| 1 | Material and labour for servicing ,overhauling, oiling , greasing and aligment vertically ofIndustrial type Steam Boiler. Make- Sony system complete with testing onfully functional as per the guide line byOEM recommendationwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 2 | Replacement of steam boiler hose pipe of existing size including SS clamps with nuts and bolts makeair tightand testing on full efficiency of the plant with the satisfection of Engr-in- Charge. |
| 3 | Replacement ofsteam valve for 32/25 mm bore pipe ISI marked and testing on full efficiency of the plant with the satisfection of Engr-in- Charge. |
| 4 | Replacement ofinsulation ofsteam pipe line 32/25 mm outer diacompletewith glass wool, SS neting and covered with aliminium foilcomplete with workall as directed at site by Engr - in - Charge. |
| 5 | Replacement of electronic control panelincluding complete wiring / electric supply connection ofwasher extractor of capacity 30 Kgcompleteand testingwith the satisfection of Engr-in- Charge. |
| 6 | Replacement of coppersteam pipe line 15mm dia including short piece and connecting , jointing ,bending,to required shape throughgas weldingfor electric hand operating presstable with testing on full pressure complete all as directed by Engr- in Charge. |
| 7 | Replacement offlanges off sizes for copper steam / pressurepipe line complete with rubber gasket nuts and bolts all as directed at side . |
| 8 | Replacement of copper conductor cableofsize 3 core 40/0.0076for electric hand operated press all as directed at site. |
| 9 | Replacement ofsolenoid valve 15 mm diaISI marked for steam line to electric hand operating press table complete all as specified and directed. |
| 10 | Replacement ofSS door handle with latchCat part No- AX15MF040 complete all as specified and directed. |
| 11 | Replacement of foot valve for steam boiler as per existing all as specified and directed. |
| 12 | Replacement ofwater level controller for seam boiler all as specified and directed. |
| 13 | Replacement ofplug / switch for pneumetically press as per existing complete all as specified and directed. |
| 14 | Replacement ofheater of capacity 6 KW complete all as specified and directed. |
| 15 | Material and labour for servicing ,overhauling, oiling , greasing and aligment vertically ofIndustrial type washing machineof capacity70 KG.Make- Sony system complete with testing onfully functional as per the guide line byOEM recommendationwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 16 | Replacement of fan belt \"V\" type as per existing size and make complete all as specified |
| 17 | Replacement of main ball bearing washing machine complete all as specified and directed. |
| 18 | Replacement of main ball bearing sleeve washing machine complete all as specified and directed. |
| 19 | Replacement of idler ball bearingwashing machine complete all as specified and directed. |
| 20 | Replacement of idler ball bearing sleeve washing machinecomplete all as specified and directed. |
| 21 | Material and labour for servicing ,overhauling, oiling , greasing alingment ofIndustrial type washing machineof capacity35 KG. Make- Sony system complete with testing onfully functional as per the guide line byOEM recommendationwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 22 | Replacement of fan belt \"V\" type as per existing size and make complete all as specified |
| 23 | Replacement of main ball bearing washing machine complete all as specified and directed. |
| 24 | Replacement of main ball bearing sleeve washing machine complete all as specified and directed. |
| 25 | Replacement of idler ball bearingwashing machine complete all as specified and directed. |
| 26 | Replacement of idler ball bearing sleeve washing machinecomplete all as specified and directed. |
| 27 | Replacement ofheater of capacity 6 KW complete all as specified and directed. |
| 28 | Material and labour for servicing ,overhauling, oiling , greasing alingment ofIndustrial type washing machineof capacity15 KG. Make- Sony system / Stefeb complete with testing onfully functional as per the guide line byOEM recommendationwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 29 | Replacement of operating computor ST-9 complete unit with connecting and testing complete all as specified. |
| 30 | Replacement of ball bearing front of NU 2214complete unit with connecting and testing complete all as specified of suitable size all as specified and directed. |
| 31 | Replacement of ball bearing rear 6212Zcomplete unit with connecting and testing complete all as specified of suitable size all as specified and directed. |
| 32 | Replacement of \"O\" ring set complete unit with connecting and testingcomplete all as specified of suitable size all as specified and directed. |
| 33 | Replacement of oil seal viton complete unit with connecting and testingcomplete all as specified of suitable size all as specified and directed. |
| 34 | Replacement of oil seal - nitrile complete unit with connecting and testingcomplete all as specified of suitable size all as specified and directed. |
| 35 | Replacement of circlip lock set complete unit with connecting and testingcomplete all as specified of suitable size all as specified and directed. |
| 36 | Replacement of fan belt \"V\" type as per existing size complete all as specified and directed. |
| 37 | Replacement of drainValve complete all as specified and directed. |
| 38 | Replacement of \"L\" shape drain hose pipe of size 3\" dia complete all as specified and directed. |
| 39 | Replacement ofdrain hose pipe straightof size 3\" diacomplete all as specified and directed. |
| 40 | Replacement ofheater of capacity 6 KW complete all as specified and directed. |
| 41 | Replacement ofemergenct stop push buttoncomplete all as specified and directed. |
| 42 | Replacement ofdoor gasketcomplete all as specified and directed. |
| 43 | Replacement ofvariable frequency drive complete all as specified and directed. |
| 44 | Material and labour for servicing ,overhauling, oiling , greasing alingment ofIndustrial type tumbler machineof capacity15 KG.Make- Sony system / Stefeb complete with testing onfully functional as per the guide line byOEM recommendationwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 45 | Replacement of operating computor DR-9 complete unit with connecting and testing complete all as specified and directed. |
| 46 | Replacement of\"V\" belt main drive complete all as specified and directed. |
| 47 | Replacement of\"V\" belt idlerdrivecomplete all as specified and directed. |
| 48 | Replacement of thermostat switch 30-110complete all as specified and directed. |
| 49 | Replacement of door gasket complete all as specified and directed. |
| 50 | Replacement of door limit switch complete all as specified and directed. |
| 51 | Replacement of lint door gasketcomplete all as specified and directed. |
| 52 | Replacement of blower alluminium cast complete all as specified and directed. |
| 53 | Replacement of contractor AC 3 phase 415 volt 18 Amps complete all as specified and directed. |
| 54 | Replacement of heater contractor AC single phase 230 volt 25 Amps complete all as specified and directed. |
| 55 | Replacement of teflon copper electric cable 6 Sqmm 3 core AC1100 volt gradecompete all as specified and directed |
| 56 | Material and labour for servicing ,overhauling,alingment of press table of any type.Make- Sony system / Stefeb completeall as specified and directed . Cost of under mentioned spare parts shall bepaid under respective items . |
| 57 | Replacement of blower alluminiumcomplete all as specified and directed. |
| 58 | Replacement of silicon foam padding complete all as specified and directed. |
| 59 | Replacement of padding cloth covercomplete all as specified and directed. |
| 60 | Replacement of thermostat switch of range 50-300complete all as specified and directed. |
| 61 | Replacement of electric steam iron single phase 230 voltcomplete all as specified and directed. |
| 62 | Replacement of teflon shoe for iron complete all as specified and directed. |
| 63 | Replacement of thermostat for iron complete all as specified and directed. |
| 64 | Replacement of water level switch ( double micro switch) complete all as specified and directed. |
| 65 | Replacement of water level controller ( WLCD1) complete all as specified and directed. |
| 66 | Replacement of buzzer AC 230 voltcomplete all as specified and directed. |
| 67 | Replacement of sensor switchAC 230 volt complete all as specified and directed. |
| 68 | Material and labour for servicing ,overhauling, oiling , greasing and testing ofEOT Crane of capacity 10 Ton installed at 609 EME Bnand checking allmovement , load capacity , brakesystemand smooth functioning of the CraneMake- Pull Makwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 69 | Material and labour for servicing ,overhauling, oiling , greasing and testing ofEOT Crane of capacity 2.0 / 5.0 Ton installed at 609 EME Bnand checking allmovement , load capacity , brakesystemand smooth functioning of the CraneMake- Pull Makwith the satisfection of GE(S) Meerut Cantt. Cost of under mentioned spare parts shall bepaid under respective items . |
| 70 | Disconnecting and dismanteling including up / downof unserviceable hoist slip ringmotor of capacity 17.5HP3 phase 415 volt and transportationto auth / recognised workshop for repair to slip ring motor ,removing the existing copper burnt wire from rotor as well as statar, cleaning the slots thoroughly and rewinding the statar and rotor ofmotor capacity 17.5 HPwithsupper enameled copper conductor of existing gauge andturns including insulating material like,insulating paper , sleeves and varnishing completereset themotor withtesting on full load to achieve the efficiencyof crane . |
| 71 | Replacement of carbon brush suitable for 17.5 HP motorof existing size and approved by Engr-in- Charge. |
| 72 | Replacement of carbon brush holder suitable for 17.5 HP motor of existing size and approved by Engr-in- Charge. |
| 73 | Replacement of ball bearing suitable for 17.5 HP motor of existing size ISI Markedall as specified and directed. Make- SKF / TATA/ Siemens |
| 74 | Repair to bearingcover sheet suitable for 17.5 HP motor after removal of unsv sheet and cleanining complete all as specified and directed. |
| 75 | Repair of rotor sheetsuitable for 17.5 HP motor after removal of unsv sheet and cleanining complete all as specified and directed. |
| 76 | Disconnecting and dismanteling including up / downof unserviceable hoist slip ringmotor of capacity 10.0HP3 phase 415 volt and transportationto auth / recognised workshop for repair to slip ring motor ,removing the existing copper burnt wire from rotor as well as statar, cleaning the slots thoroughly and rewinding the statar and rotor ofmotor capacity 10. HPwithsupper enameled copper conductor of existing gauge andturns including insulating material like,insulating paper , sleeves and varnishing completereset themotor withtesting on full load to achieve the efficiencyof crane . |
| 77 | Replacement of carbon brush suitable for 10.5 HP motorof existing size and approved by Engr-in- Charge. |
| 78 | Replacement of carbon brush holder suitable for 10.0 HP motor of existing size and approved by Engr-in- Charge. |
| 79 | Replacement of ball bearing suitable for 10.0 HP motor of existing size ISI Markedall as specified and directed. Make- SKF / TATA/ Siemens |
| 80 | Repair to bearing cover sheet suitable for 10.50 HP motor after removal of unsv sheet and cleanining complete all as specified and directed. |
| 81 | Repair of rotor sheetsuitable for 10.0 HP motor after removal of unsv sheet and cleanining complete all as specified and directed. |
| 82 | Disconnecting and dismanteling including up / downof unserviceable hoist slip ringmotor of capacity 4.0HP3 phase 415 volt and transportationto auth / recognised workshop for repair to slip ring motor ,removing the existing copper burnt wire from rotor as well as statar, cleaning the slots thoroughly and rewinding the statar and rotor ofmotor capacity 4. HPwithsupper enameled copper conductor of existing gauge andturns including insulating material like,insulating paper , sleeves and varnishing completereset themotor withtesting on full load to achieve the efficiencyof crane . |
| 83 | Replacement of carbon brush of existing size and approved by Engr-in- Charge. |
| 84 | Replacement of carbon brush holder of existing size and approved by Engr-in- Charge. |
| 85 | Replacement of ball bearing of existing size ISI Markedall as specified and directed Make- SKF / TATA/ Siemens |
| 86 | Replair of cover sheet after removal of unsv sheet and cleanining complete all as specified and directed. |
| 87 | Replair of rotor sheetafter removal of unsv sheet and cleanining complete all as specified and directed. |
| 88 | Material and labour for servicing of DG set of capacity 40 KVA make - Cummins installed at MIRoom HQ 49 Bde Bhagat Line , complete with replacement of unsv fuel filter, oil filter, drainingout old E/ oil and Coolant including cleaning of oil sump and radiator by applying reverse water pressur inside the radiator, radiator inlet/ outlethose pipes, fan veltcomplete with the satisfaction of Engr-in- Charge . All connected items such as fuel filter , oil filter , Coolant/ E/Oil , fan velt shall be supply and paid under respective items . |
| 89 | Supply only Fuel Filter completed all as specified and directed. |
| 90 | Supply only Lub oil filter completed all as specified and directed. |
| 91 | Supply only Radiator Fan beld completed all as specified and directed. |
| 92 | Supply only Radiator hose pipe inlet and outlet with SS adjustable clamp completed all as specified and directed. |
| 93 | Supply only Flexible fuel supply pipe fitter to FIP completed all as specified and directed. |
| 94 | Supply only Alternator Fan belt completed all as specified and directed. |
| 95 | Supply only Coolant for DG set completed all as specified and directed. |
| 96 | Supply only Engine oil grade 15w40 as recommanded by OEM completed all as specified and directed. |
| 97 | Material and labour for servicing of DG set of capacity 62.5 KVA Make - Kirloskar. complete with replacement of unsv fuel filter, oil filter, drainingout old E/ oil and Coolant including cleaning of oil sump and radiator by applying reverse water pressur inside the radiator, radiator inlet/ outlethose pipes, fan veltcomplete with the satisfaction of Engr-in- Charge . All connected items such as fuel filter , oil filter , Coolant/ E/Oil , fan velt shall be supply and paid under respective items . |
| 98 | Supply only Fuel Filter completed all as specified and directed. |
| 99 | Supply only Lub oil filter completed all as specified and directed. |
| 100 | Supply only Radiator Fan beld completed all as specified and directed. |
| 101 | Supply only Radiator hose pipe inlet and outlet with SS adjustable clamp completed all as specified and directed. |
| 102 | Supply only Flexible fuel supply pipe fitter to FIP completed all as specified and directed. |
| 103 | Supply only Alternator Fan belt completed all as specified and directed. |
| 104 | Taking out fuel injector pump assembly from DG set of capacity 62.5 KVAMake- Kirloskar and carrying to the authorised Wk Sp for repair and calibration including replacement of minor part like washer , bolt, gasket as required at site and refixing the same including testing with the satisfaction of Engr-in- Charge. |
| 105 | Taking out self starter 12 Voltfrom DG setand carrying to the authorised Wk Sp for repair and rewindingincluding replacementof pinion and teeth ,carbon bush set with holdersolenoid switch andminor part like washer , bolt as required at site and refixing the same including testing with the satisfaction of Engr-in- Charge. |
| 106 | Material & labour for earthing complete with galvanised mild steel earth plate electrode 60cmx60cmx6mm thick buried directly in ground (earth pit not less than 2.25mtr deep below ground level) with top edge of the plate not less than 1.5mtr below normal ground level steel earth plate connected with GI strip 32x6mm by means oflug, bolts, nuts, check nuts, washers of galvanised iron or steel GI protection pipe 15mm bore light grade all as shown in elect plate No.3 of SSR part I connecting to main switch board / Main DB’s/ Machinery etcincluding excavation, earth work, salt and charcoal dust mixed and packed 150mm thick around GI earth plate, GI pipemedium grade 20mm nominal bore watering pipe GI sheet funnel wire mesh, concrete pit, RCC cover in PCC 1:2:4 type B1 duly reinforced with MS Bars 6mm dia at the rate of 150mm center to center both way with suitable lifting handle and pit / chamber in PCC 1:3:6 type C1 , Angle iron 40x40x5mm frame for pit cover including testing on completioncomplete all as specified and directed. |
| 107 | Taking out carefully unserviceable submersible pump from sewage sump well25 feet deep by disconnecting of allpipe line connectionby means of chain pulleyand tepoy stand upto capacity of pump 5.0 HP pumpcomplete all as directed by Engr- in- Charge. |
| 108 | Material andlabour to repair the unserviceablesubmersible pump three phase 415 Volt of capacity 5.0 HP byrecognised/ auth workshop ,segregate the pump and motor separately removing old burnt winding wire cleaning the slotes and rewindingofsubmersible motorwith PVC insulated copper conductor of existing gauge andturns including insulating material like,paper ,sleeves and varnishing completereset the pump and motor withtesting on full load to achieve the efficiency of pump for the satisfection of Engr-in-Charge. |
| 109 | Ball bearing suitable size for5.0 HP pump motorincludingfixing complete with nuts and bolt as required and allas directe. Make- TATA/ NBC/ SKF |
| 110 | Lowering the submersible pumpcarefully in sewage sump well 25 feet deep and connecting all pipe line connectionwith the help of chain pulleyand tepoy stand upto capacity of pump 5.0 HP including testing completeall as directed at site. |
| 111 | Disconnecting and dismanteling unserviceablecentrifugal pump set with motor electric drive 3 phase 415 volt 25.0 HP and transportationto auth / recognised workshop. Segregation the centrifugal pumpand motor.Removing the existing copper burnt wire, cleaning the slots thoroughly and rewinding the motor of capacity 25.0 HPwithsupper enameled copper conductor of existing gauge andturns including insulating material like,insulating paper , sleeves and varnishing completereset the pump and motor withtesting on full load to achieve the efficiency of pump for the satisfection of Engr-in-Charge. Note- The copper winding wire will be measured and paid underrespective item). |
| 112 | Disconnecting and dismanteling of unserviceable inductionmotor ( Air blower make- Usha)electric driven 3 phase 415 volt 10.0 HP and transportationto auth / recognised workshop motor for rewinding after removing the existing copper burnt wire, cleaning the slots thoroughly and rewinding the motor of capacity 10.0 HPwithsupper enameled copper conductor of existing gauge andturns including insulating material like,insulating paper , sleeves and varnishing completereset the pump and motor withtesting on full load to achieve the efficiency of pump for the satisfection of Engr-in-Charge. Note- The copper winding wire will be measured and paid underrespective item). |
| 113 | Repairing of centrifugalpump of capacity 25.0 HP, opening the pump andshaft and separetely carry out the lathe work bymetalling to shaft , turning,finishing and polishing complete and replacement of unsv oil seal, minor part like nuts, bolts and washer deemed to be inclusive in the rate quoted. |
| 114 | Repairing of Air blower coupled with induction motor 10/15.0 HP , opening the blower segerigate the unsv parts andreplacemet of unseviceable teath gears includinglathe work bymetalling to shaft , turning,finishing and polishing complete and replacement of unsv oil seal refilling the blower oil up to level mark , minor part like nuts, bolts and washer deemed to be inclusive in the rate quoted. |
| 115 | Replacement of motor / pump ball bearing of capacity 25.0 HP pump ofexisting size all as directed . Make- TATA,/ NBC/ SKF. |
| 116 | Supply and fixing in replacement of pressure gauge heavy duty metallic body in sewage treatment plantsof range-0 to 7Kg / Sq Cm. |
| 117 | Supply and fix in replcement ofsluicevalve butterfly type flange end both side heavy duty of size 100mm boreISI mark complete with nuts, bolts and washer complete all as specified and directed at site. Make- Zoloto / Leader |
| 118 | Supply and fix in replcement ofsluicevalve butterfly type flange end both side heavy duty of size 80 mm boreISI mark complete with nuts, bolts and washer complete all as specified and directed at site. Make- Zoloto / Leader |
| 119 | Supply and fix in replacement of PAC dosing pump electro magneticdrive less moving parts,Max flow rate 0-6 Ltr / Hrs with pressure 3.5 Kg/Cm2 single phase AC , 230 Volt 50 Hz, Suction lift up to 1.5 mtr water max , flow adjusment o to 100% |
| 120 | Taking down carefully under ground cable of any size and making good to disturbed surface as per existing complete all as specified and directed. |
| 121 | Supply, laying commissioning, testing of XLPE under ground LT cable 1100 volts grade of size 50 Sqmm 3.5 core armoured, PVC sheathed with aluminium conductor heavy duty laid in trenches, fixing on wall, under road crossing through protection pipe etc complete all as specified and directed. |
| 122 | Supply, laying commissioning, testing of XLPE under ground LT cable 1100 volts grade of size 25 Sqmm 3.5 core armoured, PVC sheathed with aluminium conductor heavy duty laid in trenches, fixing on wall, under road crossing through protection pipe etc complete all as specified and directed. |
| 123 | Supply, laying commissioning, testing of XLPE under ground LT cable 1100 volts grade of size 16 Sqmm2core armoured, PVC sheathed with aluminium conductor heavy duty laid in trenches, fixing on wall, under road crossing through protection pipe etc complete all as specified and directed. |
| 124 | Excavationin trenches not exceeding 1.5 m wide and not exceeding 1.5 M depth in soft/ loose soil and geting outcomplete all as specified and directed. |
| 125 | Material and labour for sand cushioningwith dry fine sand including filling, spreading, levelling in layers in cable trench with approved quality of sand for protection of under ground cable complete all as specified and directed. |
| 126 | Material and labour for contineous brick edging withwidth equal to the depth of the brick of whole sub class \"B\" bricks laid on edge complete all as specified and directed. |
| 127 | Supply / laying and fixing 50 mm bore galvanised steel tubes with all fittings, light grade, laid in trenches for cable protection complete all as specified and directed. |
| 128 | Returning, filling in, including spreading, leveling, watering and well ramming in layers n. exc. 25 cm thick in soft / loose soil complete all as specified and directed. |
| 129 | Removing surplus excavated materials n.exc. 50 Mtr and depositing where directed at a level n. exc. 1.5 Mtr above the starting point complete all as specified and directed. |
| 130 | S & F in repair, security light brackets of 32 mm dia GI pipe medium grade upto 0.6 mtr long bend to shape at 100-120 degree including flat iron clamps and Suitable nuts and bolts grouted in wall including all material required for fitting, including matching the surface with existing all as specified and directed by EIC. |
| 131 | Supply and installed in replacement of LED Sensor light fitting 1x 70 Watt luminaries colour temprature 5700 K pressure die cast aluminium housing comprising high power LEDs enclosed with lens embedded PC cover with LED driver complete IP 65 protection. : Make:-Syska |
| 132 | S & F in repair,DOL starter model MK1( HSN Code 8536) three phase 415 volt50 Hz AC, relay range 11-18 (A)suitable for 5 HP electric driven motor atsewage plants. |
| 133 | S & F in repair,fully autometic Star Delta Starter model MU 2SASD ( with MU relay)Starter Model HSN Code 8536three phase 415 volt50 Hz ACsuitable for 30 HP electric driven motor atsewage plants. |
| 134 | S & F in repair, OFF line change over switch with handle4 pole 415 Volt 50 Hz200 Amps AC supply complete with dismantling old unsv andall as directed . Make- Havells |
| 135 | S & F in repair, MCCB4 pole 415 Volt AC 50 Hz160Amps25 KA (F2) complete with dismantling old unsvall as directed . Make- Indo Asian |
| 136 | S & F in repair foot valve 100mm dia plastic heavy dutywith one end threeded as per sample. |
| 137 | S & F in repairpower contactormodel MU 2 HSN code 8536,415 volt 50 Hzthree wire suitable for 25 HP motor complete as per sample or as directed. Make- L&T (LK) |
| 138 | S & F in repair PVC heavy duty flexible pipe 100mm dia complete all as directed .As per sample |
| 139 | S & F in repair PVC sectionheavy duty flexible pipe 80mm dia complete as per sample or as directed. |
| 140 | S & F in repair PVC sectionheavy duty flexible pipe 65mm dia complete as per sample or as directed. |
| 141 | Material and labour in replacement of air deffusers in STP MBBR/ Equalization / Sludge tanks of size 25mm dia PVC heavy duty tread type complete as per sample or as directed. |
| 142 | Material and labour in replacement of moving bedMBBR filter floating media ring type plain surface area > 80 sqm / cum. completeall as specified and direcred. |
| 143 | Material and labour charges for cleaning out of sludge holding tank after pumpingout allfluidsand taking outsolid sludge deposited inside the tank ofplant capacity 200 / 400/500/700 KLD complete all as specified and direcred. |
| 144 | Material and labour charges for cleaning out of equalizationtank after pump out all fluidsand taking out solidsludge deposited in side the tank by mechanically of plant capacity 400 / 500 KLD complete with the satisfection ofEngr-in- Charge. |
| 145 | Material and labour chargesfor cleaning out of treated watertank after pump out allwater and taking outall solid / sludge depositedin side the tank by mechanicalof capacity 200/400/500KLD complete with the satisfection ofEngr-in- Charge. |
| 146 | Material and labour chargesfor cleaning out of oil and grease chamber after drainig out allwater and taking outof solid / sludgedepositedin side the tankby mechanical of capacity 200/400/500 KLD complete with the satisfection ofEngr-in- Charge. |
| 147 | Material and labour chargesfor cleaning out of MBBR tank after drainig out allwater and taking outof solid / sludgedepositedin side the tank segregate the MBBR mediatank of capacity 200/400/500 KLD complete with the satisfection ofEngr-in- Charge. |