Madhyanchal Vidut Vitran Nigam Limited has published Tender For Construction Of Line And New Substation 250 Kva-Valmiki Park, Bel Wali Park Balda Colony, Navneet Dvar, Replacement Of Jurjur Abc Lt Line From Hasanganj Thana To Nayaganj Mod & Khanna Mill To Bengali Colony And Cradle Guarding Work Of 11 Kv O/H. Submission Date for this Tender is 27-05-2024. Transmission Line Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Safe Loading carriage & unlo-ading of following material from central store to JE Store/work site |
2 | ST pole 11/9 mtr |
3 | 11/0.4 KV 250KVA T/F |
4 | LT Cable 1x240//630/ 400 mmsq |
5 | Transportation from central store to site 11KV XLPE Cable 3x70 sqmm |
6 | 11KV XLPE Cable 3x120/70 sqmm Termination Kit |
7 | 33kv 3x300 sqmm cable |
8 | 33kv o/d termination kit |
9 | 33 kv lightening arrestor |
10 | 33kv post insulator |
11 | Transportation from central store to site ACSR Dog conductor |
12 | 11KV Pin Insulator |
13 | 11KV GI Pin |
14 | 11KV Disc Insulator |
15 | 11KV Disc Fitting |
16 | Gi wire |
17 | Earthing rod |
18 | ABC Cable 3x120/95/50/25sqmm |
19 | Stay set complete |
20 | Stay wire |
21 | 3 phase distribution box |
22 | Battery charger |
23 | Battery set |
24 | Safe Carriage of 9/11 Mtr ST pole/PCC Pole from Dump site to pit site |
25 | Fabrication errection of sub station type double pole on ST pole along with fixing of necessary clamp ,accessories required including supply and fixing of MS channel on top dropperwith arrangement of fixing of 3 Nos pin insulator as per respo specification ,making 11 KV Busbar by single core PVC .Only pole and pin with insulator clamp nutbolt provided by department |
26 | Errection 9 mtr ST Pole by digging pit upto 1/6 depth of pole errection of pole refilling of earth and proper ramming Binding of LT line accesso-ries |
27 | Laying of LT Cable 1x240/400/630 sqmm with suitable size of Al lugall material provide by depart-ment |
28 | Hoisting of LT Cable on pole through GI Pipe requied size clamping on pole only cable provided by department |
29 | Proper Jumpering of LT Cable on O/H Line |
30 | Making 11KV Bus bar on newly erected Double pole and tapping of 11KV line |
31 | Prepare proper space for construction of plinth |
32 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cementand course sand fiiling of structure completely as per norms with RCC Top 1:2:2 cementsand and course sand stone gritt with MS bar and MS chaanel for resting of T/F.All material provide by contractor exept T/F |
33 | Fabrication and fixing of wiremesh fencing around the11/0.4KV T/F and DP Box made as per require-ment 2mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremeshon it50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support,groutin properly by cement concrete and course sand all material provided by contractor |
34 | Fabrication and fixing of DP box stand made of MS Angle ,grouting and plinthing of the same all material provided by contractor |
35 | Fabrication and fixing of Metalic Distribution Pillar boxon stand with Nut bolt made of 20 SWG BP Sheet with door 18 SWG BP Sheet ,with fixing of 2 Nos MS Angle for mounting of Fuse unitthen fixing of fuse unit500 Amp 650 Volt and 3 Nos copper Bus Bar and 1 No Al Busbarall material arrange by contractor |
36 | earthingof Pipe type with 60 feet deep boring and provid-ing jindal make pipe "B" class 1" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe |
37 | Laying stringing and sagging of 3phase 3 wire 11KV Line by ACSR Dog Conductor. Only conductor provide by department. |
38 | Laying of 11 KV cable3 x70 sqmmin pukka road by drilling method |
39 | Hoisting of cable will be passed throughGI pipe required size dulyclamped with pole at the bottom ,middle and top of the pole |
40 | High pressure testing of 11KV Cable by high pressure equipment |
41 | Errection and commissioning of AB Conductor of size 3x120/95/50/25sqmm |
42 | Dismantling of jurjer AB Conductor after,opening of binding from insulator its rolling and carriage back to JE Dumpstore |
43 | Disconnection and reconne-ction of existing consumer connection |
44 | Commissioning of 3 Phase LT Distribution Boxand connect with AB Conductor by the help of PVC Single core cable Only Box provided by department |
45 | Supply and fixing of clamps |
46 | Holding clamp |
47 | LT Clamp for pole with GI Strip and schckle insulator |
48 | Crimping Al Lugs 240/400/630 sqmm |
49 | Copper L-Piece for T/F |
50 | Nutbolts off size |
51 | Danger board with clamp |
52 | Sundry Item |
53 | Eye Rag Bolt |
54 | Turn Buckle |
55 | Grouting binding nozzelling of stay set complete including fixing of necessary clamps accessories Grouting material provided by contractor |
56 | Ordinary Earthing by MS Earth rod2500 mm longby GI wire all material provide by department |
57 | Fixing and installation of 11KV /33KV O/D typeXLPE Jointing Kit ,olny jointing kit provide by department |
58 | Providing fabrication and fixing of DO Fuse set |
59 | Providing Fabrication and fixing of 11KV TPMO Set |
60 | Groutingof pole by cement course sand and brick ballast Civil material provided by Contractor |
61 | Painting of ST pole by 2 coat of red oxide and 2 coat of Al paint Paint provided by contractor |
62 | Safe installation of 11/0.4 KV 250 KVA T/F its connection from 11KV line and LT line mounting of copper L-piece providing and fixing of al lugs, Labour and T&P by contractor. |
63 | Istallation of battery and battery charger properly at control room and connect with supply system |
64 | Opening of 33KV Cable after opening from supply system from 10 MVA Power T/F |
65 | Opening of 33KV Jumper after opening from supply system from 10 MVA Power T/F |
66 | Dismantling of Power T/F from damage plinth by the help of Hydra and placing temporary plinth |
67 | Dismantling of damage plinth,remove waste material and its dispose off upto 50 Mtr Distance |
68 | Construction of new Plinth of size 4x3x1.3 including excavation of foundation base in concreting in ratio 1:6:12 first class bricks work in cement morter of ratio 1:4 foundation CC in 1:4:8 ratio(cement ,fine sand and brick ballast) and RCC workin Ratio 1:2:4 (cement,course sand,stone ballast)of 20mm using MS Bar of 10mm dia in reinforcement including its cutting ,bending and binding with required shape .the work also includes Laying of 2 Nos 3.46 Mtr Rail Piece complete with cutting welding and proper fitting etc material provided by contractor |
69 | Reerrection of Power T/F by the help of Hydra |
70 | Reconnect of11KV side Cable and earthing |
71 | Rejumpering of 33 KV side conductor |
72 | Fabrication of LA33 KV LA structure with 125x65 MS Channel and MS Angle for LA Grouting Painting of the same |
73 | Mounting of Post insulator and LA |
74 | Suply and fixing of missing Guard angles on 11KV Existi-ng pole with the help of x-arm clamp |
75 | Fabrication of Guards |
76 | Craddle guarding of existing 11KV Line |
77 | Chemical type earthing by digging of pit fixing of electrod earthing rod filling of Bentonite powder around the rod and water ,connect the GI Strip 32x5 mm with wiremesh fencing and DP Box |
78 | GST will be paid extra as per rule. |