|
| 1 | DG set 125KVA (Sarai Kale Khan No 2, Sarai Kale Khan RUB and Delhi Sectt.)Providing of Hose for Thermostat to Water Tank (FG.255.06.0.00) for KG 125 WS-3 125 KVA |
| 2 | Providing of Hose (F6.377.08.0.00) for KG 125 WS 3 125 KVA |
| 3 | Providing of Hose (F6.150.03.0.00) for KG 125 WS-3 125 KVA |
| 4 | Providing of Hose Clip (30.650.02.0.00) for KG 125 WS-3 125 KVA |
| 5 | Providing of Hose T-Bolt Clamp (4H.1412.24.0.00) for KG 125 WS-3 125 KVA |
| 6 | Providing of Fuel Pipe Inlet: M14 x M14 Banjo Both side 900L (4H.896.09.0.00) for KG 125 WS-3 125 KVA |
| 7 | Providing of Fuel Pipe Inlet: M14 x 1.5 Banjo Both side 650mm (06.718.11.0.00) for KG 125 WS-3 125 KVA |
| 8 | Providing of Primary Element (3H.132.01.0.00) for KG 125 WS-3 125 KVA |
| 9 | Providing of Secondary Element (3H.132.02.0.00) for KG 125 WS-3 125 KVA |
| 10 | Providing of Spin on Lube Oil Filter (06.436.01.0.00) for KG 125 WS-3 125 KVA |
| 11 | Providing of 16 \" Air Cleaner Element {F6.729.03.0.00) for KG 125 WS-3 125 KVA |
| 12 | Providing of Safety Air Element (F6.729.04.0.00) for KG 125 WS-3 125 KVA |
| 13 | Providing of Assembly Leak Off Pipe (F6.304.01.0.00) for KG 125 WS-3 125 KVA |
| 14 | Providing of LFL Sensor (Low Fuel Level) 165mm Height (GH.192.14.0.00) for KG 125 WS-3 125 KVA |
| 15 | Providing of Lugs Battery Cable (LPU.ELE.08.0.00) for KG 125 WS-3 125 KVA |
| 16 | Providing of Conversion Kit from KG 934 to KG 645 for KG 125 WS-3 125 KVA |
| 17 | Providing of Kirloskar care Premium Oil 20 ltr can (82.060.10.0.20) for KG 125 WS-3 125 KVA |
| 18 | Providing of Kirloskar care Premium Oil 5 ltr can (82.060.10.0.05) for KG 125 WS-3 125 KVA |
| 19 | Providing of Kirloskar care Coolant Premix 10 ltr can {82.020.35.1.10) for KG 125 WS-3 125 KVA |
| 20 | Providing of Lugs Battery cable (LPU.ELE.08.0.00) for Kirloskar Make KG 125 WS-3 125 KVA |
| 21 | Labour Charges (99.0PW.01.0.00) for servicing of DG set |
| 22 | Complete washing/cleaning inside out side of DG set |
| 23 | Supply of lead acid batteries for DG set/ diesel engine pump set, XP 1500 fully charged 12 Volts 150 AH |
| 24 | DG set 82.5 KVA (New Friends Colony)Providing of Primary Element (3H.132.01.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 25 | Providing of Secondary Element (3H.132.02.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 26 | Providing of Spin on Lube Oil Filter (06.436.01.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 27 | Providing of Kirloskar care Premium Oil 13 ltr can (82.060.10.0.13) for Kirloskar Make 82.5 KVA Capacity |
| 28 | Providing of Kirloskar care Coolant Premix 5 ltr can (82.020.35.1.05) for Kirloskar Make 82.5 KVA Capacity |
| 29 | Providing of Primary Element for KFA-01-7221 (6H.411.02.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 30 | Providing of Fuel Pipe- Pump to Filter (475 Hose Length) (4H.1266.01.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 31 | Providing of Fuel Pipe- Filter to Fip (4H.1266.02.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 32 | Providing of Fuel Pipe Inlet: M14 x 1.5 Banjo Both side 650mm (06.718.11.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 33 | Providing to Fuel Pipe Inlet: M14 x M 14 Banjo Both side 900L (4H.896.09.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 34 | Providing of Conversion Kit from KG 934 to KG 645 for Kirloskar Make 82.5 KVA capacity |
| 35 | Providing of battery terminal (LPU.ELE.41.0.00) for Kirloskar Make 82.5 KVA capacity |
| 36 | Providing of Lugs Battery cable (LPU.ELE.08.0.00) for Kirloskar Make 82.5 KVA Capacity |
| 37 | Labour Charges (99.0PW.01.0.00) for servicing of DG set |
| 38 | Complete washing/cleaning inside out of DG set |
| 39 | To & Fro Charges up to workshop for DG set |
| 40 | Supply of lead acid batteries for DG set/ diesel engine pump set, XP 1300 fully charged 12 Volts 130 AH |