Tender For Electrical Work Deposit Under Eudd-I Bareilly, Different Electrification Works Under Full Deposit Scheme 2024-25 Under Eudd-I Bareilly Sl. No. Item Description 1 For The Work Of Giving Ofnew 121 K.W/134 Kva Multipointconnectionto For Elec
Tender Overview
Project Description
Tender For Electrical Work Deposit Under Eudd-I Bareilly, Different Electrification works under full deposit Scheme 2024-25 under EUDD-I Bareilly Sl. No. Item Description 1 For the work of giving ofNew 121 K.W/134 KVA multipointConnectionto for Electrification of new Colony“THE YARD” at Site Station road opposite Aabkaari Vibhag,Bareillyunder Full deposited fund-2024-25 under EUDD-I, Bareilly. 2 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 3 New 250 KVA T/F 4 LT XLPE Cable (3.5x240 sqmm) 5 LT XLPE Cable (1.0x240 sqmm) 6 11 KV XLPE Cable (3x70 sqmm) 7 11 KV Cable Jointing Kits (3X70 sqmm)O/D 8 Other Line materails 9 Erection Work 10 ErectionofRS.Joist 04 Pole Structure ( 100 MMX116 MMX11 MM) ( All Associated along with 04 No. RS. Joist PoleShall be Contractor). 11 Under Ground Laying of LT XLPE Cable (3.5x240 sqmm) by HDD Method . 12 Overhead Laying of11 KV XLPE Cable (3x70 sqmm) 13 Laying of LT XLPE Cable (1.0x240 sqmm). 14 Mounting of250 KVA T/Fon Newly errected04 Pole Structure . 15 Earthing of250 KVA T/Fwater level body & neutral, with GI Pipe of 1.5 Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). 16 Chemical Erathing for LT Pannel & Meter Pannel. 17 The work of fabrication /construction and grouting ofnew wire mesh fencingof 12 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 40x40x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor). 18 Supply & Fixing ofFollowing Items 19 Supply & Fixing of LT Pannel with 450 Amp. MCCB as per incomer & 200 Amp. MCCB 02No. Outgoing of rmetering Pannelfor 250 KVA T/F 20 Supply & Fixing of meter panel with 12 nos. meter space & outgoing MCCB 63 Amp. 04 Pole & Busbar Complete . 21 AL. Lugs (240 sqmm) 22 For the work of shiting of 11 KV Pole on request of Shri Rahunandan Singh Yadav, at Site South CityBudaun Road, Bareillyunder Full deposited fund-2024-25 under EUDD-I, Bareilly. 23 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 24 ST Pole 11 Mtr. long 25 Other Line materails 26 Erection Work 27 Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. 28 Erathing ofPole 29 Fixing of associated Items i.e.T-offChannel-02 No., 11 KV Pin Insulator with Pin-03 No. 30 Supply & Fixing ofFollowing Items 31 F-Calmpswith nut & bolts . 32 Holding Clapms for T-OFF 33 Back Carriege of Scap materails from Site to C.B Ganj, Central Store Bareilly including loading & Unloading. 34 For the work of shiting of 11 KV Pole on request of Shri Ajay Chouhan at site Ganesh Nagar , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. 35 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 36 ST Pole 11 Mtr. long 37 ACSR Weasal Condcutor 38 Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. 39 Laying of ACSR Weasal Conductor 40 For the work of shiting of LTPole on request of Mohd. Yasir atsite Roadways Bus stand ke peeche ,College road , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.y. 41 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 42 ST Pole (9.00Meter Long) 43 Erection Work 44 Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. 45 For the work of giving 02 KW (LMV-I) Connection to Smt. Preeti Singh, By extension of LT Line at Pragati Nagar Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. 46 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 47 PCC Pole (8.5 Meter Long) 48 AB Cable (3X50 sqmm) 49 Erection Work 50 Erection ofnew PCCPole including digging of pit & grouting work complete and fitting of all accessories complete. 51 Laying of AB Cable 3x50 sqmm 52 Supply & Fixing ofFollowing Items 53 Stone Pad 54 LT Clamp with I hook 55 For the work of giving 02 KW (LMV-I) Connection to Rakesh S/O Sri lt Budhsen, By extension of LT Line at Site city enclave badaun Road Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. 56 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading 57 PCC Pole 8.5 Mtr Long 58 AB Cable 3x50 sqmm 59 Distribution Box 3 phase 60 Stay set complete 61 Erection Work 62 Erection ofnew PCCPole including digging of pit & grouting work complete and fitting of all accessories complete 63 Laying of AB Cable 3x50 sqmm 64 Earthing of Pole 65 Erection and fixing of stay set complete 66 Erection and fixing of LT Distribution Box 67 Supply & Fixing ofFollowing Items 68 LT Shackle Insulator with clamp and nut bolts 69 Piercing Connector
BOQ
| Sl. No. | Item Description |
| 1 | For the work of giving ofNew 121 K.W/134 KVA multipointConnectionto for Electrification of new Colony“THE YARD” at Site Station road opposite Aabkaari Vibhag,Bareillyunder Full deposited fund-2024-25 under EUDD-I, Bareilly. |
| 2 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 3 | New 250 KVA T/F |
| 4 | LT XLPE Cable (3.5x240 sqmm) |
| 5 | LT XLPE Cable (1.0x240 sqmm) |
| 6 | 11 KV XLPE Cable (3x70 sqmm) |
| 7 | 11 KV Cable Jointing Kits (3X70 sqmm)O/D |
| 8 | Other Line materails |
| 9 | Erection Work |
| 10 | ErectionofRS.Joist 04 Pole Structure ( 100 MMX116 MMX11 MM) ( All Associated along with 04 No. RS. Joist PoleShall be Contractor). |
| 11 | Under Ground Laying of LT XLPE Cable (3.5x240 sqmm) by HDD Method . |
| 12 | Overhead Laying of11 KV XLPE Cable (3x70 sqmm) |
| 13 | Laying of LT XLPE Cable (1.0x240 sqmm). |
| 14 | Mounting of250 KVA T/Fon Newly errected04 Pole Structure . |
| 15 | Earthing of250 KVA T/Fwater level body & neutral, with GI Pipe of 1.5\" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
| 16 | Chemical Erathing for LT Pannel & Meter Pannel. |
| 17 | The work of fabrication /construction and grouting ofnew wire mesh fencingof 12 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 40x40x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor). |
| 18 | Supply & Fixing ofFollowing Items |
| 19 | Supply & Fixing of LT Pannel with 450 Amp. MCCB as per incomer & 200 Amp. MCCB 02No. Outgoing of rmetering Pannelfor 250 KVA T/F |
| 20 | Supply & Fixing of meter panel with 12 nos. meter space & outgoing MCCB 63 Amp. 04 Pole & Busbar Complete . |
| 21 | AL. Lugs (240 sqmm) |
| 22 | For the work of shiting of 11 KV Pole on request of Shri Rahunandan Singh Yadav, at Site South CityBudaun Road, Bareillyunder Full deposited fund-2024-25 under EUDD-I, Bareilly. |
| 23 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 24 | ST Pole 11 Mtr. long |
| 25 | Other Line materails |
| 26 | Erection Work |
| 27 | Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 28 | Erathing ofPole |
| 29 | Fixing of associated Items i.e.T-offChannel-02 No., 11 KV Pin Insulator with Pin-03 No. |
| 30 | Supply & Fixing ofFollowing Items |
| 31 | F-Calmpswith nut & bolts . |
| 32 | Holding Clapms for T-OFF |
| 33 | Back Carriege of Scap materails from Site to C.B Ganj, Central Store Bareilly including loading & Unloading. |
| 34 | For the work of shiting of 11 KV Pole on request of Shri Ajay Chouhan at site Ganesh Nagar , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. |
| 35 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 36 | ST Pole 11 Mtr. long |
| 37 | ACSR Weasal Condcutor |
| 38 | Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 39 | Laying of ACSR Weasal Conductor |
| 40 | For the work of shiting of LTPole on request of Mohd. Yasir atsite Roadways Bus stand ke peeche ,College road , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.y. |
| 41 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 42 | ST Pole (9.00Meter Long) |
| 43 | Erection Work |
| 44 | Dismentling of Existing ST Polewith all accessories and erection ofnew STPole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 45 | For the work of giving 02 KW (LMV-I) Connection to Smt. Preeti Singh, By extension of LT Line at Pragati Nagar Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. |
| 46 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 47 | PCC Pole (8.5 Meter Long) |
| 48 | AB Cable (3X50 sqmm) |
| 49 | Erection Work |
| 50 | Erection ofnew PCCPole including digging of pit & grouting work complete and fitting of all accessories complete. |
| 51 | Laying of AB Cable 3x50 sqmm |
| 52 | Supply & Fixing ofFollowing Items |
| 53 | Stone Pad |
| 54 | LT Clamp with I hook |
| 55 | For the work of giving 02 KW (LMV-I) Connection to Rakesh S/O Sri lt Budhsen, By extension of LT Line at Site city enclave badaun Road Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly. |
| 56 | Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading |
| 57 | PCC Pole 8.5 Mtr Long |
| 58 | AB Cable 3x50 sqmm |
| 59 | Distribution Box 3 phase |
| 60 | Stay set complete |
| 61 | Erection Work |
| 62 | Erection ofnew PCCPole including digging of pit & grouting work complete and fitting of all accessories complete |
| 63 | Laying of AB Cable 3x50 sqmm |
| 64 | Earthing of Pole |
| 65 | Erection and fixing of stay set complete |
| 66 | Erection and fixing of LT Distribution Box |
| 67 | Supply & Fixing ofFollowing Items |
| 68 | LT Shackle Insulator with clamp and nut bolts |
| 69 | Piercing Connector |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender