}

Supply Of Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipmentsupply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment,Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Br, erode-Tamil Nadu

Southern Railway has published Supply Of Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipmentsupply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment,Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Br. Submission Date for this Tender is 19-07-2024. Test Rig Tenders in erode Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

43894610
Supply Of Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipmentsupply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment,Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Br
Tender
Indian
Tamil Nadu
Erode
19-07-2024

Tender Details

Supply Of Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipmentsupply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment,Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment Of Ftrtipl M Ake For Testing Of Valves As Per Els/Ed Technical Specification No. Rs/Ed/M&P/280 Along With Testing Procedur Es Enclosed. E-70 Test Rigs And Equipment Consisting Of 1.Rbtr 0106 For Testing Individual Valves/Items Outside E70 Panel Manifold Assembly. 2. Rbtr 0102 For Testing All Sub Assembly Manifold Of The Brake Frame. 3. Rbtr 0103 For Testing All Individual Valves Mounted The E70 Panel Manifold Assembly. 4. Equipment Required For Operati On Of Test Rigs As Per Ftrtipl Part No. 790795200 Make : M/S. Ftrtipl Or Equivalent. [ Warranty Period: 72 Months After The Date Of Delivery ] , Supply, Installation, Testing And Commissioning Of Test Rig For E-70 Brake Equipment Of Ftrtipl M Ake For Testing Of Valves As Per Els/Ed Technical Specification No. Rs/Ed/M&P/280 Along With Testing Procedur Es Enclosed. E-70 Test Rigs And Equipment Consisting Of 1.Rbtr 0106 For Testing Individual Valves/Items Outside E70 Panel Manifold Assembly. 2. Rbtr 0102 For Testing All Sub Assembly Manifold Of The Brake Frame. 3. Rbtr 0103 For Testing All Individual Valves Mounted The E70 Panel Manifold Assembly. 4. Equipment Required For Operati On Of Test Rigs As Per Ftrtipl Part No. 790795200 Make : M/S. Ftrtipl Or Equivalent. [ Warranty Period: 72 Months After The Date Of Delivery ] , Amc For Test Rig For E-70 Brake Equipment Of Ftrtipl Post Warranty Comprehensive Annual Main Tenance Contract For 9 Years After 6 Years Of Warranty Period. Note:- 1. Firms To Quote Separately For Each Year. 2. Firm Should Quote Actual Rate Of Camc In The Bid. Discounted Rate As Per Npv Will Be Generated By The Ireps System For Ranking Purpose. Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % At (Location) Sse/Acl/Lw/Per, Sr Tamil Nadu 1.00 Set 4 6518N Amc (Y) Non Stock --- Yes Consignee Inr Amc For Test Rig For E-70 Brake Equipment Of Ftrtipl Post Warranty Comprehensive Annual Main Tenance Contract For 9 Years After 6 Years Of Warranty Period. Note:- 1. Firms To Quote Separately For Each Year. 2. Firm Should Quote Actual Rate Of Camc In The Bid. Discounted Rate As Per Npv Will Be Generated By The Ireps System For Ranking Purpose. Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % At (Location) Sr.Dee/Rs/Els/Ed, Sr Tamil Nadu 1.00 Set 3. T And C F.O.R Description Destination Delivery Period Description Delivery /Completion Rate Of Supply For All Items Commencement : Within 2 Months Of Issue Of Contract, Completion : However, The Delivery Within 4 Months Thereafter Period Indicated Being Tentative, May Vary At The Time Of Placement Of Order. Payment Terms S.No Description Payment Terms 1 Payment: 1) 80% Payment Will Be Allowed After Receipt Of The Item/Product In Good And Acceptable Condition At Consignees End Against Inspection Certificate And The Suppliers Challan Certificate By The Consignee Gazetted Officer. A Joint Commissioning Report Be Made On Successful Installation, Commissioning And Testing Of The Item/Product And Also Furnishing Of A Bank Guarantee(Wbg) Towards Warranty Obligations Of The Contractor For 10% Of The Value Of P.O To Consignee. This Wbg Will Be Returned After Successful Completion Of Warranty Period. Then Item/Product Will Be Kept Under Observation For One Month From The Date Of Commissioning To See The Performance Of The Item/Product . After One Month Of Commissioning A Performance Report To Be Jointly Signed By Consignee And Firm Representative. Then Balance 20% Amount Will Be Paid. (Please Refer Para 15.0 Of Part A Of Sr Tender Conditions) (2) The Above Payment Terms Shall Be Applicable Only For Supply Of The Tendered Item (Not For Camc). (3) Payment For Camc Would Be Made As Per The Terms And Conditions Of A Separate Contract Which Would Be Executed By Consignee And The Supplier Will Be Bound To Accept The Camc Contract Rate Against This Po. Statutory Variation Clause S.No Description 1 Statutory Variation In Taxes And Duties, Or Fresh Imposition Of Taxes And Duties By State/ Central Governments In Respect Of The Items Stipulated In The Contract (And Not The Raw Materials Thereof), Within The Original Delivery Period Stipulated In The Contract, Or Last Unconditionally Extended Delivery Period Shall Be To Railways Account. Only Such Variation Shall Be Admissible Which Takes Place After The Submission Of Bid. No Claim On Account Of Statutory Variation In Respect Of Existing Tax/Duty Will Be Accepted Unless The Tenderer Has Clearly Indicated In His Offer The Rate Of Tax/Duty Considered In His Quoted Rate. No Claim On Account Of Statutory Variation Shall Be Admissible On Account Of Misclassification By The Supplier/ Contractor. Page 2 Of 10 Run Date/Time: 26/06/2024 10:48:53Stores/Southern Rly Tender Document , Amc For Test Rig For E-70 Brake Equipment Of Ftrtipl Post Warranty Comprehensive Annual Main Tenance Contract For 9 Years After 6 Years Of Warranty Period. Note:- 1. Firms To Quote Separately For Each Year. 2. Firm Should Quote Actual Rate Of Camc In The Bid. Discounted Rate As Per Npv Will Be Generated By The Ireps System For Ranking Purpose. Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % Warranty Period: 6 Years, Amc Period: 9 Years, Rate Of Discounting: 10 % At (Location) Sr.Dee/Rs/Els/Ed, Sr Tamil Nadu 1.00 Set 3.

Key Value

Document Fees
Refer document
EMD
INR 425340.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail