Tender For Increasing Capacity Of Transformer And Other Work In Business Plan Under Edd-Iv, Syana, 1 Carriage Of Fallowings From Esc Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Required Ccompletion Of Work, bulandshahr-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Increasing Capacity Of Transformer And Other Work In Business Plan Under Edd-Iv, Syana, 1 Carriage Of Fallowings From Esc Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Required Ccompletion Of Work. Submission Date for this Tender is 22-06-2024. Electrification Work Tenders in bulandshahr Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43721710
Tender For Increasing Capacity Of Transformer And Other Work In Business Plan Under Edd-Iv, Syana, 1 Carriage Of Fallowings From Esc Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Required Ccompletion Of Work
Tender
Indian
Uttar Pradesh
Bulandshahr
22-06-2024

Tender Details

Tender For Increasing Capacity Of Transformer And Other Work In Business Plan Under Edd-Iv, Syana, 1 Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx. 2 STP Pole 13 Mtr Long 3 PCC Pole 11 Mtr Long 4 Pcc Pole 8.5 Mtr Long 5 Carriage of ACSR Weasal/Dog Conductor, AB Cable, LT XLPE Cable, G.I. Wire, 11 KV XLPE Cable, 33 KV Disc Insulator with fitting & 11 KV Disc insulator with fitting, 33 Pin Insulator with pin & 11 KV pin insulator with pin, 33 KV V-Type X-arm & 11 KV V-Type Cross Arm, M.S. Channel-Angle, Earthing Rod, Stay Set Complete & Etc as per RESPO Norms. 6 25 KVA Transformer 7 63 KVA Transformer 8 100 KVA Transformer 9 250 KVA Transformer 10 10 KVA Single Phase TF 11 The following meterial Erection & Fixing as per RESPO manual. It including the cost of labour, T&P, Carrier etc. required for proper completion of work. 12 Single support on PCC pole 8.5 Mtr. Long with all accessories. 13 Single support on STP Pole 13/PCC 11 Mtr Long with all accessories 14 Making of D/P for T/F on PCC pole 8.5 Mtr. Long. 15 Grouting concreting & Plinthing of STP/Pcc Pole as per RESPO norms. 16 Fixing erection & grouting of Stay set complete with binding & Nozzling of Stay wire. 17 Earthing of supports with the help of Earthing rod & GI wire/Earth wire. 18 Laying stringing & sagging of Dog conductor in 3 phase 19 Laying stringing & sagging of Rabbit conductor in 3 phase 20 Laying stringing & sagging of Weasal conductor in 3 phase 21 Laying stringing & sagging of 11 KV 3x120 sq mm XLPE Cable 22 Laying stringing & sagging of LT XLPE Cable 3.5x240 sq mm 23 Laying stringing & sagging of AB Cable (3X50 + 1X35+1X16) sq.mm 24 Laying stringing & sagging of AB Cable (3X95 + 1X70+1X16) sq.mm 25 Laying stringing & sagging of AB Cable (3X120+1X95+1X16) sq. mm 26 Installation of 25 KVA Transformer 27 Installation of 63 KVA Transformer 28 Installation of 100 KVA Transformer 29 Installation of 250 KVA Transformer 30 Installation of 10 KVA Single Phase TF 31 Making of Plinth of 250 KVA Transformer. 32 Earthing of 250 KVA T/F water level 33 Fencing of 250 KVA T/F 34 Laying stringing & sagging of G.I. Wire 3.15 mm 10 SWG 35 Laying stringing & sagging of G.I. Wire 4 mm 6 SWG 36 Fixing of Gurding M.S. Angle 65x65x6mm)/1.6 meter 37 Installation of Distribution Box 38 Grouting of Pole 39 Providing & Fixing of the following material by the Contractor as per UPPCL/RESPO Rules. 40 Gurding M.S. Angle 65x65x6mm)/1.6 meter 41 Distribution Box 42 MS Channel (Dropper) 100x50x2028 43 MS Angle 75x75x6x2028 mm 44 M.S. Top Channel (125x65x2240 mm) 45 MS T-off Channel 125x65x1300 mm 46 F-Clamp 47 11 KV Cross Arm Holding Clamp 48 33 KV Cross arm Holding clamp 49 Danger Board with Clamp 50 Stone Pad 51 Clamps for D.B. (40x6 mm) 52 Clamps for 10 KVA T/F (75x8 mm) 53 Clamp for D/P 54 Nut & Bolt 55 DEAD END CLAMPS WITH I-HOOK (INSULATED) 56 LT PIERCING CONNECTOR 57 SUSPENSION CLAMPS WITH I-HOOK (INSULATED) 58 Clamp for Gurding MS Angle 59 Earthing Rod 60 The fallowings matarial dismantalling & Carriage from site to ESC BSR including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx. 61 ACSR Weasal/Rabbit Conductor (Scrap) - 62 G.I. Wire (Scrap) - 63 XLPE/AB Cable (Scarap / Old And Damaged) 64 ST POLE 11 MTR LONG (Iron scrap) 65 1. Nut, Bolt, Clamps and others necessary items should be provided by contractor.2. T and P should be and other necessary machinery should be provided by contractor.3.All the MS Items must be Galvanized.All work will be done as per UPPCL/RESPO Rules and these work will be inspected by TPIA or any departmental authority.

Key Value

Document Fees
INR 3540 /-
EMD
INR 82000.0 /-
Tender Value
INR 82 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail