|
| 1 | 20 MLD STP O&M |
| 2 | Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining, |
| 3 | A-Variable cost for 1st Year |
| 4 | Dewatering polymer @1.2kg/ton of dry Solids |
| 5 | Chlorine @5mg/L |
| 6 | Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM |
| 7 | B-Fix Cost For 1st Year |
| 8 | Civil, E&M Maintenance work |
| 9 | Operational Staff (Detail Required) |
| 10 | Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining, |
| 11 | A-Variable cost for 2nd Year |
| 12 | Dewatering polymer @1.2kg/ton of dry Solids |
| 13 | Chlorine @5mg/L |
| 14 | Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM |
| 15 | B-Fix Cost For 2nd Year |
| 16 | Civil, E&M Maintenance work |
| 17 | Operational Staff (Detail Required) |
| 18 | Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining, |
| 19 | A-Variable cost for 3rd Year |
| 20 | Dewatering polymer @1.2kg/ton of dry Solids |
| 21 | Chlorine @5mg/L |
| 22 | Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM |
| 23 | B-Fix Cost For 3rd Year |
| 24 | Civil, E&M Maintenance work |
| 25 | Operational Staff (Detail Required) |
| 26 | Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining, |
| 27 | A-Variable cost for 4th Year |
| 28 | Dewatering polymer @1.2kg/ton of dry Solids |
| 29 | Chlorine @5mg/L |
| 30 | Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM |
| 31 | B-Fix Cost For 4th Year |
| 32 | Civil, E&M Maintenance work |
| 33 | Operational Staff (Detail Required) |
| 34 | Operation and maintenance of the various units of 20 MLD STP plant based on sequential bach reactor (SBR) technology including mps for 5 years as a whole including supply of chemical and consumables disposal of plant residuals (eg. Screening, grit and dewatered sludge) manpower required general maintenanceof mechanical equipment electrical item field instrument, Horticulture & Landscapping etc. cost of collection analysis reporting monitoring and maintaining, |
| 35 | A-Variable cost for 5th Year |
| 36 | Dewatering polymer @1.2kg/ton of dry Solids |
| 37 | Chlorine @5mg/L |
| 38 | Carriage of Sludge, Grit, Floating particle from STP to Dumping Ground/Low line area Lead upto 5KM |
| 39 | B-Fix Cost For 4th Year |
| 40 | Civil, E&M Maintenance work |
| 41 | Operational Staff (Detail Required) |
| 42 | OCEMS Work (PART-A)\"Supply, Installation, Testing &Commissioning of Effluent Quality Monitoring System at Designated Location for Real Time based continuous measurement using chemical free common / separate sensors for following parameters within their specified measuring ranges. COD, BOD, TSS,Nitrate, Total Nitrogen Total Phosphorus, pH and temperature as per the attached Annexure \"\"A\"\". Complete all work, including one year Operation and Maintenance.Online Effluent monitoring data to be connect with servers of the concerned SPCB/PCC and CPCB in a time bound manner. Above Monitoring System shall comprise Local Real Time Data Acquisition Unit with Backlight LCD display with the provision of up linking the data intermittently during the day via SMS/ GPRS to Mobile/s or the Centralized Monitoring Station (Client’s Scope) in CSV format.(a) including O & M for Ist year All STP (20MLD STP Sec-Ecotech-3) |
| 43 | (b) O & M for2ndyear20MLD STP Sec-Ecotech-3. |
| 44 | (.c) O & M for3rdyear20MLD STP Sec-Ecotech-3. |
| 45 | (d) O & M for4thyear20MLD STP Sec-Ecotech-3. |
| 46 | (e) O & M for5thyear 20MLD STP Sec-Ecotech-3. |
| 47 | Supply Installation Testing Commissioning of Online open channel microprocessor based ultrasonic type Flow meter along with following features:1) Type of Display: 2-Line LCD display with operational Key. 2) Transmeter type: Remote wall mounted with cable gland.3) Unit of display: Flow rate : m3/hr, Totalizer flow : m3 4) Accuracy: +/- 0.5% of measured value. 5) Power Supply: 0-50VAC,45-65Hz, optinal : 11-40VDC 6) Self diagnostic features7) Transmitter enclosure material : Non-corrosive, Die cast aluminium/Polycarbonate8) Memory: 100% secure data storage9) Communication: Suitable for wired communication.10) Protection class:IP67including O & M for five year 20MLD STP Sec-Ecotech-3, |
| 48 | Add labour cess will be paid extra as per applicable |
| 49 | GST will be paid extra as per applicable |