|
| 1 | Construction of Sump pits at Tummalapalle plant area. |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge in all kinds of soil. |
| 3 | Painting of walls(interior) and ceilings with2(two) coatsof emulsion paint over a coat of seal-o-prime of Berger or any approved brand and shade by mechanical/manual means including preparation of surface to receive the painting togive aneven shade after removalof all dirtandremainsofloose powderedmaterials,includingcostand conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work at all lead and lifts as per manufacturer\"s specifications and directions of Engineer-in-charge. |
| 4 | Painting with Exterior Emulsion Paint of approved make (ACE from Asian Paint or weather coat champ of Berger make) over a coat of Seal-o-prime of berger make or any other approved brand within interval of not less than 6 hours between two coats by mechanical/manual means including preparation of surface to receive the painting togive aneven shade after removalof all dirtandremainsofloose powderedmaterials, including cost and conveyance of all materials, brushes, labour charges, curing, scaffolding and all other incidental and operational charges etc., complete for finished item of work in all floors. |
| 5 | Providing and fixing factory made solid wood polymer composite (WPC) single extruded door frame section of 100*65 mm with encapsulation of 6 mm rigid layer on all external surfaces. The door frame will have a rebate of 32mm/ 37 mm. The two vertical members are to be joined together with the horizontal member using 8x75 mm long ms star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using z hold fast 300 mm long hold fast as per specifications and directions of Engineer-in-charge. |
| 6 | Supplying and fixing of 25 mm thick wood plastic composite (WPC) door shutter of approved brand, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, comprising of virgin pvc polymer of k value 58-60 (suspension grade), calcium carbonate and natural fibers (wood powder) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800n (face) & 900n (edge), modulus of elasticity 900n/mm2 and resistance to spread of flame of class a category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk ss screws all as per specifications and direction of engineer - in- charge (ss butt hinges and ss screws shall be paid separately). |
| 7 | Supplying, fabrication and fixing MS Grills for windows/ ventilators/ balcony of all sizes as directedby the engineer-in- charge including cost and conveyance of all materialsto site and labour charges, tools and tacklesfor fabrication, fixingall materials etc . Complete for the finished item of work with M.S. Square bars/M.S. ANGLES/hollow sectionsor any other sections of all sizes with a coat of approved steel primer. |
| 8 | Removal of existing damaged tiles and dismantling the flooring upto concrete surface including cleaning, conveying the debris and stacking neatly at a place upto a lead of 50 mtr etc., complete as per directions of Engineer-in-charge. |
| 9 | Cement concrete with a mix of 1:3:6(1 cement:3 coarse sand:6 grade stone aggregate 20mm nominal size) prop. Using 20mmhard granite machine crushed metal with machine mixing at all lead and lift including cost and conveyance of all materials to site, laying, compacting, curing, finishing, all otherincidental, operational, labouretc., including seignorage charges & all materials, complete for finished item of work as per specifications and directions of Engineer-in-charge. |
| 10 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per specifications and direction of Engineer-in-Charge with 80 mm thick C.C. paver block of M - 30 grade with approved color design and pattern. |
| 11 | Painting of steel work with two coats of synthetic enamel paint of approved brand and shade including cost and conveyance of all materials to site, labour charges for preparing and cleaning the surface of dirt with soap andbrushes including putty, all incidental, operational charges etc., complete (the rate includestwo coats of paint and one coat primer) for finished item of work in all floors as per directions of Engineer-in-charge. |
| 12 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Painting wood work with Deluxe Multi Surface Paint of required shade of approved brand with two or more coats applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture including preparation(by mechanical/means) of surface to receive the paint as per directions of Engineer-in-charge. |
| 13 | Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) in required slopes including mixing, compacting, curing including cost of all materials, tools and tackles, taxes, royalty charges etc. complete as per specifications and directions of Engineer-in-charge. |
| 14 | Supplying and mixing water proofing chemical (Brushbond RFX of Fosroc or equivalent) in specified ratio in two coats over concrete surface/plastered surface including laying, curing including cost of all materials, tools and tackles, taxes, royalty charges etc. complete as per specifications and directions of Engineer-in-charge. |
| 15 | Roofing with 0.5mm thick galvanized / pre painted g.i. profiled sheets fixed to the purlins with 14 size self-drilling screws with neoprene washer. Side laps are stitched with selftapping / drilling screws. End laps are to be sealed with 25x3 mm butyl tape. The sheets should be provided with anti-capillary groove including cost and conveyance of all materialsto site and labour chargesfor fabrication, fixing etc., complete for the finished item of work as per directions of Engineer-in-charge. |
| 16 | Polishing to granite flooring applying Tenex Cera Fluida of Roff chemicals/ Magik liquid of MMC/ Nova granite polish of Floor Care Co with the help of floor scrubbing machine/hand scrub pads including cost and conveyance of all materials to site, all incidental, operational & labour charges for preparing and cleaning the surface of dirt with soap andbrushes, including putty, etc., complete for finished item of work. |
| 17 | Supply and fixing of cupboard shutter using teakwood scantling of size 50 mm x 50 mmteakwood as outer frame and 50 mm x 30 mm of size teakwood for shutter frames, 8mm thickbison lam as panel to each shutter consist of 2nos 75mm long tower bolt - 2 nos 75 mm bighandle the and other shutter will have 1 no of cupboard lack , 1 no of 75 mm long handle and75 mm x 10mm x 1mm thick ss hinges- 2 nos for each shutter. The above frame will be fixed to the wall with screws, the rate inclusive of screws, handle, etc., complete at site of work |
| 18 | Supplying and filling of cracks in walls/ceilings/concrete surfaces with Sika® Cracksil Acrylic Paste after making necessary groove in the surface including cleaning of groove,cost of all materials, tools and tackles complete as per manufacturer\"s specifications and directions of Engineer-in-charge at all leads and lifts. |
| 19 | Removal/Retrofitting of mosquito proof mesh including replacement with new one wherever required after making necessary adjustment in the surface including cleaning of groove,cost of all materials, tools and tackles complete as per manufacturer\"s specifications and directions of Engineer-in-charge at all leads and lifts. |
| 20 | Removal of damaged door frame and shutter/window including disposal of rubbish at a distance of 50mtr. wherever required without damaging adjacent wall member including stacking of servicable materials if any, cleaning, tools and tackles complete as per directions of Engineer-in-charge at all leads and lifts. |
| 21 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters with 30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws including applying a coat of wood primer as per specifications and directions of Engineer-in-charge. |
| 22 | Providing and laying lawn grass of approved quality as per specifications and directions of Engineer-in-charge. |
| 23 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and superstructure at all leads and lifts Cement Mortar 1:6 (1 cement : 6 coarse sand) as per specifications and directions of Engineer-in-charge. |
| 24 | Providing and fixing Ist quality ceramic glazed wall/floor tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete at all leads and lifts as per directions of Engineer-in-charge. |
| 25 | Removing old painted surface by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 26 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, single socketed pipes of 110 mm diameter |
| 27 | Providing and fixingIS : 12817 marked stainless steel door fixtures/ fittings including stainless steel screws including cost of materials, labour charges etc. complete |
| 28 | Butt hinges with stainless steel screws etc. complete of size 125x64x1.90 mm |
| 29 | Butt hinges with stainless steel screws etc. complete of size 125x64x1.90 mm |
| 30 | Chromium plated brass curtain rod of size 25 mm dia metre having wall thickness of 1.25mm with two chromium plated brass brackets fixed with C.P. brass screws and PVC sleeves etc., wherever necessary complete as per specifications and directions of Engineer-in-charge. |
| 31 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. completeof size 200x10 mm as per specifications |
| 32 | Providing and fixing chromium plated brass handles with necessary screws etc. complete of 100 mm size as per specifications. |
| 33 | Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete of size 300x16 mm as per specifications |
| 34 | Providing and fixing aluminium extruded section body tubular type universal hydraulic door closer (having brand logo with ISi, IS : 3564, embossed on the body, door weight upto 36 kg to 80 kg and door width from 701 mm to 1000 mm), with double speed adjustment with necessary accessories and screws etc. complete as per specifications |
| 35 | 15.mm cement plaster with cement mortar 1:6(1 cement:6 fine sand) including making grooves, cost and conveyance of all materials to site, labour charges, scaffolding,lifting (manual) curing, all other incidental and operational charges etc., but excluding seigniorage charges & GSTon all materials, complete for finished item of work all floors |
| 36 | Providing & fixing glass panes with putty and glazing clips and silicon sealant in windows/ventilators all complete with 4.0 mm thick glass panes as per specifications and directions of Engineer-in-charge. |