Tender For Providing And Laying Of Hmp Ready Mix Bc 30 Mm Thick Compacted By Paver Finisher Including Cleaning Of Road Surface, Application Of Tack Coat, And Correction Work With Bm 75 Mm Thick Compacted Including Road Marking For Re-Surfacing Works Betwe
Tender Overview
Project Description
PROVIDING AND LAYING OF HMP READY MIX BC 30 MM THICK COMPACTED BY PAVER FINISHER INCLUDING CLEANING OF ROAD SURFACE, APPLICATION OF TACK COAT, AND CORRECTION WORK WITH BM 75 MM THICK COMPACTED INCLUDING ROAD MARKING FOR RE-SURFACING WORKS BETWEEN KM 26.00 TO KM 27.500 AND KM 67.60 TO KM 72.00 (NET LENGTH 5.900 KM) ON CHAMPHAI-HNAHLAN-KHUANGPHAH ROAD UNDER 74 RCC/ 24 BRTF/ PROJECT PUSHPAK IN MIZORAM STATE(4thCall)
BOQ
| Sl. No. | Item Description |
| 1 | RESURFACING WORK ON CHAMPHAI-HNAHLAN-KHUANGPHAH ROAD KM 26.00 TO KM 27.500 AND KM 67.60 TO KM 72.00 (NET LENGTH 5.900 KM) |
| 2 | Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&HSpecifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision)on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge.Note:1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work. 2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm. |
| 3 | Edge road marking with thermo plastic paint 2.5 mm thick confirming to clause 803.4 of MoRT&H Specifications (fifth revision) including all labourers, materials and machinery as specified and directed by Engg-In-Charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender