Public Administrative Department Local Bodies Closing in 0 days TDR #43773223

Tender For Installation Of Solar Street Light From Abad Malancha Sasan To Subodh Mandal House (River Bank) At Minakhan Gp Of Muuja Madari Abad. Village - Madari Abad Under Minakhan P.S. , N24 Pgs Under 5Th Sfc ( Untied) Fund. During The Year 2024-2025. (

Issued by Local Bodies · minakhan, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Jun 2024
0 days left
EMD
3632
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
minakhan → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Installation of Solar Street Light from Abad Malancha Sasan to Subodh Mandal House (River Bank) at Minakhan GP of Muuja Madari Abad. Village - Madari Abad Under Minakhan P.S. , N24 Pgs under 5th SFC ( Untied) Fund. During the year 2024-2025. ( 8 nos SOLAR LIGHT)

BOQ

Name of Work: Installation of Solar Street Light from Abad Malancha Sasan to Subodh Mandal House (River Bank) at Minakhan GP of Muuja Madari Abad. Village - Madari Abad Under Minakhan P.S. , N24 Pgs under 5th SFC ( Untied) Fund. During the year 2024-2025. ( 8 nos SOLAR LIGHT)
Sl. No. Item Description
1Supply and installation of Module -75 Wp (ERTL and Flash Tested) :- i). The PV module shall contain crystalline silicon solar cells and must have a cerificate of testing conforming to ] EC 61215 Edition. ii). The power output of the modules under STC would be a minimum of 75 Wp at a load voltage of 18.83 +1- 0.2 V. iii).T he open circuit voltage of the PV modules under SIC would be 22.00 volts. iv). The module efficiency would be 15%. v). SPV module shall be highly reliable, lightweight and shall have a service life of more than 25 years. SPV modules shall have a limited power loss of not more than 10% of nominal output at the end of 10 years and not more than 20 % at the end. vi). The solar module shall be able to wishstand the following environmental conditions normally encountered ta site - Temp. extremes ranging from 100 mph to 180 mph wind load, 150 Km/h maximum mean hourly rainfall of 40 mm humidity level upto 95 %. Make:- HR / Vikram / Any MNRE Approved
2Supply and fixing of 18-Watt L.E.D Street Light:-i. The light source will be white LED type.H. Colour temperature of white LED used in the system should be in the range of 5500 K-6500 K.Hi. 18 Watt LED with inbuilt LiFePO4 battery and inbuilt Dusk-to-Drawn Charge Controller with minimum lumens 120.iv. LiFePo4 Battery with 12.8 V, 24 Ah batteryV. Inbuilt charge control units and other electronics supporting to Dimming facilities after 5 hrs. and after 5 hours 50 % lighting, Dusk to Dawnfacilities PWM/MPPT type- Maximum power point tracking, charge controller rating @ related voltage minimum 8 amp. Average DutyMake:- Light Make :- Osram I Edision I Any MNRE Approved.Battery Make :- Explore Synergy / Amtek / Okays IBIS Ceritified Brand IAny MNRE Approved
3Inbuilt Charge Control Units and other Electronics supporting to Dimming facilities after 5 hrs. & after 5 hrs. 50% lighting, Dusk to Dawn facilities PWM I MPPT type - Maximum Power Point Tracking Charge controller Rating @ Related Voltage minimum 8 amps. Average Duty Cystle - Dusk to Dawn. Make:- TBEI / Any MNRE Approved
4Supply and Erection of G.l. Pole - 5 meter i. A corrosion resistant metallic frame structure must be fixed on the pole to hold the SPV module.ii.T he frame structure must have provision to adjust its angle of inclination to the horizontal between 0 and 45, so that the module can be oriented at the specified tilt angle.iii. Pole height Swedge 2 PARTS Mtrs. (Dia. = 73 mmx 61 mm ) with grounding facility ( Corrosion resistance) & 2.2 mm thickness.iv. Civil Work -The pole should be grouted with C.0 mixture of 1: 2: 4 of die. 300mm having depth of 700 mm and 300 mm above ground level with 300 mm dia. Make :-Any MNRE Approved
5Supply and fixing of Cable & Lugs :- - Core, 2.5 Sq. mm for battery charging & 2-Core, 1.5 Sq. Mm for load and others and lugs as per requirement Make :-Any MNRE Approved.

AI Tender Summary

OUR REF NO 43773223
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 26-06-2024
Authority
Authority Name Zilla Parishad
Work Description Installation of Solar Street Light from Abad Malancha Sasan to Subodh Mandal House (River Bank) at Minakhan GP of Muuja Madari Abad. Village - Madari Abad Under Minakhan P.S. , N24 Pgs under 5th SFC ( Untied) Fund. During the year 2024-2025. ( 8 nos SOLAR LIGHT)
Basic Detail
Tender No WB/NPG/MINAKHAN/EQ-01 1st Call /5th SFC Dt.18-06-2024
Bidding Type Tender
Location
City minakhan
State West Bengal
Key Dates
Publish Date 19 Jun 2024
Submission Date 26 Jun 2024
Open Date 28 Jun 2024
Finance
Tender Value Ref. Documents
Tender Fee 500
EMD 3632
Exemption Available
Document List
4cb48493-655c-4b39-9478-cb0460f6ad0d.html
BOQ_1516158.xls
EQ01.pdf
SOQ2.pdf
Tendernotice_1.pdf
TobeReceived.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 19, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 26, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 28, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

4cb48493-655c-4b39-9478-cb0460f6ad0d.html

xls

BOQ_1516158.xls

pdf

EQ01.pdf

pdf

SOQ2.pdf

pdf

Tendernotice_1.pdf

pdf

TobeReceived.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender