| 1 | Clearing the scrub jungleand disposing the debristo suitable place away from the site as directed by the engineer at site including all labour charges, hire charges for vehicle, tools and plants required, leads & liftsetc., complete. |
| 2 | Removing the roots of jungle and other plants with uprooting,andstacking at one point near by carefullyusing JCB and disposing off as directed by the Engineer at site, including cost of labour charges, loading, unloadinglead, lift, hire charges of T&P’s,etc., Complete. |
| 3 | Removal of accumulated flyash silt etc.from the drain around H2 Plantunder water condition and depositing on bank with lead of 10M & lift of 2M and disposing away fom the site after drying up as directed by the Engineer at site using vechicle with a lead of 3Kms including labour charges, hire charges for T&P, loading, unloading, all leads, lifts, etc., complete. |
| 4 | Charges for removal of precast trench cover slabs in drain around H2 Plant andrelaying the precast trench coverslabs in portion after removal of silt/slush, etc.,as directed by the Engineer-in-charge. |
| 5 | Sweeping and cleaning ofroads around H2 Plant and disposal of debris to far away placeas directed by the Engineer at site, including labour charges & cost of all materials such as brooms, dust bin, lead & lift, etc., complete. |
| 6 | Providing and placing of RCC1:1½:3 using 20 mm HBG metal for concrete floor in the cylinder loading point area as directed by the Engineer at site, including cost of all materials, labours, lead, lift, centering & shuttering, curing, etc, complete. but excluding cost of reinforcement. |
| 7 | Providing and placing in position of RCC1:1½:3 using 20mm HBG metal for Precast slab for replacing damaged Drainage covers as directed by the Engineer at site, including cost of all materials, labours, lead, lift, shuttering, curing, etc.,complete. but excluding cost of reinforcement. |
| 8 | Providing steel reinforcement for all RCC works including cutting, bending, binding, typing and placing in position including cost of steel, binding wire, lead, lift, etc., complete as directed by the Engineer in charge at site. |
| 9 | Supply and fixing in position of PVC water tank ofcapacity 1000 litre, of approved make in toilets near PTP motor room & Time office including cost oftransporting, lifting and fixing, cost of all materials, labour charges including fixing, lead, lift, etc., complete. |
| 10 | Supplying and laying in position of 25mm dia GI pipe line of medium class (B class) of approved make in toilets near PTP motor room & Time office as directed by the Engineer in charge for water supplyarrangements in toilets near Bulldozer shed & Hydrogen plantincluding cost of all pipes, specials such as Tees, bends, couplings, union, cutting, threading, joining, labour, lead, lift, etc., complete. |