| 1 | Maintenance, servicing and testing of split type/window type AC, capacity upto1.50/2 tons, any make, by cleaning cooling coil, condenser fins, blowing of dust from machines/air filters, checking and decarbonising all electric system oiling/greasing of blower motor, checking and removing any vibration and leakage in the equipment including checking/repair to inter locking device for winter/summer to ensure cutting off of compressor/heating in case of failure of blower motor including taking down and refixing in position complete all as specified and directed by Engr-in-Charge.Note:- Cost of minor repair, replacement of petty items such as nuts, bolts, washers, screws, rubber mounting pads of compressor etc, transportation of equipment to workshop and back is deemed to be inclusive in the unit rates quoted by the contractor. |
| 2 | Supply and fix in replacement, new compressor for split type / window type AC 1.5 Ton capacity including disconnecting, opening up, taking out burnt compressor by cutting/opening the pipe connections, fixing in position, reassembling, testing and commissioning including gas & oil charging after flushing the line with CO2 gas to avoid trapping the water vapour ensuring leak proof system complete all as specified and directed by Engr-in-Charge.Note:- Compressor shall be tested to entire satisfaction of Engr-in-Charge and test results recorded and kept on charge. |
| 3 | S&Fin replacement, new compressor hermetic/rotary for split type / window type AC of 2.00 Ton capacity including disconnecting, opening up, taking out burnt compressor by cutting/opening the pipe connections, fixing in position, reassembling, testing and commissioning including gas & oil charging after flushing the line with CO2 gas to avoid trapping the water vapour ensuring leak proof system complete all as specified and directed by Engr-in-Charge.Note:- Compressor shall be tested to entire satisfaction of Engr-in-Charge and test results recorded and kept on charge. |
| 4 | S&F in replacement; starting relay suitable for window type AC of capacity up to 2 ton complete all as specified and directed by Engr-in-Charge. |
| 5 | Supply and fix in replacement; over load protection suitable for window type AC of capacity up to 2 ton complete all as specified and directed by Engr-in-Charge. |
| 6 | S&F in replacement;thermostat switch suitable for window type AC of capacity up to 2 ton complete all as specified and directed by Engr-in-Charge. |
| 7 | S&F in replacement, blower motor 1/8 HP, double shaft, single phase suitable for window type AC up to 2 ton capacity including testing complete all as specified and directed by Engr-in-Charge. |
| 8 | S&F in replacement, front grill for window type AC up to 2 ton capacity complete all as specified and directed by Engr-in-Charge. |
| 9 | S&F in replacement, internal unit completefor split type AC 1.5 Ton capacity, comprising of blower motor, fan blade with rotor, evaporator with suitable filter, remote control system along with outer shell complete all as specified and directed by Engr-in-Charge. |
| 10 | S&F in replacement; external unit includingcompressorfor split type AC 1.5 Ton capacity, comprising of condenser oil, blower motor, blower fan, copper valve ½” & 5/8” with hot and cold arrangement including copper condensor coil complete all as specified and directed by Engr-in-Charge. |
| 11 | S&F in replacement; power circuit breaker (PCB) kit for split/window type ACfor 2 ton complete all as specified and directed by Engr-in-Charge. |
| 12 | M&L for trickle charging of gas F-22 or as required in AC, any capacity, after detection of leakage with soap solution/halide torch ,making the system leak proof by brazing/ soldering the leakage point, flushing out the moisture contentstrapped in the pipe line by charging CO2 gasand maintaining the pressure forprescribed period complete all as specified and directed by Engr-in-Charge. |
| 13 | S&F in replacement; blower motor 1/8 HP, single phase suitable for desert cooler including testing, complete all as specified and directed by Engr-in-Charge. |
| 14 | M&L for taking down existing unserviceable fan motor from desert cooler and including replacement of wornout winding, bushes and bearing etc refixing, connectingand testing complete all as specified and directed by Engr-in-Charge. |
| 15 | S&F in replacement of water lifting submersible pump suitable for desert cooler as per existing capacity complete all as specified and directed by Engr-in-Charge. |
| 16 | S&F in replacement;selector switch three speed (low, medium and high) suitable for desert coolers including taking out unserviceable selector switch complete all as specified and directed by Engr-in-Charge. |
| 17 | S&F PVC pipe 15mm dia suitable for desert coolers including taking out unserviceable PVC pipe complete all as specified and directed by Engr-in-Charge. |
| 18 | S&F cooler pad made of Khas-Khas suitable for desertcoolers including taking out unserviceable pads complete all as specified and directed by Engr-in-Charge. |
| 19 | S&F starting capacitor 40 MFD 230 Volts including taking out unserviceable capacitor, including testing complete all as specified and directed by Engr-in-Charge. |
| 20 | S&F in replacement; Fan blade of desert cooler heavy duty HDPE suitable for 4000/5000 CFT cap complete all as specified and directed by Engr-in-Charge. |
| 21 | S&F in replacement; copper conductor cable 40/0.0076 Sqmm 3 core not less than 3 mtrs long with plug top 5 Amp suitable for desert cooler, complete all as specified and directed by Engr-in-Charge. |
| 22 | S&F in replacement; new compressor for water cooler of capacity 40/80 Ltr, deep freezer capacity 200 to 300 Ltr including disconnecting, opening up, taking out burnt compressor by cutting/opening the pipe connections, fixing in position, reassembling, testing and commissioning including gas & oil charging after ensuring entire system leak proof complete all as specified and directed by Engr-in-Charge. |
| 23 | S&F in replacement; new compressor for water cooler of capacity 60/120 Ltr,including disconnecting, opening up, taking out burnt compressor by cutting/opening the pipe connections, fixing in position, reassembling, testing and commissioning including gas & oil charging after ensuring entire system leak proof complete all as specified and directed by Engr-in-Charge. |
| 24 | S&F in replacement; blower motor 1/35 HPwith base and clamp, rubber mountings for water coolers including taking out the old unserviceable motor complete all as specified and directed by Engr-in-Charge. |
| 25 | M&L for rewinding of blower motor of water cooler40/80 litres capacity any make with super enamelled copper wire including replacement of wornout bushes etc and testing complete all as specified and directed by Engr-in-Charge. |
| 26 | M&L for rewinding of blowerof Deep freezer hard top 200 litres capacity having single door any make with super enamelled copper wire including of wornout bushes etc, complete all as specified and directed by Engr-in-Charge. |
| 27 | M&L for trickle charging of gas F-12 or as required in water cooler, any capacity, after detection of leakage with soap solution/halide torch, making the system leak proof by brazing/ soldering the leakage point, flushing out the moisture contentstrapped in the pipe line by charging CO2 gas and maintaining the pressure for prescribed period complete all as specified and directed by Engr-in-Charge. |
| 28 | S&F in replacement, push type water tap, 15 mm dia, chromium plated suitable for water cooler complete all as specified and directed by Engr-in-Charge. |
| 29 | S&F in replacement, thermostat switch suitable for water cooler, any capacity/make including taking down unserviceable thermostat switch complete all as specified and directed by Engr-in-Charge. |
| 30 | S&F in replacement; new compressor for refrigerator of capacity 286/310 Ltr including disconnecting, opening up, taking out burnt compressor by cutting/opening the pipe connections, fixing in position, reassembling, testing and commissioning including gas & oil charging after ensuring entire system leak proof complete all as specified and directed by Engr-in-Charge. |
| 31 | M&L for trickle charging of gas F-12 or as required in refrigerator of capacity 286/310 Ltr, after detection of leakage with soap solution/halide torch ,making the system leak proof by brazing/ soldering the leakage point, flushing out the moisture contentstrapped in the pipe line by charging CO2 gas and maintaining the pressure for prescribed period complete all as specified and directed by Engr-in-Charge. |
| 32 | S&F in replacement; thermostat switch for refrigerator of different capacity/make including taking out old unserviceable thermostat switch complete all as specified and directed by Engr-in-Charge. |
| 33 | S&F in replacement; capillary tube made of copper, any size suitable for Refrigerator/Water Cooler including taking out old unserviceable capillary tube complete all as specified and directed by Engr-in-Charge. |
| 34 | S&F in replacement;capillary filter drier 2 way suitable for water cooler including taking out old unserviceable capillary filter complete all as specified and directed by Engr-in-Charge. |
| 35 | S&F in replacement; tubular heating element 1500 Watt, complete all as specified and directed by Engr-in-Charge. |
| 36 | S&F in replacement; heating element 2000 Watt, complete all as specified and directed by Engr-in-Charge. |
| 37 | S&F in repair heating element for solar water heater capacity 3000 watt, complete all as specified and directed by Engr-in-Charge. |
| 38 | Taking out existing hot water pipe line and fixing the same after cleaning including refixing arrangement such as hooks, glass wool and aluminium cladding etc including required fitting complete all as specified and directed by Engr-in-Charge of the following sizes:-a) 20 mm dia,heavy grade. |
| 39 | b) 25 mm dia,heavy grade. |
| 40 | S&F hot water pipe line (heavy grade) duly insulated with glass wool and aluminium cladding complete all as specified and directed by Engr-in-Charge of the following sizes:-a) 20 mm dia,heavy grade. |
| 41 | b) 25mm dia,heavy grade. |
| 42 | S&F in replacement; thermostat for Geyser of capacity 50 Ltr/25 Ltr complete all as specified and directed by Engr-in-Charge. |
| 43 | S&F in replacement; safety valve for any capacity of Geyser complete all as specified and directed by Engr-in-Charge. |
| 44 | S&F in replacement;15mm outer diaPVC connection for hot and cold water pipe 450mm long, with adaptors ofbrass jem nuts and rubber washers, both side complete all as specified and directed by Engr-in-Charge. |
| 45 | Supply, Install, Test and Commissioning of Voltage Stabilizerhaving following features i .e. high power efficiency intelligant time delay system (3 mnts + /- 20 sec ITDS ) inrush current capacity etc for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170V to 270 V with output voltage stabilized at 230V with accuracy of +/- 2.5% and of capacity 2.0 KVA, complete all as specified and directed by Engr-in-Charge. |
| 46 | Supply, Install, Test and Commissioning of Voltage Stabilizerhaving following features i .e. high power efficiency intelligant time delay system (3 mnts + /- 20 sec ITDS ) inrush current capacity etc for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170V to 270 V with output voltage stabilized at 230V with accuracy of +/- 2.5% and of capacity 5.0 KVA, complete all as specified and directed by Engr-in-Charge. |