|
| 1 | Semi comprehensive maintenance of 50 LPH capacity RO System including cleaning of all filters, repairing/ replacement of all electrical and electronic spare parts & one time replacement of consumable filters (except membrane & Pre Filter) by attending complaints within 24 hours & four mandatory services per year etc. including credit of dismantle material complete as required. (30 Nos.) |
| 2 | Semi comprehensive maintenance of 60/80 SS Water Cooler with inbuilt RO+UV systemhaving storage capacity 80 Ltr and cooling capacity 60 LPH including cleaning of all filters, repairing/ replacement of all electrical and electronic spare parts, &one time replacement of consumable filters once in a year (except membrane & Pre Filter & gas charging) by attending complaints within 24 hours etc. including credit of dismantle material complete as required. (02 Nos.) |
| 3 | Semi comprehensive maintenance of 80/120 PSS Water Cooler with inbuilt RO+UV systemhaving storage capacity 120 Ltr and cooling capacity 80 LPH including cleaning of all filters, repairing/ replacement of all electrical and electronic spare parts, &one time replacement of consumable filters once in a year (except membrane & Pre Filter & gas charging) by attending complaints within 24 hours etc. including credit of dismantle material complete as required. (02 Nos.) |
| 4 | Semi Comprehensive Maintenance of Eureka Forbes Hot& Cold Water Dispenser with Inbuilt RO Purifier i/c (cleaning & back flushing of all filters) one timereplacement of consumable in a year like particulate filter, sediment filter, pre carbon filter, post carbon filter, anti scalant etc. excluding Membrane, repair/replacement of all electrical and electronic spare parts, Compressor (except gas charging), attending complaints within 24 working hours with complete overhauling and servicing etc. as requiredDismantled material shall be retained by the contractor.(09 Nos) |
| 5 | Comprehensive Annual Maintenance of Eureka Forbes make RO System of 10-15 LPH capacity including two mandatory services (cleaning of All Filters), repair/ replacement of all electrical and electronic spare parts and Filters (Except membrane Filter), attending complaints within 24 working hours with complete overhauling and servicing etc as required. (22 Nos.) |
| 6 | Supply & Replacement of RO TFC Membrane 75 GPD Eureka Forbes make i/c testing, commissioning etc. as required old dismantle shall be retained by the contractor. |
| 7 | Supplying and Charging of Gas in the Water Coolers after pressure testing leak detection and rectifying the breakage (if any) testing and commissioning complete as reqd. |
| 8 | Supply and replacement of 10\" Particulate / Sediment Filter Eureka Forbes make i/c Leak testing,commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 9 | Supply and replacement of Sediment Cartridge Filter Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 10 | Supply and replacement of Pre /Post Carbon Filter CartridgeEureka Forbes make i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 11 | Supply and replacement of 20\" Particulate / Sediment Filter Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd at site. Dismantle shall be retained by the contractor. |
| 12 | Supply and Fixing of 20\" Pre Filter assly to prevent of excess silt in feed water to RO machines i/c Leak testing, commissioning etc complete as reqd at site. |
| 13 | Supply and replacement of separately installed 20\" Pre Filter Eureka Forbes make spun 5 micron i/c Leak testing, commissioning etc complete as reqd at site.Dismantle shall be retained by the contractor. |
| 14 | Supply and replacement of Non- functional RO Pump 24Vcomplete with testing, & commissioning i/c credit of dismantle material etc. as required |
| 15 | Supply and replacement of Non- functional RO Pump 48Vcomplete with testing, & commissioning i/c credit of dismantle material etc. as required |
| 16 | Supply and replacement of Non- functional Solenoid Valve 24V complete with testing, & commissioning i/c credit of dismantle material etc. as required |
| 17 | Supply and replacement of Chrome Platted Brass Diverter Valve complete with testing, & commissioning i/c credit of dismantle material etc. as required |
| 18 | Supply and replacement of S.M.P.S. 24V assly Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd at site. |
| 19 | Supply and replacement of Push type chrome Platted brass tap for water cooler Eureka Forbes make i/c Leak testing, commissioning etc complete as reqd at site. |
| 20 | Supply and replacement of Automated Switching on/off device as per level of water in storage tank/ Water cooler etc as reqd. |