|
| 1 | Geo-Technical investigation, Design & drawing (Sub-structure part) & Construction of RCC Elevated Over Head Reservoir (Intze type) of capacity 700 cum of staging height 20 meter with pile foundation including pipe connection for head works, as per Departmental design, drawing & specification etc. Including supply of all materials as required complete in all respect of proposed Water Supply Scheme under AMRUT 2.0 atZone- VIin ward no. 17, atPanskura Municipality under Proposed Water Supply Scheme. |
| 2 | Geo-Technical investigation, Detailed Design and drawing & Construction ofPile foundation (Minimum Grade M25 including cost of reinforcement works as per approved drawing) with pile load test & integrity test as per specification & direction of EIC |
| 3 | Deatlied Design, drawing & Construction of Pile cap (Minimum Grade M25 including cost of reinforcement works as per approved drawing) as per specification & Direction of EIC |
| 4 | Construction & commissiongof Super structure of OHR.complete in all respectas per departmental drawing , specification & direction of EIC |
| 5 | Supplying& laying of HDPE (PE100),OPVC Pipe , D.I. (K-7) and MS pipes with all kinds of Specials and valvesincluding supplying ofspecials with earth work in excavation in trenches, shoring (if necessary) of adequate width having minimum depth to keep the top surface of pipe 1.10 mbelow of the existing ground level in any kind of soil mixed with boulder, metal crust, concrete pavement, any road sub-grade and its flank etc., dewatering the trenches, preparing the bottom surface of the trenches for continuous bedding including sand filling (if necessary)Over-Ground installation to cross small ditches etc. supported with RCC pillars and fitting, fixing, jointing (all types of joints) valves, specials etc. as per requirement, in position, cutting, chamfering of pipes as required, constructing sluice valve chambers including supply and fitting in position sluice valve of different dia. & supply and fitting in positionSpecials ,Thrust Blocks as per requirement, filling of the trenches with excavated materials, consolidating the same in layers, guarding trenches with temporary bamboo railing for safety where necessary, emergency horizontal auger boring (for roads other than NH and Railway) where necessary, removing the surplus materials from the site as per municipal rules in vogue including all labour charges, tools and plants, hydraulic pressure testing, complete in all respect as per IS 12288¬1987 (latest edition)and cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the samepipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfected pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor. (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source). and temporary Roads Restoration work should be made for vehicular movement as perinstruction of the E.I.C. N.B: i) Any deviation from required clear cover of 1.10mtr., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on pro rata basis over the rate of entire item (ii) No payment will be made without hydraulic test of the pipe line either part or full |
| 6 | 110 mm diaHDPE Pipe |
| 7 | 140 mm dia HDPE Pipe |
| 8 | 160 mm diaHDPE Pipe |
| 9 | 200 mm dia PVC -O Pipe |
| 10 | 250 mm dia PVC -O Pipe |
| 11 | 315mm dia PVC -O Pipe |
| 12 | 100 mm diaDI (K-7) Pipe |
| 13 | 450 mm diaDI (K-7) Pipe |
| 14 | 100 mm dia MS Pipe |
| 15 | Supplying fitting fixing of Sluice valves/Air Release Valves and including construction of Sluice Valve Chamber as per specification and drawing. |
| 16 | Sluice Valve 110 mm dia with valve chamber |
| 17 | Sluice Valve 140mm dia with valve chamber |
| 18 | Sluice Valve 160 mm dia withvalve chamber |
| 19 | Sluice Valve 200 mm dia withvalve chamber |
| 20 | Sluice Valve 250 mm dia with valve chamber |
| 21 | Sluice Valve 315 mm dia withvalve chamber |
| 22 | Sluice Valve 100 mm dia withvalve chamber |
| 23 | Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. (5 copies) |