| 1 | GENERAL JOBS |
| 2 | Replacement of worn-out of M.S. Runner of PCC, SCC, ICC, Elevator, RBC and cross carrier chains |
| 3 | Replacement of worn-out of M.S. guide angle (daab) of PCC, SCC, ICC, Elevator, RBC and cross carrier chains. |
| 4 | Replacement of S.S. tubes of all juice heaters, vapour line juice heater and semi-Kestner. |
| 5 | do but of all pans |
| 6 | do but of all evaporators |
| 7 | Welding joints of water, juice, vapour and exhaust pipe lines of all sizes, any tank, pans, condenser, evaporator body etc. |
| 8 | Pipe line upto 12” dia |
| 9 | Dismantling |
| 10 | Erection |
| 11 | Pipe line above 12”diafrom MS plate |
| 12 | Dismantling |
| 13 | Fabrication |
| 14 | Erection |
| 15 | Bends from readymade pipe line up to 12\" dia |
| 16 | Dismantling |
| 17 | Fabrication |
| 18 | Erection |
| 19 | Bends above 12” dia from MS plate |
| 20 | Dismantling |
| 21 | Fabrication |
| 22 | Erection |
| 23 | Tee, Nipples & Crosses upto 12” dia |
| 24 | Dismantling |
| 25 | Fabrication |
| 26 | Erection |
| 27 | Tee, Nipples & Crosses above 12” dia from M.S plate |
| 28 | Dismantling |
| 29 | Fabrication |
| 30 | Erection |
| 31 | Reducers of all sizes, |
| 32 | Dismantling |
| 33 | Fabrication |
| 34 | Erection |
| 35 | Flanges of all sizes, |
| 36 | Dismantling |
| 37 | Fabrication |
| 38 | Erection |
| 39 | Valves: |
| 40 | Dismantling |
| 41 | Erection |
| 42 | Fabrication |
| 43 | Man Holes ofall sizes |
| 44 | Dismantling |
| 45 | Fabrication |
| 46 | Erection |
| 47 | Platform: |
| 48 | Dismantling |
| 49 | Fabrication & Erection |
| 50 | M.S. Structure work |
| 51 | Dismantling |
| 52 | Fabrication |
| 53 | Erection |
| 54 | M.S. Tank completehaving round & conical & rectangular bottoms |
| 55 | Dismantling |
| 56 | Fabrication |
| 57 | Erection |
| 58 | M.S Rubber seated valves of any types |
| 59 | Dismantling |
| 60 | Fabrication |
| 61 | Erection |
| 62 | NRV of any type: |
| 63 | Dismantling |
| 64 | Fabrication |
| 65 | Erection |
| 66 | Platform Pipe Line railing of all sizes |
| 67 | Dismantling |
| 68 | Erection |
| 69 | Fabrication of S.S rubber seated valves and NRV of all sizes |
| 70 | M.S. Patch work |
| 71 | Fabrication and Erection M.S. stair; |
| 72 | Monkey tower type |
| 73 | Steptype |
| 74 | StraighteningM.S plate |
| 75 | Strengthening of any structure with M.S Angle/Channel |
| 76 | S.S. to S.S. welding |
| 77 | Fabrication and erection of all type of pump + motor bed. |
| 78 | MILL HOUSE |
| 79 | Drilling and Tapping of Mill’s top roller of square end face having size 8-20M at 265 PCD and 50mm deep thread for fitting of Ropeless coupling. |
| 80 | Dismantling, fabrication & erection ofmills juice tray (M.S. Plate) |
| 81 | Fabrication of SCC and inter carrier chain’s rake. |
| 82 | Repair of Secondary Cane Carrier & inter Carrier Chain’s rake. |
| 83 | Fabrication ofTRPF juice tray |
| 84 | Fabrication ofTRPF top roller cover |
| 85 | Dismantling, fabrication and erection of Donnelly chute of mills |
| 86 | Fabrication and erection of mill roller crown pinion guard |
| 87 | Fabrication and erection of TRPF roller crown pinion guard |
| 88 | Complete repair of TRPF pressure chute, including replacement of worn out S.S. Plate |
| 89 | Fabrication of discharge roller scrapper assembly. |
| 90 | Replacement of worn out bottom boot of inter carrier chain. |
| 91 | BOILER HOUSE |
| 92 | Replacement of Cast Iron Furnace chute of J.T. and Texmeco Boilers. |
| 93 | Fabrication of RBC slats made out from 3 mm thick plate for both RBC Chain |
| 94 | Repair of RBC Slat |
| 95 | Replacement of M.S. Bagasse chute of J.T. and Texmeco Boilers. |
| 96 | Replacement of worn out furnace door of Taxmaco/ J.T. boilers. |
| 97 | do but door frame |
| 98 | Repair & fitting o furnace door of Texmaco/JT boiler |
| 99 | Fabrication of steam drum partition Plates ofBoilers |
| 100 | Repair of steam drum partition Plates of Boilers |
| 101 | Boiler damper - Dismantling |
| 102 | Boiler damper - Fabrication |
| 103 | Boiler damper - Erection |
| 104 | Boiler damper - Repair |
| 105 | Replacement of Boiler Ducting |
| 106 | Replacementof economizer baffle Texmaco boiler |
| 107 | Modification of FD fan Motor bed along with strengthening of bed base structure |
| 108 | Modification of inlet ducting of APCD for Texmaco boiler |
| 109 | Repair work of bagasse adjusting gate |
| 110 | BOILING HOUSE |
| 111 | Replacement of worn out various types of strainers that of lime pumps, un-sulphured, syrup pumps etc. |
| 112 | Complete replacement of worn out save-all of evaporator bodies in all respects. |
| 113 | Complete replacement of worn out save-all of pans in all respects. |
| 114 | Replacement work of complete shell portion of any Pan beginning from Calenderia to taper portion including all connections. |
| 115 | Replacement work of complete taper portion of Pan from body to save all |
| 116 | Replacement of worn out vapour pipe of various sizes of pans going to condenser |
| 117 | Replacement of worn out steam/general coil of Ordinary design :size - 1/2\"\" to 3\"\" |
| 118 | Replacement of worn out steam/general coil of Ordinary design :size - 4\"\" to 6\"\" |
| 119 | Replacement of worn out steam/general coil of Pure circular design: size - 1/2\"\" to 3\"\" |
| 120 | Replacement of worn out steam/general coil of Pure circular design: size - 4\" to 6\" |
| 121 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Full Bend:- 900 mm |
| 122 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Full Bend:- 1100 mm |
| 123 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Full Bend:- 1250 mm |
| 124 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Full Bend:- 1400 mm |
| 125 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Half Bend:- 900 mm |
| 126 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Half Bend:- 1100 mm |
| 127 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Half Bend:- 1250 mm |
| 128 | Dismantling, fabrication & erection of pans vapour pipe line bends leading from body shell to condensers. Rates to quoted in terms of Half Bend:- 1400 mm |
| 129 | Replacement of gutters - Dismantling |
| 130 | Replacement of gutters - Fabrication |
| 131 | Replacement of gutters - Erection |
| 132 | Replacement of gutters - Repair |
| 133 | Replacement of worn out stirrer arms(Straight Type) |
| 134 | Replacement of worn out stirrer arms(Worm Type) |
| 135 | Replacement of worn out umbrella of pans |
| 136 | Replacement of all pipe line of sulphur burners cooler, complete in all respect. |
| 137 | Replacement of worn out portion of sulphur burner cooler inside pipeline. |
| 138 | Complete replacement of worn-out after burner of Sulphur furnace i.e including the replacement of internal pipe line also |
| 139 | Dismantling, Fabrication and erection of sulphur burner melter for sulphur furnaces. |
| 140 | Replacement of worn-out bagacilo pipe line made out from G.I. plain sheet of standard size |
| 141 | Replacement of Y type steam connection for syrup and molasses tank at pan station |
| 142 | Replacement of vacuum filter agitator |
| 143 | Fitting and modification of planetary gear box along with dismantling of existing gear system. |
| 144 | 80 Ton |
| 145 | 60 Ton |
| 146 | 40 Ton |
| 147 | 1 Ton |
| 148 | Replacement of worn out partition plates of headers of juice heaters, complete in all respect. |
| 149 | Replacement of S.S pipeline of any size: |
| 150 | Dismantling |
| 151 | Fabrication |
| 152 | Erection |
| 153 | Cone(Bottom saucer) of semi kestner |
| 154 | Dismantling |
| 155 | Fabrication |
| 156 | Erection |
| 157 | CENTRIFUGAL STATION |
| 158 | Replacement of Hopper trough |
| 159 | Replacement of complete portion of hopper tray |
| 160 | Replacement of molasses chute of Continuous Centrifugal machine. |
| 161 | Replacement of molasses chute of Batch type Centrifugal machine |
| 162 | Replacement of any worn out shell portion of pug mills/magma mixers |
| 163 | Modification of cooling coils of overhead crystallizer. |
| 164 | Fabrication & erection of magma pump/hi-flow pump foundation structure. |
| 165 | Modification of magma pump/hi-flow pump foundation structure. |
| 166 | POWER HOUSE |
| 167 | Fabrication & erection of cable tray |
| 168 | Replacement of switches/MCCB 630 AMP,400 AMP,250 AMP |
| 169 | Replacement/erection of changeover switch 630 AMP/400 AMP/ 250/ AMP |