}

Tender For Improvements Of Mrl42-Pallacolony To Pulavanpadi Road (Via Othalavadi, Saduperi) Km 0/0 - 4/110 And Km 7/335 - 9/350 With 5 Years Maintenance In Package No.Tn24-312 Chetpet Block Of Tiruvannamalai District Under Pmgsy Iii (2023-24), chetpet-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Improvements Of Mrl42-Pallacolony To Pulavanpadi Road (Via Othalavadi, Saduperi) Km 0/0 - 4/110 And Km 7/335 - 9/350 With 5 Years Maintenance In Package No.Tn24-312 Chetpet Block Of Tiruvannamalai District Under Pmgsy Iii (2023-24). Submission Date for this Tender is 19-06-2024. Road Work Tenders in chetpet Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

43429246
Tender For Improvements Of Mrl42-Pallacolony To Pulavanpadi Road (Via Othalavadi, Saduperi) Km 0/0 - 4/110 And Km 7/335 - 9/350 With 5 Years Maintenance In Package No.Tn24-312 Chetpet Block Of Tiruvannamalai District Under Pmgsy Iii (2023-24)
Open Tender
Indian
Tamil Nadu
chetpet
19-06-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Improvements Of Mrl42-Pallacolony To Pulavanpadi Road (Via Othalavadi, Saduperi) Km 0/0 - 4/110 And Km 7/335 - 9/350 With 5 Years Maintenance In Package No.Tn24-312 Chetpet Block Of Tiruvannamalai District Under Pmgsy Iii (2023-24)

Key Value

Document Fees
Refer document
EMD
INR 933000.0 /-
Tender Value
INR 4.66 Crore /-

Attachment

FileName File Description File Size
BOQ_210480.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Tender_Document_TN24312.pdf Tender Document 0 KB
a0499b67-b7c4-4ca5-9916-3865a592f748.html Tender Notice 0 KB

BOQ Items

Name of Work: Upgradation of MRL42-Pallacolony to Pulavanpadi Road (via Othalavadi, Saduperi ) including 5 Years maintenance in Package No.TN24312 of Chetpet Block
Sl. No. Item Description
1Road - 1 : Upgradation of MRL42-Pallacolony to Pulavanpadi Road (via Othalavadi, Saduperi )
2Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
3KM 0/0 - 1/0
4KM 1/0 - 2/0
5KM2/0 - 3/0
6KM 3/0 - 4/0
7KM 4/0 - 4/110
8KM7/335 - 8/0
9KM8/0 - 9/0
10KM 9/0 - 9/350
11Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
12KM 0/0 - 1/0
13KM 1/0 - 2/0
14KM2/0 - 3/0
15KM 3/0 - 4/0
16KM 4/0 - 4/110
17KM7/335 - 8/0
18KM8/0 - 9/0
19KM 9/0 - 9/350
20Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
21KM 0/0 - 1/0
22KM 1/0 - 2/0
23KM2/0 - 3/0
24KM 3/0 - 4/0
25KM 4/0 - 4/110
26KM7/335 - 8/0
27KM8/0 - 9/0
28KM 9/0 - 9/350
29Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
30KM 0/0 - 1/0
31KM 1/0 - 2/0
32KM2/0 - 3/0
33KM 3/0 - 4/0
34KM 4/0 - 4/110
35KM7/335 - 8/0
36KM8/0 - 9/0
37KM 9/0 - 9/350
38Construction of granular sub-baseby providingwell gradedmaterial, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static roller capacity to achieve thedesired density, complete as per Technical Specification Clause 402 Grading C
39KM7/335 - 8/0
40KM8/0 - 9/0
41KM 9/0 - 9/350
42Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalent in the ratio of 1:1:200 with Potable Water and spraying on the surface (a) 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be mensured
43KM 0/0 - 1/0
44KM 1/0 - 2/0
45KM2/0 - 3/0
46KM 3/0 - 4/0
47KM 4/0 - 4/110
48KM7/335 - 8/0
49KM8/0 - 9/0
50KM 9/0 - 9/350
51Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory rollerto achieve the desired density
52KM 0/0 - 0/100
53Construction of Sub base & Base by way of using blended material comprising of 60% Available soil of CBR> 5; 40% GSB Material, Grade B; 3% Cement by weight of soil; 1kg of Terrasil or Equivalent per cum & 1kg of Zycobond or Equivalent per cum; Mechanically blended using a Rotavator at Optimum Moisture Content; laid in Two layers of Equivalent Depth each and duly compacted with Static Roller Including Maintaining the Camber as per specifications. Complete job, finished work to be measured. (ref: MORD sl.no4.11-(i) page no.4-20)
54KM 0/0 - 1/0
55KM 1/0 - 2/0
56KM2/0 - 3/0
57KM 3/0 - 4/0
58KM 4/0 - 4/110
59KM7/335 - 8/0
60KM8/0 - 9/0
61KM 9/0 - 9/350
62Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
63KM 0/0 -0/100
64Providing and applying high priority primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology Iased Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on Prepared surface of granular base including cleaning of road surface and prime coat-mis made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water ($1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.
65KM 0/0 - 1/0
66KM 1/0 - 2/0
67KM2/0 - 3/0
68KM 3/0 - 4/0
69KM 4/0 - 4/110
70KM7/335 - 8/0
71KM8/0 - 9/0
72KM 9/0 - 9/350
73Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
74KM 0/0 - 0/100
75Providing and applying high priority tack-coat with cationic bitumen emulsion (CRS-1) in mixing ratio of 0.014 part Nanotechnology based Penetrative Reactive Water- soluble Organosilane material (forming water clear solution): 1 part water (<1000 ppm TDS): 1 part cationic bitumen emulsion and spraying using emulsion distributor at the rate of 1.2 times of conventional spray rate 0.275 Kg per sqm (i.e 0.33 kg/sqm) on the prepared new bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (ref: MORD Pg. No. 5-4)
76KM 0/0 - 1/0
77KM 1/0 - 2/0
78KM2/0 - 3/0
79KM 3/0 - 4/0
80KM 4/0 - 4/110
81KM7/335 - 8/0
82KM8/0 - 9/0
83KM 9/0 - 9/350
84Providing and laying bituminous macadam with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504.
85KM 0/0 - 0/100
86Providing and laying bituminous macadam with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504.
87KM 0/0 - 1/0
88KM 1/0 - 2/0
89KM2/0 - 3/0
90KM 3/0 - 4/0
91KM 4/0 - 4/110
92KM7/335 - 8/0
93KM8/0 - 9/0
94KM 9/0 - 9/350
95Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509(Using Waste Plastic)
96KM 0/0 - 0/100
97Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
98KM 0/0 - 1/0
99KM 1/0 - 2/0
100KM2/0 - 3/0
101KM 3/0 - 4/0
102KM 4/0 - 4/110
103KM7/335 - 8/0
104KM8/0 - 9/0
105KM 9/0 - 9/350
106Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
107KM 0/0 - 1/0
108KM2/0 - 3/0
109KM 4/0 - 4/110
110KM7/335 - 8/0
111KM 9/0 - 9/350
112Construction of Hardbed @ Ch: 8/130 - 8/150
113Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
114Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
115Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
116Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
117Construction of granular sub-baseby providingwell gradedmaterial, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static roller capacity to achieve thedesired density, complete as per Technical Specification Clause 402 Grading C
118Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory rollerto achieve the desired density
119Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M35 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to linesand grade as per drawing and Technical Specification Clause 1501
120Construction of Causeway @ Ch: 8/931 - 8/953
121Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M35 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to linesand grade as per drawing and Technical Specification Clause 1501
122Construction of Piped Causeway @ Ch: 8/653 - 8/963
123Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
124Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
125Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
126Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
127Providing and laying reinterced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106.
128Construction of granular sub-baseby providingwell gradedmaterial, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static roller capacity to achieve thedesired density, complete as per Technical Specification Clause 402 Grading C
129Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
130Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M35 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to linesand grade as per drawing and Technical Specification Clause 1501
131Provision for CD Works 1.50m RCC Slab culvert @ Ch:0/362
132Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
133Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
134Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
135Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
136Below Sill Level
137Above Sill Level
138Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
139Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
140Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
141Providing and fixing6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
142Providing and fixingTar Paper for bearing Between Bed Block & Deck slab
143Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
144Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
145Provision for CD Works 2 x 0.90m RCC Slab culvert @ Ch:1/672
146Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
147Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
148Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
149Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
150Providing and laying reinterced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling. concrete and masonry works in head walls and parapets Clause 1106.
151Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
152Construction of granular sub-baseby providingwell gradedmaterial, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static roller capacity to achieve thedesired density, complete as per Technical Specification Clause 402 Grading C
153Provision for CD Works 1 Nos. of 1.50m RCC Slab culvert @ Ch:4/073
154Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
155Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
156Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
157Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
158Below Sill Level
159Above Sill Level
160Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
161Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
162Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
163Providing and fixing6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
164Providing and fixingTar Paper for bearing Between Bed Block & Deck slab
165Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
166Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
167Provision for CD Works 1 Nos. of 1.50m RCC Slab culvert @ Ch:7/352
168Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
169Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
170Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
171Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
172Below Sill Level
173Above Sill Level
174Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
175Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
176Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
177Providing and fixing6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
178Providing and fixingTar Paper for bearing Between Bed Block & Deck slab
179Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
180Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
181Provision for CD Works 2 Nos. of 1.50m RCC Slab culvert @ Ch:8/593 & 8/813
182Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
183Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
184Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
185Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
186Below Sill Level
187Above Sill Level
188Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
189Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
190Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
191Providing and fixing6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
192Providing and fixingTar Paper for bearing Between Bed Block & Deck slab
193Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
194Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
195Provision for CD Works 1 No. of 2.00m RCC Slab culvert @ Ch:0/088
196Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
197Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
198Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
199Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
200Below Sill Level
201Above Sill Level
202Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
203Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
204Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
205Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
206Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating.
207Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
208Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
209Provision for CD Works 1 No. of 3.00m RCC Slab culvert @ Ch:2/523
210Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
211Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
212Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
213Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
214Below Sill Level
215Above Sill Level
216Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
217Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
218Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
219Providing and fixing6mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
220Providing and fixingTar Paper for bearing Between Bed Block & Deck slab
221Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
222Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
223Provision for Protective work @ Ch:1/723 - 1/783 Both Sides
224Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
225Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
226Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
227Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
228Below Ground Level - Footing
229Above Ground Level - Body Wall
230Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
231Provision for Protective work @ Ch:7/571 - 7/733 RHS
232Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
233Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
234Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
235Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
236Below Ground Level - Footing
237Above Ground Level - Body Wall
238Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
239Provision for Dismantling the existing 3 Nos. CD structures @ Ch:0/088, 0/362 & 0/672
240Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
241Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
242Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete
243Dismantling, Clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs
244Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.
245Provision for Dismantling the existing 1 No. CD structures @ Ch:4/073
246Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
247Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
248Dismantling, Clearing away and carefully stacking materials useful for re use. Removal of cut stone slabs
249Provision for Dismantling the existing 1 No. CD structures @ Ch:7/352
250Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
251Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
252Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete
253Provision for Dismantling the existing 1 No. CD structures @ Ch:8/593
254Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
255Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
256Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete
257Provision for Kilometre Stones
258Provision for Hectametre Stones
259Provision for Guard Stone in the all culverts
260Providingandfixingreflectiveroadstudsof‘categoryA’ Raisedpavementmarkersmadeout ofpolycarbonate/methylmethercrylate /ABSmouldedbodyconfirmingto ASTMD788and reflectivepanelswithmicroprismaticlenscapableofprovidingtotal internalreflectionofthe lightentering thelensfacewithretroreflectance andchromaticity valuesconforming to ASTMD4280.Thereflective raised pavement markers shallalsoconfirm totheMORTH circularNoRW/NH.33023/ 10/97-DO.IIIdt11.06.97. Theheight,widthandlengthshall notbelessthan15mm,90mmand100mmandwithminimumreflectivearea of13Sq.cm oneachsideandtheslopetothebaseshallbe35 +/ -5degree.Eachreflectorshall have aCIL notlessthanvaluesspecified inTable2ofsaidMORTHcircular. Thestrength of detachmentoftheintegratedcylindricalshanks,(ofdiameternotlessthan19+/ -2mmarid heightnotlessthan 30+/ - 2mm)fromthebodyistobe aminimumvalueof 500 Kgf.Fixing willbebydrillingholesontheroadfortheshankstogoinside, withoutnailsandusing epoxyresinbasedadhesiveaspermanufacturer’s recommendation andcompleteasdirected bytheengineer. Themarkershallsupportaloadof13635Kgtestedinaccordancewith ASTMD428Oandconfirming toIRC 35-2015guidelinesandMORT&Hspecification804 etc., complete
261RoadMarkers / Road Stud with Lens Reflector
262Providingandlaying ofhot applied Thermoplasticcompound2.5mm thick including reflectorising glass beads @ 250 gms persqmarea,thicknessof2.5mm isexclusive ofsurface applied glass beadsas perIRC:35.Thefinished surface tobelevel, uniformandfreefromstreaksandholesetccompleteasperMORT&Hspecification No.803
263Road Marking
264Providingand erectingof Retro-ReflectorisedCautionary,MandatoryandInformatorysigns {withdefinitionboard)madeoutofHighIntensityPrismaticGradeSheetingconfirmingto Type-IVstandardsof IRC-67:2012 and ASTM D4956 —09, specificationand fixed over 2mm thickAluminiumsheetfixedoverabacksupportingframeof 25mmx25mmx3mmMildSteel angleandsupportedonamildsteelanglepost75X75X6mmwithaclearheightofnotless than2. lOmfromthegroundleveltothebottomofthesignboardand0.60mbelowground level.ThesignpostshouldbepaintedasperIRC67-2012andfirmlyfixedtothegroundby meansofproperlydesignedfoundationwithM15gradecementconcrète45cmX45cmX60cm sizeincludingcostandconveyanceofallmaterials,equipment,Machineryandlabourwith allleads andlifts, loading charges necessary for satisfactory completion of thework as directedbytheengineerincharge.HighintensityRetro-Reflectrosheetshallconsistof minimumcoefficientof Retro-reflection asper Table6.6 of IRC67-2012.The retro- reflective sheetingshallbecoveredunder7yearwarrantyissuedforfieldperformanceanda certified copyofthreeyearsoutdoorexposurereportshallbeobtainedasper IRC67:2012 (as per MORT&HSpecificationNo.801)
26560cm equilator triangular Cautionary signBoard
26660cm circular mantatory
26780 cm x 60 cm rectangular (Informatorysigns)
26890 cm high octagon
269Metal bracket with type IX flotoscent prismatic reflective sheeting which is suitable for guard rail it is available one way/two way.Applied for metal crash barriers/ guard rail/ to provide reflection across wide range observation Reflector(Near culverts & trees)
270Provision for Citizen board
271Provision for Logo board
272Provision for Name board
273Provision for PMGSY Maintenance Board
274For the First Year from the date of completion of work
275For the Second Year from the date of cpmpletion of work
276For the Third Year from the date of completion of work
277For the Fourth Year from the date of completion of work
278For the Fifth Year from the date of completion of work
279GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail