| 1 | Earth work excavation for foundations (Manual Means) of buildings,septic tank, sump, compound wallin ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., as required and as directed by Engineer-in-charge, complete. |
| 2 | Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc., to site, and including all charges for mixing, laying concrete in position, curing etc., & lift charges etc., as required and as directed by the Engineer-in-charge complete. All labour and materials. |
| 3 | for kerb and the slab over kerb wall |
| 4 | for drain work with centering |
| 5 | Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granitestonescarted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site,including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction,curing for finished item of work in foundation and basement etc., as required and as directed by the Engineer-in-charge, complete. All labour and materials. |
| 6 | Raggling of masonry or concrete surface etc., including brushing & polishing with two coats of the stones and dispose the debris within a lead of 50m etc., as required and as directed by the engineer in charge. Complete. All labour and materials. |
| 7 | Carting away of excavated earth / debris to a lead of 10KM (the rate including conveyance charges,loading, unloading charges by Mechanical means ) including ideal hire charges of truck etc. as required and as directed by the Engineer-in-charge of the work, and it includingall operational, incidental ,labour charges, requiredtools. |
| 8 | Flush/Sunk Pointing to Brick / RR Masonry in CM (1:3) including cost and conveyance of all materials at site and all operational, incidental labour charges, curing etc., as required and as directed by the Engineer-in-charge complete for finished item of work. All labour and materials. |
| 9 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces etc., as required and as directed by the engineer in charge complete. All labour and materials. |
| 10 | De-silting of drains including removing silt, slush, pebbles garbage, iron ore, iron ore fines etc., including removing sand from underwater if existing within a lead of 10m and lift of 2m and transportation of the same after drying, upto 0.5km and levelling the same as directed by the engineer in charge complete. |
| 11 | Supply and fixing of reflectors (Median markers) on the kerbwall as required and as directed by the engineer in charge complete. All labour and materials as per relevant IS specification. |
| 12 | Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire chargesas required and as directed by the Engineer-in-charge, complete. All labour and materials. |
| 13 | Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges etc.,as required and as directed by the Engineer-in-charge. All labour and materials, complete. |
| 14 | Hedge / shrub planting:Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio,internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) and it includingall operational, incidental, labour charges, requiredtools, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt)and plant material etc., - unit 1 Sqmt of work (* 11No./sqm of plants and bag size shall be arrived based on the spacing 0.3 c/c as per the design) as required and as directed by Engineer-in-charge, complete. All labour and materials. ( Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) |
| 15 | Digging of 1x1x1 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants etc., and it includingall operational, incidental, labour charges, requiredtools, complete. (excluding cost of plant material, fertilizers andchemicals(@ 20 gms / pit/ sqmt)), as required and as directed by Engineer-in-charge, complete. All labour and materials. ( Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) |
| 16 | Supply & Deliveryoftopiary/trees/Palms/shrubs/lawn/ ground coversand specified plants as per directions of officer in charge at siteincluding cost of plants plants of bag size 7\" x 8\" of plant height not less than 1.0 feet,8\" x 10\" of plant height not less than 3.0 feet,13\" x 13\"ofTree/Palm height not less than 5 feet,13\" x 13\"of plant (Hedges & Shrub) height not less than 2 feet,15\" x 16\" of plant (Tree/Palm/Topiary) height not less than 5 feet,18\" x 18\" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75\"\" and above,21\" x 21\" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1\"\" and above.Heights mentioned above are excluding bag height.All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. the rates inclusive of cost of plantscomplete for finished item of work, as required and as directed by Engineer-in-charge, complete. |
| 17 | Bougunvilea Spectabilis (13\"x13\") |
| 18 | Ficus panda gold (13\"x13\") |
| 19 | Pandanus veitchii (13\"x13\") |
| 20 | Bismarckia nobilis( 21\"x21\") |
| 21 | Korean grass (zoysia taponica) |
| 22 | Loading and unloading of plants bag size (21\"X21\") at site of work and stacking for lead less upto 50 m andincluding labour charges, T&P etc., as required and as directed by Engineer-in-charge, complete for finished item of work. (excluding cost of plant bag) |
| 23 | Loading and unloading of plants bag size (13\"X13\") at site of work and stacking for lead less upto 50 m andincluding labour charges, T&P etc., as required and as directed by Engineer-in-charge, complete for finished item of work. (excluding cost of plant bag) |
| 24 | Loading and unloading ofKorean grassat site of work and stacking for lead less upto 50 m andincluding labour charges, T&P etc., as required and as directed by Engineer-in-charge, complete for finished item of work. (excluding cost of korean grass) |
| 25 | Transportation of bag plants from Kadiyam to PCR circle/Sheelanagar in port area, as required and as directed by Engineer-in-charge, complete. (weight) |
| 26 | Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as required and as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges and materials etc., complete |
| 27 | Stone masnory |
| 28 | for unrein\"d cement concrete more than 15cm thick |
| 29 | Bed preparation for Korean/Mexican: Dressing the surface to the desired shape, laying of 150 mm. (6”) thick fine red garden soil, covered with a thin layer of 10 mm thick sand, watering, rolling (compacting to 4\" thickness by hand roller), including the cost of red garden soil, sand and labour charges etc., for complete bed preparation and laying and ramming of lawn mats / rolls in proper position on existing prepared bed by internal transportation from dumped place, including cost of labour for laying, ramming by hand roller / demesha, internal transportation and watering etc., and it includingall operational, incidental, labour charges, requiredtools, excluding cost of grass, fertilizers and chemicals etc., for 1 Sqm (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral), as required and as directed by Engineer-in-charge, complete. |
| 30 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including watering, weeding pruning, replacement of plants, gap filling, hoeing, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by the Engineer-in-charge, excluding cost of water, Manure, Fertilizer, Insecticide, Pesticide, lawn mover and brush cutter with fuel. All labour and materials. |
| 31 | Supplying and transportation of potable water in lorry/tankers having capacity 20KL including erection of suitable mechanical equipment (motor pumps) at backside of the tanker including necessary sprinkling arrangements with control valves filling and delivery of water at site of work crew charges, fuel charges, waiting charges, hire charges, hose pipes, taxes if any and with all equipment and erection charges etc, as required and as directed by the engineer-in-charge complete. All hire and operational charges (water will be supplied by VPA) |
| 32 | Supply of fertilizers/pesticides at the site of work as required and as directed by horticulture division/ Engineer-in-charge, complete. including cost of all materials and labour charges |
| 33 | Urea |
| 34 | Potash |
| 35 | Chlorpyrifos spray |
| 36 | Replacement of casualities including plant and plantation cost @5% during first year, |
| 37 | Replacement of casualities including plant and plantation cost @ 3% during second year |