Tender For Restoration & Conservation Of Heritage Monuments At Mehrauli Archaeological Park. Sub Head: Conservation And Restoration Of Historical Sarai Complex, Haveli Complex, Guard Huts, Structure No 39 At Mehrauli Archaeological Park (Specialized Work)
Tender Overview
Project Description
Restoration & Conservation of Heritage monuments at Mehrauli archaeological park. Sub Head: Conservation and restoration of Historical Sarai complex, Haveli complex, Guard Huts, Structure No 39 at Mehrauli archaeological Park (Specialized work).)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Jun-2024 | Corrigendum | Date | 24-Jun-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing and fixing double scaffolding system (cup lock type) on theexterior side of building/structure, upto 25 metre height, above groundlevel, including additional rows of scaffolding in stepped manner as perrequirement of site, made with 40 mm dia M.S. tube, placed 1.5 metrecentre to centre, horizontal & vertical tubes joint with cup & lock systemwith M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system inthe scaffolding for working platform etc. and maintaining it in a serviceablecondition for execution of work of cleaning and/ or pointing and/ orapplying chemical and removing it thereafter. The scaffolding systemshall be stiffened with bracings, runners, connecting with the building etc,wherever required, if feasible, for inspection of work at required locationswith essential safety features for the workmen etc., complete as perdirections and approval of Engineer-in-charge.Note:- (1) The elevational area of the scaffolding shall be measured forpayment purpose. (2) The payment will be made once only for executionof all items for such works |
| 2 | Cutting and removal of rank vegetation & thickbushes very carefully to avoid anydamagetotheheritagestructureunderneath.Also cuttingandremoval lantanabushes andsaplings of girth up to 30 cm measured at a height of 1m above ground level alsoremovalofdeeprootsbyusingpickaxes, swords,crowbars,darati& khurpaetc.wherevernecessary and removal of rubbish up to a distance of 50 moutside the periphery of the area cleared. |
| 3 | Scientific excavation over areas (exceeding 30 cm in depth, 1.50m in width as well as 10 sqm on plan) upto 2.0m depth around heritage structure without damaging the burried architectural part of the building including screening collecting and depositing the usable objects/ articles at the specified place including getting out the excavated soil and disposal of the source in the authorised dumping ground as per direction of the Conservation Architect / Engineer-in-charge. |
| 4 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.(a) All kinds of soil |
| 5 | Chemical cleaning of inner Plaster surface to clean from yellowness, blackness, lime and gypsum deposits by using ammonia, teepol and other chemicals and applying of fungicides. |
| 6 | Chemical cleaning of stone surface to clean from yellowness, blackness, algae growth, dust, dirty oil accretions, lime and gypsum deposits, soot, graffiti, joining of gaps, taking out nails and other additions, removal of multiple layer of enamel pait/other paint/ geru layer , filling oh holes/ voids in marble /stone and application of preservatives coating ( pva -lavolin base ) to prevent superficial decay, under the strict supervision of archaeological chemist or art conservator. For Vertical and flat surfaces etc |
| 7 | Providing and applying antifungal wash treatment using 3% solution of sodium pentachlorophenate, of reputed brand and manufacturer, on cleaned stone surface at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding) |
| 8 | Consolidation of loose/ damaged stone masonry with hard stone in super structure above plinth upto five floor level including carefully dismantling of stone, cleaning of mortar and reconsolidating using old reusable stone and new stone both as per site condition and availability of old reusable stone for masonry with Lime Mortar 1:1:1 Lime putty: 1 Surkhi: 1 Coarse sand) (a)Considering 75% reusable old and 25% new stone |
| 9 | Consolidation of loose/ damaged stone masonry with hard stone in super structure above plinth upto five floor level including carefully dismantling of stone, cleaning of mortar and reconsolidating using old reusable stone and new stone both as per site condition and availability of old reusable stone for masonry with Lime Mortar 1:1:1 Lime putty: 1 Surkhi: 1 Coarse sand) (a)Considering 50% reusable old and 50% new stone |
| 10 | Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical/ manual means, including preparing and cleaning the surface for re-pointing/ refilling of joints, including disposal of rubbish to the dumping ground within 50 metre lead. |
| 11 | Lime grouting using ratio 1:1 lime and 1 sand/surkhi or as specified by Conservation Consultant /lime grout manufactured under stiff factory conditions (Mape-Antique I or equivalent make) for superior strength to fill all gaps/voids/air pockets visible from bottom of the slab to densify the slab and enhance the contact area within the slab. The lime grout shall be a cement free, fluid hydraulic binder in powder form which should form an injectable slurry made from lime, Eco-pozzolan, natural ultra-fine sand and special additives according to a formulation developed under factory conditions. When mixed with water in mixratio 100:35 (lime powder: water) in a suitable clean container, the lime grout forms a fluid, volumetrically stable injection slurry resistant to salts which is easy to inject with a manual or electronic pump or by gravity casting in structures with cracks, gaps or internal cavities. Once hardened, the properties of slurry made using lime grout, such as mechanical strength, modulus of elasticity and porosity, are very similar to slurry made using lime, lime-pozzolan or hydraulic lime originally used in the construction of old buildings. The lime slurry, shall also have properties which make the product resistant to various chemical-physical aggressive phenomena, such as the presence of soluble salts, freezethaw cycles and alkali-aggregate reactions. Apart from the above, the lime grout must have the following characteristic - Appearance - Powder, Colour - White, Maximum size of aggregate - 100, Bulk density (kg/m3) - 1100, Consistency of mixture - Superfluid, Bleeding - Absent Compressive strength after 28 days (N/mm2)-18 |
| 12 | Repointing of raked out joints of Random rubble masonry by using lime mortar 1:1:1 (1 Lime: 1 coarse sand: 1 Brick jeera) |
| 13 | Plinth Area Protection using Lime concretearound the building to prevent entry of water by dampness and capilary rise (Lime concrete 1:3:6 up to 100mm thick) |
| 14 | Stone flooring by using Selected Qurtzitestone .Stone250x200x150 thickwith filling the joints maximum 12mm uniformly wide with lime mortar 1:1:1 (1lime:1Surkhi:1coarsesand)includingpointingthejointsof.Stonefloorwith basiclimemortarmixwith40%brickzeeraAv.6mmnominalsizeandmixing with gur Belgiri. |
| 15 | Replasteringontheinteriororexteriorofthemonumentupto heightof15m above ground level in two coats with 1st coat 30mm thick mixed with1/3brick zeera 5 to 10 mm nominal size & 2nd coat 20mm thick in lime mortar 1:1:1 (1 Lime: 1 Surkhi: 1 Coarse sand) mixed with Gur/sheera & belgiri. |
| 16 | Stone consolidation-removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar (1:2) wherever necessary. Careful re-fixing of the removed Stone Masonry by using rich lime mortar (if necessary by providing M.S. flat cramps, raking of joints & pointing as per site condition & instructions/guidance of engineer- in-charge) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender