| 1 | Four windows toughened glass & VIP cabin (Size: 2\" X 2\" 9\" each)to be renewed with new toughened glass alongwith its channel etc.as per direction of EIC. |
| 2 | Buster gear pump (make Bosch, sl no.380168889) of port gearbox is not working properly, same to be serviced/repaired with renewal of spare parts as requiredand make proper operational, as per direction of EIC. |
| 3 | Labour charges |
| 4 | Cost of spares on actual plus 10% basis. |
| 5 | Servicing of seawage pump & both GS pump (motor driven, BE pumps, sl no 7/1/1587,1590) with renewal of spare parts as required and make proper operational as per direction of EIC . |
| 6 | Labour charges |
| 7 | Cost of spares on actual plus 10% basis. |
| 8 | Painting of ship side, main deck, super structure, roof engine room , man holes & all side railing etc. to be done with one coat of red oxide primer followed by two coat of existing colour paints after chipping, wire brushing and cleaning as required, as per direction of EIC. |
| 9 | Microphone (Mike) is not working. Same to be renewal as per direction of EIC. |
| 10 | V.H.F set (sailor compact RT2048) is not working properly, same is to be checked and rectified the defect/renewed as required. |
| 11 | Labour charges |
| 12 | Cost of spares on actual plus 10% basis. |
| 13 | Anchor windlass (Capacity: motor 2.2 KW, 3HP, 3phase) is to beserviced, as the oilis leaking. (motor 2.2 KW,3HP,3phase) |
| 14 | Labour charges |
| 15 | Cost of spares on actual plus 10% basis. |
| 16 | Upper deck aft size canopy to be replced of size 10ft*18.4ft with fibre sheet and necessary nut, bolt etc as required as per direction of EIC. |
| 17 | Labour charge |
| 18 | Cost of spares on actual plus 10% basis. |
| 19 | Electrical lines fittings and installation i.e. of search light, flood light , navigation light,DC light in crew room, cabin light, switch/socket andWall fans (06no.) to be checked/serviced and rectified the defects, as per direction of EIC. |
| 20 | Labour charge |
| 21 | Cost of spares on actual plus 10% basis. |
| 22 | Fire extinguisher to be tested, serviced and to be refilled with same material as required as per direction of EIC/IWT Surveyor. Test report to be submitted. |
| 23 | Mech.Foam type - 9 Ltrs |
| 24 | Water CO2 - 9 Ltrs |
| 25 | D.C.P.T. type - 5 Kg |
| 26 | Serviceing of self startor and dynamo with renewal & spare parts as required for proper working(main engine make greeves ,743M (port and stbd side) |
| 27 | Labour charges |
| 28 | Cost of spares on actual plus 10% basis. |
| 29 | Top overhauling of both gen set engine Make- kirlosker,BHP-43 & 14 are to bedone with renewal of spare partsas required for proper operational including servicing and testing of fuel pump and injector.Both engine running Hr. more than-2000hrs |
| 30 | Labour charges |
| 31 | cost of spares on actual plus 10% basis. |
| 32 | BOQ FOR SL GHAGHARA |
| 33 | Painting of ship side, main deck, super structure,roof engine room , man holes & all side railing etc. to be done with one coat of red oxide primer followed by two coat of existing colour paints after chipping, wire brushing and cleaning as required, as per direction of EIC. |
| 34 | Hydraulic steering system to be checked andrestricted the leakage of hy. Oil, as per direction of EIC. |
| 35 | Labour Charge |
| 36 | Cost of spares on actual plus 10% basis. |
| 37 | Servicing GS pumps (02nos) with renewal of spare parts as required as per direction of EIC |
| 38 | Labour charges |
| 39 | Cost of spares on actual plus 10% basis. |
| 40 | Remote control of port gear unit is not working properally. The same to be checked and rectifed the defects for smooth working. |
| 41 | Labour Charge |
| 42 | Cost of spares on actual plus 10% basis. |
| 43 | Microphone (Mike) is not working. Same to be repaired/replaced. |
| 44 | V.H.F set is not working properly, same is to be checked and rectified the defect/ renewed if required. |
| 45 | Labour charges |
| 46 | Cost of spares on actual plus 10% basis. |
| 47 | Sea water pump of port side M.E to be serviced with renewal of spare-parts as reqd, as per direction of EIC.Make: BE Pumps Pvt Ltd, Type: Centrifugal Pump |
| 48 | Labour charges |
| 49 | Cost of spares on actual plus 10% basis. |
| 50 | Servising of split Air Conditioning (AC) of 1 and 1.5 ton capacity make Voltas to be done& make operational. |
| 51 | Labour charges |
| 52 | Cost of spares ( At Actual +10% basis) |
| 53 | Fire extinguisher to be tested, serviced and to be refilled as required as per direction of EIC/IWT Surveyor.Test report to be submitted. |
| 54 | Mech.Foam type - 9 Ltrs |
| 55 | Water CO2 - 9 Ltrs |
| 56 | D.C.P. type - 5 Kg |
| 57 | Supplyof Wooden make saal wood ladder 01 no. L= 15 ft , W=15inch, T=02inch alongwith stopper (stopper distance will not be more than 12inch) as required as per direction of EIC . |
| 58 | Supply and installation of reputed make water Purifier (RO) with booster pump in dining hall/mess room and galley as required as per direction of EIC. |
| 59 | Labourcharges |
| 60 | Cost of spares actual + 10% basis |
| 61 | BOQ FOR SL JAHANAVI |
| 62 | Chipping, brushing, cleaning and Painting of ship side from LWL to deck, super structure, ballast tanks,hatches, engine room, man holes & engine room, bathroom, bilges, bollards, wheel house, crane and railing including all fitments are to be properly cleaned chipping, scrapping, wire brushed and painted by threecoats of marine paint (anti corrossive coating, as per direction ofSurveyor/EIC. |
| 63 | Full overhauling of DG-I engines make Kirloskar (model no-2R1040) to be done with renewal of spare parts and servising/ machining /testing as required, as per direction of EIC. |
| 64 | Labour charges |
| 65 | Cost of spare-parts on actual plus 10% basis. |
| 66 | RPM meter measuring gauges, lub. Oil tempeture of both main engines to be renewed as required as per direction of EIC. |
| 67 | Labour charges |
| 68 | cost of spares on actual plus 10% basis. |
| 69 | Sea water pump (Centrifugal BE Pumps) of both side M.E to be serviced with renewal of spare-parts as reqd, as per direction of EIC. |
| 70 | Labour charges |
| 71 | Cost of spares on actual plus 10% basis. |
| 72 | Heat exchanger tank/Radiator of harbour genset leaking & seems to crack at edge portion , the same is to be fabricated & fitted afterchemically cleaned,hydralic tested, as per direction of EIC. |
| 73 | Labour charges |
| 74 | Cost of spares on actual plus 10% basis. |
| 75 | Heat exchanger of main genset is to be chemically cleaned,hydralic tested and repaired, as required as per direction of EIC. |
| 76 | Blige to be cleanedproperly in engine room. |
| 77 | Fire extinguisher is to be serviced, tested and refilled and certificate is to be produced. |
| 78 | DCP - 5 ltrs |
| 79 | Mechanical Foam type 9 ltrs |
| 80 | Mechanical Foam type 50ltrs |
| 81 | Water type-9 Ltr |
| 82 | BOQ FOR SL MANDAKINI |
| 83 | Painting of ship side, main deck, super structure,roof engine room , man holes & all side railing etc. to be done with one coat of red oxide primer followed by two coat of existing colour paints after chipping, wire brushing and cleaning as required as per direction of EIC. |
| 84 | Top Overhalling ofDG-I engines make Simpsons (model no-325 ) is to be done including servicing and testing of fuel pump and injector. Engine running Hr. more than-1962hrs |
| 85 | Labour charges |
| 86 | Cost of spare-parts on actual plus 10% basis. |
| 87 | Rudder angle indicatorin wheel house is not working. Same to be checked & repair the system/ sensor/transmeter/motor(from engine room to wheel house), as required as per direction of EIC. |
| 88 | Labour charges |
| 89 | cost of spares on actual plus 10% basis. |
| 90 | Electrical lines its fittings and installation i.e.navigation light, anchor light,DC light , halogen light, switch and socket to be checked/serviced and rectified the defects, as per direction of EIC. |
| 91 | Labour charge |
| 92 | Cost of spares on actual plus 10% basis. |
| 93 | Wheelhouse window plywood & door (01 no.) is damaged , Same to be renewed alongwith good qualityplywood/new wood, as per direction of EIC.(size-30\"\"X6\"\") & DoorSize:6\" X 4\" x 1\" |
| 94 | Labour charges |
| 95 | Cost of spares on actual plus 10% basis. |
| 96 | Servicing of blowers in STBD side engine including labour and materials as per direction of EIC |
| 97 | Fire extinguisher to be tested, serviced and to be refilled as required as per direction of EIC/IWT Surveyor.Test report to be submitted. |
| 98 | Mech.Foam type - 9 Ltrs |
| 99 | Water CO2 - 9 Ltrs |
| 100 | DCP type - 5 Kg |
| 101 | Gearbox (port), Make: ZF Marine, Type: ZF280-1A) to be checked as abnormal sound and gear oil leakinging noticed necessary rectification/ servising to be done with renewal of spare partsand make proper operational as required, as per driection of EIC. |
| 102 | Labour charges |
| 103 | Cost of spares actual + 10% basis |
| 104 | BOQ FOR SL RIHAND |
| 105 | Painting of ship side, main deck, super structure, man holes & all side railing etc. to be done with one coat of red oxide primer followed by two coat of existing colour paints after chipping, wire brushing and cleaning as required, as per direction of EIC. |
| 106 | Officer\"s cabin in wheelhouse & dinning tableis damaged made of plywood/wood, Same to be renewed alongwith good qualityplywood/new wood, as per direction of EIC. |
| 107 | Labour charges |
| 108 | Cost of spares on actual plus 10% basis. |
| 109 | Measuring gauges i.e. RPM meter of both main engines & DG-II in wheel house are not working. Same to be checked & repaired/ renewed incl.sensors, as per direction of EIC. |
| 110 | Labour charges |
| 111 | cost of spares on actual plus 10% basis. |
| 112 | Microphone (Mike) is not working. Same to be renewal as per direction of EIC. |
| 113 | Remote control of both gear unit is not working properally. The same to be checked and rectifed the defects for smooth working. |
| 114 | Labour Charge |
| 115 | Cost of spares on actual plus 10% basis. |
| 116 | Fire extinguisher to be tested, serviced and to be refilled as required as per direction of EIC/IWT Surveyor.Test report to be submitted. |
| 117 | Mech.Foam type - 9 Ltrs |
| 118 | Water CO2 - 9 Ltrs |
| 119 | D.C.P. type - 5 Kg |
| 120 | BOQ FOR BARGE BAHAK-25 |
| 121 | Cropping & renewal of crew cabin with MS plate & angles/ channel to be done after dismantling of old cabin on deck plate with thickness (5mm) of the plateas per direction of EIC.(Size 3.3M X 2.5 M X3.0 M) |
| 122 | Fabrication of crew cabin (MS plate) with ply board/grasswood/sunmica cover inside roof and crew cabin bunk board (size-6 feet X 2 feet)as per direction of EIC. |
| 123 | Labour charges |
| 124 | Cost of spares on actual plus 10% basis. |
| 125 | Painting of crew cabin (inside & outside) areaalongwith fittings accessories to be done with one coat of zinc chromate primer followed by two coats of existing colour anti crossivepaints as required as per direction of EIC. |
| 126 | Tyre fender alogwith its chains of appropriate length & dia., buldog clamp to be supplied as required, as per direction of EIC. |
| 127 | Renewal of necessary lock (7lever) of manholes as required as per direction of EIC. |
| 128 | Fabrication and insatallation of shed (corrogated sheet) at aft side as for the direction of EIC. (Size 6ft.X6ft) |
| 129 | Labour charges |
| 130 | Cost of spares on actual plus 10% basis. |