| 1 | 11/0.4 KV Distribution transformer 25 KVA (Conventional) (Aluminium wound)(Rep-BGP) |
| 2 | 140 Kg.,8.0 Mtrs. long PCC pole |
| 3 | AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) |
| 4 | XLPE Cable 1 core unarmoured 35 sqmm Aluminium conductor 1100 Volts |
| 5 | 11 KV Pin Insulator Polymer Composit (5 KN) |
| 6 | M S Angle 65X65X6 mm |
| 7 | M S Channel 75X40x6 mm |
| 8 | M S Channel 100X50x6 mm |
| 9 | D.C. Cross-arms 8 ft centre to center (100x50x6mm) Channel |
| 10 | Transformer mounting Channel (100X50x6 mm.) |
| 11 | Trans. Belting with 50 X 50 X 6 mm.angle with two cross fixing channels |
| 12 | 11 KV D.O. Fuse Unit Polymer type |
| 13 | 11 KV Strain hardware (T&C type) fittings |
| 14 | 11 KV(45KN) Composite Polymer Disc Insulators |
| 15 | Danger Boards Enamelled 11 KV |
| 16 | 9 KV Gapless type Metal oxide (10 KA) Polymer for 33/11 kv S/s type |
| 17 | MS strain plate 65x8mm 250mm long |
| 18 | Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC |
| 19 | Bi-metallic clamps Distribution Transformers Bushing |
| 20 | Red oxide paint |
| 21 | Aluminium paint |
| 22 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 23 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire |
| 24 | Aluminium Binding wire and tape |
| 25 | Jointing Sleeves suitable for Rabbit (55Sq.mm.Al. Eq. ) AAAC conductor |
| 26 | G.I. WIRES 4.0 MM. (8 SWG) |
| 27 | M.S.Nuts with Bolts |
| 28 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm |
| 29 | Clamp for 140 Kg PCC Pole MS Flat 50x6 mm |
| 30 | Back filling of poles with boulders. |
| 31 | Stay Insulators 90X65mm |
| 32 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 33 | Stay set complete without Stay wire 16 mm. (Painted) |
| 34 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 35 | Concreting of structures & foundation (1:3:6) |
| 36 | LT Robust Fuse Unit |
| 37 | EARTHING SET (40MM , 3 METER GI PIPE , GI WIRE, EARTHING CLMAP AND NUT BOLT) |
| 38 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 39 | Labour Charges including Fabrication charges |
| 40 | Transportation Charges for All Equipments & Materials |
| 41 | GST on Transportation@5% |
| 42 | GST on (Contractor side Material + Labour) @18% |