| 1 | Earth work in excavation by manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 2 | In All kind of soil 70% |
| 3 | Ordinary rock 30% |
| 4 | stone soling including carriage and cost of stone |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 6 | Providing & fixing upto floor five level precast cement concretesolid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost ofrequiredcentring,shuttering and curing complete1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and strutsupto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | 15mm Cement plasteron the rough side of single or half brick wall of mix:1 : 4 ( 1 cement : 4 coarse sand) |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 12 | Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. (Note: It Should have Low or No VOC as per Green Building guidelines) |
| 13 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 14 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge 1:4:8 or leaner mix (i/c equivalent design mix) |
| 15 | Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in : |