110 mm dia (S/3.16.3) |