Supply Of C.I/C.S/G.M. Casting Items For Season 2024-25 , Supply Of C.I/C.S/G.M. Casting Items , C.I. Items Such As Bush, Rod, Hollow, Drum, Square Etc As Per Drg. Rough Machine , -Do- Supply Basis , -Do- Conversion Basis , G.M. Items Such As Bush, Rod, Hollow, Drum,Square Etc As Per Drg. Rough Machine , -Do- Supply Basis , -Do- Conversion Basis , G.M. Bearing Of Side Roller, Top Roller, Bottom Roller, Transmissiongear Etc. As Per Drg. Dully Machined In 85:5:5:5 Ratio , -Do- Supply Basis , -Do- Conversion Basis , C.I. Wheel For Lime Slakar As Per Drg. & Etp Clarifier As Per Drg , -Do- Supply Basis , -Do- Conversion Basis , C.I. Drum Coupling As Per Drg. 8& Below , -Do- Supply Basis , -Do- Conversion Basis , C.I. Drum Coupling As Per Drg. 10& Above , -Do- Supply Basis , -Do- Conversion Basis , C.I. Scraper As Per Drg. No.Kscms/Mh-15R1 Rough Machine , -Do- Supply Basis , -Do- Conversion Basis , C.I. Nozzleas Per Drg. , -Do- Supply Basis , -Do- Conversion Basis , C.I. Boiler Ash Plate For Gratebar As Per Drg. , -Do- Supply Basis , -Do- Conversion Basis , C. Lever For Boiler As Per Sample: , -Do- Supply Basis , -Do- Conversion Basis , Repairing/Replacement Of Hy.Cap Liner (After Repairing/Replacement Of Liner Hy.Tested Of The Pressure 4500 Lbs/02 & Polishing Of R/M 85:5:5:5 Completion (G.M) , -Do- Supply Basis , -Do- Conversion Basis , C.I. Mouth Piece For Boiler As Per Drg. , -Do- Supply Basis , -Do- Conversion Basis , C.I. V Belt Pully (Machined) With Pilot Bore Per 10 Mm Od Per Groove. , -Do- Supply Basis , -Do- Conversion Basis , C.I. Boiler Door (Machinned) As Per Drg/Sample , -Do- Supply Basis , -Do- Conversion Basis , Axle For Tie Rod Crank As Per Drg. , -Do- Supply Basis , -Do- Conversion Basis , C.I. Worm Wheel 72 Teeth , -Do- Supply Basis , -Do- Conversion Basis , C.I Worm Wheel 65 Teeth , -Do- Supply Basis , -Do- Conversion Basis , C.I Flate Coupling (Different Size Per 10Mm Od With Pilot Bore , -Do- Supply Basis , -Do- Conversion Basis , C.S. Pick Off Gear (Spur) - Nos. Of Teeth - 42, Module - 1.75 , -Do- - Nos. Of Teeth - 72, Module - 1.75 , -Do- - Nos. Of Teeth - 84, Module - 1.75 , New Supply Basis Cs/En-9 Worm Wheel For 40:1- Ratio R.G. Box , New Supply Basis Gm Worm Wheel For 40:1- Ratio R.G. Box , Replacement Of Gm Linner For Mill Hydraulic Cap , C.S. Trash Beam As Per Drg. Kscms/Mh-96-93-2002 On Supply Basis , C.S. Trash Beam As Per Drg. Kscms/Mh-96-93-2002 On Conversion Basis , C.S. Crown Pinion On Supply Basis , C.S. Crown Pinion On Conversion Basis , C.S. Base Plate Of Bearinghousing As Per Drg. On Conversion Basis , C.S. Base Plate Of Bearinghousing As Per Drg. On Supply Basis , C.S. Coupling Set As Per Drg. Supply Basis , C.S. Coupling Set As Per Drg. Conversion Basis , C.S. Trash Plate As Per Drg. Conversion Basis , C.S. Trash Plate As Per Drg. Supply Basis , C.S. Tail Bar As Per Drg. Kscms/Mh-694-017 Supply Basis , C.S. Tail Bar As Per Drg. Kscms/Mh-694-017 Conversion Basis , C.S. Rail For Cane Unloader Wheel As Per Drg. Supply Basis , C.S. Rail For Cane Unloader Wheel As Per Drg. Conversion Basis , C.S. Tei Bar For Mill Trash Plate As Per Drg. Kscms/Mh-43 Conversion Basis , C.S. Tei Bar For Mill Trash Plate As Per Drg. Kscms/Mh-43 Supply Basis , C.I Drum For Cane Unloader As Per Drg. Kscms/Mh- 522-2001Supply Basis , C.I Drum For Cane Unloader As Per Drg. Kscms/Mh- 522-2001Conversion Basis , C.Scane Unloader Gear Wheel- No. Of Teeth 68, Module - 6, Pcd- 408, Outer Dia- 420, Rd- 394.1 And Pinion Teeth - 18, Module- 6, Pcd- 108, Od- 120,As Per Drg. Kscms/Mh- 404-98Supply Basis , C.Scane Unloader Gear Wheel- No. Of Teeth 68, Module - 6, Pcd- 408, Outer Dia- 420, Rd- 394.1 And Pinion Teeth - 18, Module- 6, Pcd- 108, Od- 120, As Per Drg. Kscms/Mh- 404-98Conversion Basis , Spur Gear No. Of Teeth - 19, M- 8, Pcd-152, Od- 168, Rd- 133Mm, Fw- 130Mm As Per Drg. No. Kscms/Mh- 647-01Supply Basis , C.I V-Belt Pulley No. Of Grooves -3, Od- 225Mm, Thick.- 75Mm, Bore- 115Mm Supply Basis , C.I V-Belt Pulley No. Of Grooves -3, Od- 225Mm, Thick.- 75Mm, Bore- 115Mm Conversion Basis , Ci Beam As Per Drg. For Boiler Conversion Basis , Ci Beam As Per Drg. For Boiler Supply Basis