| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-08-2024 | Addendum_13_BDD_Extension | Date | 13-08-2024 |
| 2 | 01-08-2024 | Addendum_12_Comm_Clar | Other | 06-08-2024 |
| 3 | 01-08-2024 | Addendum_11_Tech_Clar | Other | 06-08-2024 |
| 4 | 31-07-2024 | Addendum_10_BDD_extension | Date | 06-08-2024 |
| 5 | 25-07-2024 | Addendum_09_Tech_Clar | Other | 30-07-2024 |
| 6 | 23-07-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 30-07-2024 |
| 7 | 19-07-2024 | Addendum_07_Tech_Clar | Other | 23-07-2024 |
| 8 | 17-07-2024 | Addendum_06_Comm_Clar | Other | 23-07-2024 |
| 9 | 16-07-2024 | Addendum_05_Tech_Clar | Other | 23-07-2024 |
| 10 | 09-07-2024 | Addendum_04 | Other | 23-07-2024 |
| 11 | 01-07-2024 | Addendum_03_Pre_Bid_Meeting | Other | 23-07-2024 |
| 12 | 25-06-2024 | Addendum_02_Pre_Bid_Meeting | Date | 23-07-2024 |
| 13 | 24-06-2024 | Addendum_01_Pre_bid_Meeting | Other | 23-07-2024 |
| Sl. No. | Item Description |
| 1 | SECTION 1 |
| 2 | INSTALLATION OF EQUIPMENT (EQP) |
| 3 | Installation of static equipment supplied in single piece .For detailed work Itemdescription refer (sl no 1.1 section 1 ofAnnexure-I) |
| 4 | Erection of equipments weights up to 30 Tons |
| 5 | Erection of equipments weightsabove 30Tons & upto50 Tons |
| 6 | Erection of equipments weightsabove 50Tons & upto100 Tons |
| 7 | Erection of equipments weights above 100 & upto 200 Tons. |
| 8 | Installation of static equipment supplied in two/ multiple pieces .For detailed work Itemdescription refer (Item no 1.2 section 1 ofAnnexure-I) |
| 9 | Assembly, Installation of Static Equipment (Supplied in multiple pieces)- Fit-up, welding and pressure testing of equipment by equipment vendor, foundation preparation, equipment erection bottom part,equipment top part erection , holding the top part till completion of fit up welding , NDT completion, installation of scaffolding inside and out side of the equipment for fit up and welding of the top part, supplu of tools , tackles, power etc to the equipment vendor along with all other assistanceto equipment vendor by contractor |
| 10 | 1P25-CC-1028, C3/C4 Splitter, height 57.6m, Dia 3.768m, |
| 11 | Assistance for installation and field welding of Heavy lift equipment supplied in two pieces where Main liftingand trailing crane including erection engineering andcrew will be provided by Owner and Field welding will be carried out by equipment vendor.For detailed work Itemdescription refer (Item no 1.4 section 1 ofAnnexure-I) |
| 12 | Assembly, Installation of Static Equipment (Supplied in Two pieces)- Fit-up, welding and pressure testing of equipment by equipment vendor and all other assistance like installation of scaffolding from insude out sideof the equipment, foundation preparation for equipment erection, alignment of the equipment afy-ter erection, providing tools and tackles, power and water toetc by contractor |
| 13 | Equipments Tag1P25-CC-3127, C3 Splitter #11P25-CC-3128, C3 Splitter #2 |
| 14 | Installation of Rotary equipments like pumps,agitators etc. For detailed work Itemdescription refer (Item no 1.6 section 1 ofAnnexure-I) |
| 15 | Erection of equipments |
| 16 | Installation of Package equipments like Air fin coolers, compressor, lube oil skid, PSA Unit, Refrigeration Unit, Caustic Washing Unit, Acid Gas Flare with supporting Str. and Chiller Package etc. For detailed work Itemdescription refer (Item no 1.7 section 1 ofAnnexure-I) |
| 17 | Erection of package majorly mounted on one or more skids with some assembly on the skid and interconnecting skids |
| 18 | Erection of equipments weights up to 50 Tons in single piece |
| 19 | Assembly and Erection of package equipment supplied in knocked down condition like compressors, refrigeration unit, turbines, aircoolers etc.weight of air cooler includes structural weight. (Item no 1.7 section 1 ofAnnexure-I) |
| 20 | Erection and sub assembly of equipment |
| 21 | Installation of EOT Cranes/Hoist/Chain Pulley Blocks For detailed work Itemdescription refer (Item no 1.8 section 1 ofAnnexure-I) |
| 22 | Chain Pulley blocks (alongwith geared trolley) Capacity up to 10 Tons |
| 23 | Chain Pulley blocks (alongwith geared trolley) Capacity above 10 Tons to 20 Tons |
| 24 | Chain Pulley blocks (alongwith geared trolley) Capacity above 20 Tons to 30 Tons |
| 25 | Installation of safety shower/ sample cooler/ sample bombFor detailed work Itemdescription refer (Item no 1.9 section 1 ofAnnexure-I) |
| 26 | Safety shower |
| 27 | Sample Cooler/Sample Bomb |
| 28 | Installation of Steam supply and condensate manifolds at various locations and elevations. |
| 29 | Site hydrotesting of heat exchangersFor detailed work Itemdescription refer (Item no 1.10 section 1 ofAnnexure-I) |
| 30 | Hydro testing of heat exchanger (Shell side & Tube side) |
| 31 | Supply and application of grouting materialfor Static/Rotary/Package equipments For detailed work Itemdescription refer (Item no 1.11 section 1 ofAnnexure-I) |
| 32 | Type : non shrink cementetious GP2 |
| 33 | Type: M 40 Concrete (cement:sand: grit-1:1:1) |
| 34 | Type : Epoxy grout |
| 35 | Installation of all types of equipment internalsas per the Technical Specification andinstruction of Engineer-In-ChargeFor detailed work Itemdescription refer (Item no 1.12 section 1 ofAnnexure-I) |
| 36 | Trays,Demisters,down commer pipe,supportsetc |
| 37 | Installation of all types of equipment packings as per vendor/ licensors/ Technical Specification and instruction of Engineer-In-Charge For detailed work Itemdescription refer (Item no 1.14 section 1 ofAnnexure-I) |
| 38 | Packings |
| 39 | Sanfilling of burried vessels |
| 40 | Filling in excavations, pits, trenches, with selected river sand laid in layers of 200mm, compacted thicknessby mechanical means, including compact to 95% modified proctor density OMC, watering etc. all as per technical specifications (Qtuantities for backfilling to be worked out by deducting volume of concrete from authorized excavation quantity. |
| 41 | SECTION 2 |
| 42 | ABOVE GROUND PIPING WORKS (PIP) |
| 43 | Fabrication and Installation of A/G piping works.For detailed work Itemdescription refer (Item no PIP.2.1 section 2 ofAnnexure-I) |
| 44 | Carbon steel pipe Non IBR - All grade and specifications including (NACE,H2services,Amine, caustic, HIC etc) For detailed work Itemdescription refer (Item no PIP.2.1.1 section 2 ofAnnexure-I) |
| 45 | Shop / Field Welding |
| 46 | Socket weld-All Thickness |
| 47 | Butt weld (SB)-All Thickness |
| 48 | Butt weld-Up to 10 mm |
| 49 | Butt weld-above 10 up to 20 |
| 50 | Erection, Alignment, Supporting, Flushing, Pressure Testing, Drying etc, |
| 51 | All thickness |
| 52 | Carbon steel pipe IBR - All grade and specifications For detailed work Itemdescription refer (Item no PIP.2.1.2 section 2 ofAnnexure-I) |
| 53 | Shop / Field Welding |
| 54 | Socket weld-All Thickness |
| 55 | Butt weld (SB)-All Thickness |
| 56 | Butt weld-Up to 10 mm |
| 57 | Butt weld-above 10 up to 20 |
| 58 | Erection, Alignment, Supporting, Flushing, Pressure Testing, Drying etc, |
| 59 | All thickness |
| 60 | Carbon steel pipe - GalvanizedFor detailed work Itemdescription refer (Item no PIP.2.1.3 section 2 ofAnnexure-I) |
| 61 | Shop / Field Welding |
| 62 | Threaded (SB)-All Thickness |
| 63 | Butt weld-Up to 10 mm |
| 64 | Erection, Alignment, Supporting, Flushing, Pressure Testing, Drying etc, |
| 65 | All thickness |
| 66 | LTCS pipe - All grade and specifications including (NACE,H2 services, Caustic+Amine)For detailed work Itemdescription refer (Item no PIP.2.1.4 section 2 ofAnnexure-I) |
| 67 | Shop / Field Welding |
| 68 | Socket weld-All Thickness |
| 69 | Butt weld-Up to 10 mm |
| 70 | Erection, Alignment, Supporting, Flushing, Pressure Testing, Drying etc, |
| 71 | All thickness |
| 72 | Stainless steel /Inconnel steel pipe Non IBR- All grade ( SS 304, SS304L,SS DUAL)and specifications including (NACE,H2 services)For detailed work Itemdescription refer (Item no PIP.2.1.7 section 2 ofAnnexure-I) |
| 73 | Shop / Field Welding |
| 74 | Socket weld-All Thickness |
| 75 | Butt weld (SB)-All Thickness |
| 76 | Butt weld-Up to 10 mm |
| 77 | Erection, Alignment, Supporting, Flushing, Pressure Testing, Drying etc, |
| 78 | All thickness |
| 79 | ERECTION OF VALVES |
| 80 | Erection of Flanged /welded valves/strainers/bellows (Except TSV/PSV & Control Valve). For detailed work Itemdescription refer (Item no PIP.2.3.1 section 2 ofAnnexure-I) (Installation of valves for sizes 1.5\" and below shall be included in the installation of piping and shall not be considered for separate payement.Only valves 2 inch and above 2 inch shall qualify for measurement ) |
| 81 | All all sizes and for all pound ratings. |
| 82 | Erection of Flanged /welded/SandwichedPressure Safery valves/ Temperature Safety Valve of all ratings, all sizes. For detailed work Itemdescription refer (Item no PIP.2.3.2 section 2 ofAnnexure-I) |
| 83 | All all sizes and for all pound ratings.(For clalculating the inch dia, 2 timesinlet size will be considered) |
| 84 | Erection of Flanged /welded/SandwichedControl valves of all ratings with actuators and volume bottles For detailed work Itemdescription refer (Item no PIP.2.3.3 section 2 ofAnnexure-I) (Installation of valves for sizes 1.5\"\" and below shall be included in the installation of piping and shall not be considered for separate payement.Only valves 2 inch and above 2 inch shall qualify for measurement ) |
| 85 | All all sizes and for all pound ratings. |
| 86 | SECTION 3 |
| 87 | NON DESTRUCTIVE TEST (NDT) |
| 88 | Carry out non destructive testing and Post weld heat tretement work as per specification and instruction of engineer in chargeFor detailed work Itemdescription refer (Item no NDT.3.1 section 3 ofAnnexure-I) |
| 89 | Radiography test |
| 90 | Carrying out Radiography Test -Thickness (By -X-ray or gamma ray or Selinium 75)for sizes up to 2\" by eliptical shot |
| 91 | Carrying out Radiography Test -By -Gamma Ray for sizes above 2\" |
| 92 | Carrying out Radiography Test -By -SELINIUM 75 Source advanced technique (SAFE RAD) for sizes above 2\" |
| 93 | Ultrasonic test |
| 94 | Carrying out ultrasonic Test - All thickness |
| 95 | Dye penetrant test / Magnetic particle testing |
| 96 | Carrying out DP T / MPT Test - All thickness |
| 97 | Post weld heat tretement (PWHT) |
| 98 | Carrying out Post Weld Heat Treatment(PWHT) including hardness test |
| 99 | Carrying out PMI check (For work Itemdescription refer Annexure-I) |
| 100 | PMI check of raw material / welding joint( 3 spots / joint) |
| 101 | SECTION 5 |
| 102 | STEAM TRACING WORK (STW) |
| 103 | Fabrication,Erection, alignment, supporting, welding ofSteam Tracing of Pipe Lines installation of supply & return manifolds as per drawings andspecification,For detailed work Itemdescription refer (Item no STW.5.1 section 5 ofAnnexure-I) |
| 104 | Carbon steel Size - 0.5\" Nominal Dia |
| 105 | SECTION 6 |
| 106 | PIPE SUPPORT WORKS (PSW) |
| 107 | Supply, Fabrication, Erection,blast cleaning, Painting of carbon steel/Stainless steel secondary /special Pipe Supports as per Technical Spcs. & as per Engineer Incharge. For detailed work Itemdescription refer (Item no PSW.6.1 section 6 ofAnnexure-I, for painting please refer section 7 of annexure I) |
| 108 | Supply, Fabrication,Erection,alignment,welding,site adjustment,bolting, of Carbon Steel secondary supports /special supports |
| 109 | Supply, Fabrication,Erection,alignment,welding,site adjustment,bolting, of Alloy Steel secondary supports /special supports |
| 110 | Fabrication, surface prepration, painting and fixing, of Trunnion Support/ Dummy Pipe on pipe as per specification. For detailed work item description refer (Item no PSW.6.2 section 6 of Annexure-I) |
| 111 | Carbon Steel Trunnion Support on pipe as per specification. |
| 112 | Supply Graphite Sheet of thickness 10 mm & installing as per support specificatiion |
| 113 | Supply Teflon sheet of thickness 10 mm & installing as per support specificatiion |
| 114 | Supply & installation of Calcium silicate plates for high temperature line used as isolators.- thickness 25 mm as per drawings. |
| 115 | Erection, Alignment and Load setting of Spring Supports. For detailed work item description refer (Item no PSW.6.3 section 6 of Annexure-I) |
| 116 | Installation of Davit Arm |
| 117 | Erection of davitsof various capacities at variouslocations and elevations on the structural platforms / pipe racks by weldingor bolting forlifting / loweringvalve/safety valves etc by providing tools, tackles, crane,machinary , scaffloding at various locations / elevations, consumeblesetc andnecessory skilled , unskilled manpower, safety , supervision etc. The workshall becarriedout as perthe specifications, drawings & instructions ofEngineer -in- Charge. |
| 118 | SECTION 7 |
| 119 | SURFACE PREPARATION & PAINTING WORKS (SPP) |
| 120 | Surface preparation and painting works on external surface of Equipment/Piping/valves/Pipe supports including Arrow marking and colour band etc. For detailed work Itemdescription refer (Item no SPP.7.1 section 7 ofAnnexure-I) |
| 121 | Supply and application of painting on external surface of CS, LTCS, AS piping / equipmentincluding primary pipe supports,arrow marking and colour band asper paint system. For detailed work Itemdescription refer (Item no SPP.7.1.2 section 7 ofAnnexure-I)painting system CS2 - temp. -14 to 100 dec. |
| 122 | All AG Piping |
| 123 | Touchup painting of piping spools, Equipment like vessels,exchangers etc |
| 124 | Supply and application of painting external surface of CS, LTCS, AS piping / Equipmentincluding primary pipe supports arrow marking and colour band asper paint system. For detailed work Itemdescription refer (Item no SPP.7.1.3 section 7 ofAnnexure-I)painting system CS3 - temp. 101 to 400 de. |
| 125 | All AG Piping |
| 126 | Touchup painting of piping spools, Equipment like vessels,exchangers etc |
| 127 | Supply and application of painting on external surface of CS, LTCS & LAS piping/ Equipment including primary pipe supports ,arrow marking and colour band asper paint system.For detailed work Itemdescription refer (Item no SPP.7.1.5 section 7 ofAnnexure-I)painting system CS5 - temp. -45 to 200 dec. |
| 128 | All AG Piping |
| 129 | Touchup painting of piping spools, Equipment like vessels,exchangers etc |
| 130 | Supply and application of painting on external surface of CS, LTCS & LAS pipingincluding primary pipe supports,arrow marking and colour band asper paint systemFor detailed work Itemdescription refer (Item no SPP.7.1.6 section 7 ofAnnexure-I) painting system CS6 - trmp. 201 to 540 dec |
| 131 | All AG Piping |
| 132 | Touchup painting of piping spools, Equipment like vessels,exchangers etc |
| 133 | Surface prepration by blast cleaning, Supply and application of painting on external surface of CS undergroundpiping ncluding primary supports , arrow marking, banding, lettering and stenciling asper paint coating system. For detailed work Itemdescription refer (Item no SPP.7.1.9 section 7 ofAnnexure-I) painting system CB1temp. 25 to 65 dec. |
| 134 | All UG Piping |
| 135 | Surface prepration by blast cleaning, Supply and application of painting on external surface of CS under ground pipingincluding primary supports , arrow marking, banding, lettering and stenciling asper paint coating systemFor detailed work Itemdescription refer (Item no SPP.7.1.10 section 7 ofAnnexure-I) painting system CB2- temp. 66 to 150 dec. |
| 136 | All UG Piping |
| 137 | Surface prepration by blast cleaning, Supply and application of painting on external surface of CS Under ground pipingincluding primary supports , arrow marking, banding, lettering and stenciling asper paint coating systemFor detailed work Itemdescription refer (Item no SPP.7.1.10 section 7 ofAnnexure-I) painting system CB3- temp. 151 to 400 dec. |
| 138 | All UG Piping |
| 139 | Surface prepration by blast cleaning, Supply and application of painting on external surface of carbon steel GIpiping /Equipment /un insulated tanks including primary supports , arrow marking, banding, lettering and stenciling asper paint coating system CG1For detailed work Itemdescription refer (Item no SPP.7.1.12 section 7 ofAnnexure-I) |
| 140 | All AG Piping |
| 141 | Identification lettering |
| 142 | Letter size - 25 mm |
| 143 | Letter size - 32 mm |
| 144 | Letter size - 50 mm |
| 145 | Letter size - 100 mm |
| 146 | Letter size - 150 mm |
| 147 | SECTION 8 |
| 148 | STRUCTURAL WORKS (STR) |
| 149 | Supply, fabrication including machining of surface if any.For detailed work Itemdescription refer (Item no STR.8.1 section 8 ofAnnexure-I) |
| 150 | Supply, fabrication including machining of surface if any.For detailed work Itemdescription refer (Item no STR.8.1A section 8 ofAnnexure-I) for Builtup sections. |
| 151 | Supply, fabrication including machining of surface if any .For detailed work Itemdescription refer (Item no STR.8.1B section 8 ofAnnexure-I) for Semi Builtup sections. |
| 152 | Surface preparation and painting for steel structure |
| 153 | Surface preparation, providingand application of two coats (primer and finish coat)of FP-3A (Aromatic amine cured epoxy resin medium suitably pigmented) each coat of 100 micron. For detailed work Itemdescription refer (Item no STR.8.2.1 section 8 ofAnnexure-I) |
| 154 | Surface preparation, providing and application of SSPC-SP-10 Inorganic Zinc Silicate (FP-6), 1 coat, 75 µm, Epoxy High build (FP-3A), 1 coat, 170 µm Acrylic Polyurethane (FP-1), 1 coat, 40 µm, Total DFT at shop = 285 µm on all steel surfaces.For detailed work Itemdescription refer (Item no STR.8.2.2 section 8 ofAnnexure-I) |
| 155 | Surface preparation, providing and application of painting on ladders. For detailed work Itemdescription refer (Item no STR.8.2.3 section 8 ofAnnexure-I) |
| 156 | Surface preparation, Providing and applyingPainting on Handrails. For detailed work Itemdescription refer (Item no STR.8.2.4 section 8 ofAnnexure-I) |
| 157 | Blast cleaning as per standard SSPC-SP-10 including all tools and tackles, compressor, etc.all as per technical specifications (Item no STR.8..2 section 8 ofAnnexure-I) |
| 158 | Erection of prefabricated structural steel .For detailed work Itemdescription refer (Item no STR.8.4 section 8 ofAnnexure-I) |
| 159 | Supply, fabrication , erection of electroforged galvanised grating 25 mm Thk ( Weight approx. 35 kg/m2).For detailed work Itemdescription refer (Item no STR.8.5.0 section 8 ofAnnexure-I) |
| 160 | Supplying,storing,fabricating,delivering to site structural steel of Grade E250BR conforming to IS: 2062for MS Electroforged gratings tread with nosing plate with hot dip galvanizing (120 micron) |
| 161 | Supply, fabrication and Erection of hand rails on equipment platforms,technological structures etc.as per specification and drawings For detailed work Itemdescription refer (Item no STR.8.6 section 8 ofAnnexure-I) |
| 162 | Erection of for MS galvanised grating tread for staircase at all elevations as per specification and drawings For detailed work Itemdescription refer (Item no STR.8.7 section 8 ofAnnexure-I) |
| 163 | Supplying,storing,fabricating,delivering, erection of structural steel of Grade E250BR conforming to IS: 2062for6/7 mm Thk Chequered Plates including hot dip galvanising (120 micron) at all heights and levels as per drawingincludingtools, tackles,cutting, welding, consumables, etc for all types of structures in buildings, pipe racks, platforms, sheds, towers ,ladders etc , all complete as per technical specifications. |
| 164 | Supplying,storing,fabricating,delivering, erection of structural steel of Grade E250BR conforming to IS: 2062for8/9 mm Thk Chequered Plates including hot dip galvanising (120 micron) as per standard drawing no. TK-1ZZZA-CV-STD-0005 at all heights and levels as per drawingincludingtools, tackles,cutting, welding, consumables, etc for all types of structures in buildings, pipe racks, platforms, sheds, towers ,ladders etc , all complete as per technical specifications. |
| 165 | SECTION 11 |
| 166 | MODIFICATION WORKS (MIS) |
| 167 | Modification of existing steel structures, platforms, ladders, gratings,etc. as per instruction of engineer in charge. For detailed work Itemdescription refer (Item no MIS.11.1 section 11 ofAnnexure-I) |
| 168 | Modification of Piping/additional works :-Fabrication ofmodified pipe spools/in situ modification by cutting grinding,cold bending,edge preparation,fit up welding, supporting, punch listing,dilution of punch list, flushing, testing,drying,final documentation etc. For detailed work Itemdescription refer (Item no MIS.11.2 section 11 ofAnnexure-I) |
| 169 | Carbon Steel Piping-All grades(Non IBR) |
| 170 | Cutting (Up to Pipe thickness 20 mm) |
| 171 | Grinding/Edge prpeparation/Bevelling/Fit Up/Welding (Up to Pipe thickness 20 mm) |
| 172 | Erection/Supporting/punch listing/dilution of punch list (All thickness) |
| 173 | Hydrotesting/Flushing/Reinstatement/documentation (All thickness) |
| 174 | Carbon Steel Piping-All grades( IBR) |
| 175 | Cutting (Up to Pipe thickness 20 mm) |
| 176 | Grinding/Edge prpeparation/Bevelling/Fit Up/Welding (Up to Pipe thickness 20 mm) |
| 177 | Erection/Supporting/punch listing/dilution of punch list (All thickness) |
| 178 | Hydrotesting/Flushing/Reinstatement/documentation (All thickness) |
| 179 | LTCS Steel Piping- All grades (NIBR) |
| 180 | Cutting (Up to Pipe thickness 20 mm) |
| 181 | Grinding/Edge prpeparation/Bevelling/Fit Up/Welding (Up to Pipe thickness 20 mm) |
| 182 | Erection/Supporting/punch listing/dilution of punch list (All thickness) |
| 183 | Hydrotesting/Flushing/Reinstatement/documentation (All thickness) |
| 184 | Stainless Steel All Grades (NIBR) |
| 185 | Cutting (Up to Pipe thickness 20 mm) |
| 186 | Grinding/Edge prpeparation/Bevelling/Fit Up/Welding (Up to Pipe thickness 20 mm) |
| 187 | Erection/Supporting/punch listing/dilution of punch list (All thickness) |
| 188 | Hydrotesting/Flushing/Reinstatement/documentation (All thickness) |
| 189 | Fabricationand installation of ReinforcementPads for pipe connections where ever required from pipe supplied as FIM. Cutting, erection, fit up, welding, providing tale hole and leak test testing ( including DPT, MPT, pneumatic testing), if required performing PMI of the sameby using alloy analysers as per specification, drawings, instructions from EIC. Note :ReinforcementPads are for branch pipe connections |
| 190 | Reimforcement Pad for branch size : Carbon steel piping including - CS, CS IBR, CS H2, CS NACE, CVS INT COATED ,CSNACE+AMINE etc |
| 191 | 2.0 INCH NB |
| 192 | 3.0 INCH NB |
| 193 | 4.0 INCH NB |
| 194 | 6.0 INCH NB |
| 195 | 8.0 INCH NB |
| 196 | 10.0 INCH NB |
| 197 | 12.0 INCH NB |
| 198 | 14.0 INCH NB |
| 199 | 28.0 INCH NB |
| 200 | Reimforcement Pad for branch size : LTCS piping |
| 201 | 2.0 INCH NB |
| 202 | 3.0 INCH NB |
| 203 | 4.0 INCH NB |
| 204 | 6.0 INCH NB |
| 205 | 8.0 INCH NB |
| 206 | 10.0 INCH NB |
| 207 | 12.0 INCH NB |
| 208 | 14.0 INCH NB |
| 209 | 16.0 INCH NB |
| 210 | 18.0 INCH NB |
| 211 | 24.0 INCH NB |
| 212 | 28.0 INCH NB |
| 213 | Bolt Tensioning: |
| 214 | Carrying out tensioning of bolted joints on all types of piping as called for in Specification no TP-1ZZZA-PI-SPE-0005_D1 on already erected systemincluding supply of all materials, recording devices, instruments etc; Providingall normal andspecial equipment and gadgets, skilled / un skilled labour, pecialist,supervisory staffand completing the work in all respects as per specifications andinstructions ofengineer-in-charge. some joints may require bolt tensioning more thanonce, but,payment for one joint shall be made only once. - |
| 215 | 150# joints |
| 216 | NB 14.000 INCHES |
| 217 | NB 16.000 INCHES |
| 218 | NB 18.000 INCHES |
| 219 | NB 20.000 INCHES |
| 220 | NB 24.000 INCHES |
| 221 | NB 28.000 INCHES |
| 222 | NB 30.000 INCHES |
| 223 | NB 32.000 INCHES |
| 224 | NB 36.000 INCHES |
| 225 | NB 42.000 INCHES |
| 226 | 300# joints |
| 227 | NB 10.000 INCHES |
| 228 | NB 12.000 INCHES |
| 229 | NB 14.000 INCHES |
| 230 | NB 16.000 INCHES |
| 231 | NB 18.000 INCHES |
| 232 | NB 20.000 INCHES |
| 233 | NB 24.000 INCHES |
| 234 | NB 28.000 INCHES |
| 235 | NB 30.000 INCHES |
| 236 | NB 36.000 INCHES |
| 237 | NB 42.000 INCHES |
| 238 | 600# JOINTS |
| 239 | NB 6.000 INCHES |
| 240 | NB 8.000 INCHES |
| 241 | NB 10.000 INCHES |
| 242 | NB 12.000 INCHES |
| 243 | installation of Piping Special parts |
| 244 | Supply anderection of SS 316 L wire mesh for bird protectionscreen on pipe as per specification |
| 245 | Installation of splash guard on flanges |
| 246 | Installation of OWS FUNNEL STRAINER as per specification |
| 247 | supply and installation of site fabricated extended valve stem as per drawing |
| 248 | BENDING OF PIPES FOR PREPARATION OF RINGS : |
| 249 | The job includes bending of pipes in the required curvature and preparation of rings by supplying of all tools, tackles, labour and supervision to complete the job as per instructions and to the full satisfactionof the Engineer-in-Charge. This item will be operated as per instruction ofEngineer-in-Charge. |
| 250 | 0.5 inch |
| 251 | 0.75 inch |
| 252 | 1 Inch |
| 253 | 1.5 inch |
| 254 | 2 inch |
| 255 | SECTION 12 |
| 256 | LABOUR RATES (MIS) |
| 257 | Providing skilled/unskilled manpower with all the tools & tackles, consumables, brooms, dial indicators, laser alignment instruments, supervision, safety, PPEs etc. for carrying out pre commissioning/ commissioning activities and completing the work as per the instruction and complete satisfaction of the Owner\"s/engineer In charge.For detailed work Itemdescription refer (Item no MIS.12.1 section 12 ofAnnexure-I) in two shifts( each shift of 12 hrs) |
| 258 | Pipe fitter |
| 259 | Mill wright fitter |
| 260 | ARC welder |
| 261 | TIG welder |
| 262 | Helper |
| 263 | Rigger |
| 264 | Gas cutter |
| 265 | Grinder |
| 266 | Electrician |
| 267 | Painter |
| 268 | Structural Fitter |
| 269 | Structural Welder |
| 270 | Tack Welder |
| 271 | Job Supervisor |
| 272 | SECTION 13 |
| 273 | ANCHOR FASTENERS WORKS (HILTI or other equivalent as approved by Engineer in Charge) |
| 274 | Supply,drilling and fixing of mechanical /Chemical expansion anchor fastener of required size and length as per the Instruction of Engineer in-Charge For detailed work Itemdescription refer (Item no MIS.13.1 section 13 ofAnnexure-I) |
| 275 | Chemical Anchor Fasteners-Supply & Fixing |
| 276 | M12 X 150 mm |
| 277 | M16 X 150 mm |
| 278 | M20 X 150 mm |
| 279 | M12 X 180 mm |
| 280 | M25 X 200 mm |
| 281 | Mechanical Anchor Fasteners-Supply & Fixing |
| 282 | M8 X 95 mm |
| 283 | M10 X 100 mm |
| 284 | M12 X 120 mm |
| 285 | M16 X 150 mm |
| 286 | M20 X 180 mm |
| 287 | M25 X 200 mm |
| 288 | SECTION 14 |
| 289 | SCAFFOLDING WORKS |
| 290 | Providing and installating independent steel scaffoldings at various locations and elevations and making working platforms & approach ladder as per the projectsafety specifications and as per IS 2750-1964to use as optional item as per requirement of the plant. For detailed work Itemdescription refer (Item no 14.1 section 14 ofAnnexure-I) This Item is optional item to be operated only upon instructions of EIC at all levels. |
| 291 | Grade slab to &up to 8 meters |
| 292 | From above 8 meters to & up to 12 meters |
| 293 | From above 12 meters to & up to 24 meter |
| 294 | From 24 meters & above |
| 295 | SECTION 15 |
| 296 | HIRING OF EQUIPMENT/MACHINERY (MIS) |
| 297 | Mobilization of Multiaxiel hydrolic trailer of capacity of 400Mt with Primemover along with operator, helper, mechanic, fuel, consumables, tools & tackles and spare parts etc as per instructions of engineer in charge. Quoted rates includes mobilization, demobilization, certification as oper requirement from approving authorities ( shift hours = 12 hours working) monthly days = calender days. Sunday and holiday working will be on prorata basis. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail