Educational and Research Institute Boards / Undertakings / PSU Closing in 0 days TDR #44015102

Tender For Construction Of Drains In Imphal City Portion-A,B, C And D

Issued by Boards / Undertakings / PSU · imphal, Manipur
Tender Value
2.29 Crore
Estimated cost
Bid Submission
22 Jul 2024
0 days left
EMD
4.59 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
imphal → Manipur
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Drains In Imphal City Portion-A,B, C And D

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 10-Jul-2024 NIT No. MOBEDS-08/2024 Turnover Modifications Technical Bid 22-Jul-2024

BOQ

Name of Work: Construction of Drains in Imphal City Portion-A,B, C and D
Sl. No. Item Description
1Ward No.7 of Sagolband A/C
2Sub- Heads/Items of Work
3Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposed ofexcavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in-charge.All kind of soil.
4Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
5Providing and laying cement concrete of specified gradeexcluding the cost of centering and footing shuttering- All work upto plinth level: in 1:4:8 (1cement : 4c/sand: 8 graded stone agro. 40 mm nominal size.)
6R.C.C. work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,column,pillars,piers,abutments,post and struts etc up to floor five level excluding cost of centering,shuttering,finishing and reinforcementin 1:1.5:3( 1 cement :1.5 course sand: 3graded stone aggrt. 20mm nominal size)
7Steel reinforcement for RCC work including straighting,cutting,bending,placing in position and binding all complete-Thermo-Mechanically Treated bars.
8Providing form works i/c centering and shuttering so as to give a rough finish, shuttering &propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
9a) Foundation footings, bases of column etc. and mass concrete
10Ward No.8 of Sagolband A/C
11Sub- Heads/Items of Work
12Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposed ofexcavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in-charge.All kind of soil.
13Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
14Providing and laying cement concrete of specified gradeexcluding the cost of centering and footing shuttering- All work upto plinth level: in 1:4:8 (1cement : 4c/sand: 8 graded stone agro. 40 mm nominal size.)
15R.C.C. work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,column,pillars,piers,abutments,post and struts etc up to floor five level excluding cost of centering,shuttering,finishing and reinforcementin 1:1.5:3( 1 cement :1.5 course sand: 3graded stone aggrt. 20mm nominal size)
16Steel reinforcement for RCC work including straighting,cutting,bending,placing in position and binding all complete-Thermo-Mechanically Treated bars.
17Providing form works i/c centering and shuttering so as to give a rough finish, shuttering &propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
18a) Foundation footings, bases of column etc. and mass concrete
19Ward No.10 of Sagolband A/C
20Sub- Heads/Items of Work
21Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposed ofexcavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in-charge.All kind of soil.
22Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
23Providing and laying cement concrete of specified gradeexcluding the cost of centering and footing shuttering- All work upto plinth level: in 1:4:8 (1cement : 4c/sand: 8 graded stone agro. 40 mm nominal size.)
24R.C.C. work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,column,pillars,piers,abutments,post and struts etc up to floor five level excluding cost of centering,shuttering,finishing and reinforcementin 1:1.5:3( 1 cement :1.5 course sand: 3graded stone aggrt. 20mm nominal size)
25Steel reinforcement for RCC work including straighting,cutting,bending,placing in position and binding all complete-Thermo-Mechanically Treated bars.
26Providing form works i/c centering and shuttering so as to give a rough finish, shuttering &propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
27a) Foundation footings, bases of column etc. and mass concrete
28Ward No.24 of Sagolband A/C
29Sub- Heads/Items of Work
30Earthwork in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposed ofexcavated earth, lead upto 50m and lift upto 1.5m, as directed by the Engineer-in-charge.All kind of soil.
31Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
32Providing and laying cement concrete of specified gradeexcluding the cost of centering and footing shuttering- All work upto plinth level: in 1:4:8 (1cement : 4c/sand: 8 graded stone agro. 40 mm nominal size.)
33R.C.C. work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,column,pillars,piers,abutments,post and struts etc up to floor five level excluding cost of centering,shuttering,finishing and reinforcementin 1:1.5:3( 1 cement :1.5 course sand: 3graded stone aggrt. 20mm nominal size)
34Steel reinforcement for RCC work including straighting,cutting,bending,placing in position and binding all complete-Thermo-Mechanically Treated bars.
35Providing form works i/c centering and shuttering so as to give a rough finish, shuttering &propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
36a) Foundation footings, bases of column etc. and mass concrete

AI Tender Summary

OUR REF NO 44015102
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2.29 Crore
LAST DATE 22-07-2024
Authority
Authority Name Department of Economics
Work Description Construction Of Drains In Imphal City Portion-A,B, C And D
Basic Detail
Tender No MOBEDS-08/2024
Bidding Type Tender
Location
City imphal
State Manipur
Key Dates
Publish Date 10 Jul 2024
Submission Date 22 Jul 2024
Open Date 22 Jul 2024
Finance
Tender Value 2.29 Crore
Tender Fee 10000
EMD 4.59 Lakhs
Exemption Not Available
Document List
01ad363d-a73e-4b13-9f53-75ba074c519f.html
BOQ_2693.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 10, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 22, 2024
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 22, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 22, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

01ad363d-a73e-4b13-9f53-75ba074c519f.html

xls

BOQ_2693.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders