| 1 | Schedule \"A\" Part - I (BUILDINGS AND STRUCTURES)This Schedule (contains under mentioned Sl. item No. 1.01 to1.04) is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only.The tenderer is required to quote their rates in Column 6. |
| 2 | Lumpsum price worked out by the contractor for Construction of Main Guard Room in single storey with permanent specification with Load bearing wall using PCC blocks Masonry, RCC framed structure and roof, ATT, Roof Treatment using APP Membrane etc.,complete all as shown on drawings and as per specification. |
| 3 | Lumpsum price worked out by the contractor for Construction of Sentry Box in single storey with permanent specification with Load bearing wall using PCC blocks Masonry, RCC framed structure and roof, ATT, Roof Treatment using APP Membrane etc.,complete all as shown on drawings and as per specification. |
| 4 | Lumpsum price worked out by the contractor for Construction ofon site hume pipe septic tank of 10 users,designed to carry sewage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, vent shaft, connection etc., complete as per drg no TD/AR/110 sheet no 1/1 and as specified. |
| 5 | Lumpsum price worked out by the contractor for Construction ofSoakage well of size 1.20 m dia and 3.00 m effective depth, Soakage well excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber and screen chamber made of brick masonry in CM, RCC cover slab in M 25/ SFRC cover, interconnecting pipes of RCC/ DWC complete filled with brick bats, complete all as shown on drawings and as specified. |
| 6 | Lump sum price worked out by the Contractor for “EXCAVATION, EARTH WORK AND SITE CLEARANCE” as listed in Schedule ‘A’ Part - IIrepresenting_______ % ______________ percent Above / Below the lump sum price of `25,995.91inserted by the MES in Schedule ‘A’ Part - II |
| 7 | Lump sum price worked out by the Contractor for “ROAD/PATH/HARD STANDING ” as listed in Schedule ‘A’ Part - III representing__________ % ____________ percent Above /Below the lump sum price of ` 65,730.45 inserted by the MES in Schedule ‘A’ Part - III |
| 8 | Lump sum price worked out by the Contractor for “ SEWAGE DISPOSAL ” as listed in Schedule ‘A’ Part - IV representing__________ % ____________ percent Above /Below the lump sum price of ` 28,447.47 inserted by the MES in Schedule ‘A’ Part - IV |
| 9 | Lump sum price worked out by the Contractor for \"INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - V representing_______ % __________________ percent Above / Below the lump sum price of `21,195.26 inserted by the MES in Schedule ‘A’ Part - V |
| 10 | Lump sum price worked out by the Contractor for \"INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part - VI representing_______ % __________________ percent Above / Below the lump sum price of `81,256.05 inserted by the MES in Schedule ‘A’ Part - VI |
| 11 | Lump sum price worked out by the Contractor for “ EXTERNAL WATER SUPPLY ” as listed in Schedule ‘A’ Part - VII representing______ % _________________ percent Above / Below the lump sum price of`12,278.28 inserted by the MES in Schedule ‘A’ Part - VII |
| 12 | Lump sum price worked out by the Contractor for “ EXTERNAL ELECTRIC SUPPLY ” as listed in Schedule ‘A’ Part - VII representing______ % _________________ percent Above / Below the lump sum price of`21,884.35 inserted by the MES in Schedule ‘A’ Part - VII |
| 13 | Schedule \"A\" Part - IXThis Schedule is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only.The tenderer is required to quote their rates in Column 6.This Schedule constitutes Sl. Item No. 10.00 to 13.00 |
| 14 | INTERNAL ELECTRIFICATION S&F in replacement of wall mounted batten type LED light of 12 watts with aluminium extruded batten and system lumens of 1200 Im minimum with IP & surge protection alongwith driver efficency >85% and power factor >0.95, colour rendering index CRI>80 along with integrated driver complete and connecting to the point wiring with necessary flexible copper conductor of multistrand three core of suitable lenth from fitting to the ceiling rose all as directed by GE. Make Philips, Model BN021 LED12S PSU GR or equivalent make in Havells/Wipro/GE. |
| 15 | S&F in replacement of wall mounted batten type LED light of 22 wattswith aluminium extruded batten and system lumens of 2200 Im minimum with IP & surge protection alongwith driver efficency >85% and power factor >0.95, colour rendering index CRI>80 along with integrated driver complete and connecting to the point wiring with necessary flexible copper conductor of multistrand three core of suitable lenth from fitting to the ceiling rose all as directed by GE. Make Philips, Model BN021 LED22or equivalent make in Havells/Wipro/GE. |
| 16 | Supply and fixing PVC Body Exhaust fan of 250 mm sweep of 1150 RPM, Air Delivery 800 CMH single phase 50HZ AC supply with louvers and connecting up with and including provision of PVC insulated copper flexible cord from ceiling rose to conncetion of exhaust fan complete all as specified. |
| 17 | SEWAGE DISPOSALM & L for DWCPE(SN8)(OD) / 163 (ID) mm pipes laid in trenches complete, all as specified anddirected. |