Construction Of Bridge At Nunakadu Viswakothamangalam Madapuram - Deevambalpuramvillage- Linkroadkm 4/4 Acrossmulliyar In Thiruthuraipoondi Block Under Pmgsy Iii (2023 - 2024), Including 5 Years Maintenance,Tiruvarur District. Package No.Tn21415.

Issued by Local Bodies · thiruthuraipoondi, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Jul 2024
0 days left
EMD
3.82 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
thiruthuraipoondi → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction of Bridge at Nunakadu viswakothamangalam madapuram - Deevambalpuramvillage- linkRoadkm 4/4 acrossMulliyar in Thiruthuraipoondi Block under PMGSY III (2023 - 2024), including 5 Years Maintenance,Tiruvarur District. Package No.TN21415.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 11-Jun-2024 Maintenance for 5 years of bridge, year wise amount changed Other 19-Jun-2024
2 19-Jun-2024 Date Corrigendum Date 26-Jun-2024
3 26-Jun-2024 Date Corrigendum_2 Date 08-Jul-2024
4 08-Jul-2024 Date Corrigendum_3 Date 12-Jul-2024
5 11-Jul-2024 Date Corrigendum_4 Date 16-Jul-2024
6 16-Jul-2024 Date Corrigendum_5 Date 19-Jul-2024

BOQ

Name of Work:Construction of Bridge atNunakadu viswakothamangalam madapuram - Deevambalpuramvillage- linkRoadkm 4/4 acrossMulliyar in Thiruthuraipoondi Block under PMGSY III (2023 - 2024), including 5 Years Maintenance,Tiruvarur District. Package No.TN21415.
Sl. No. Item Description
1Nunakadu viswakothamangalam madapuram - Deevambalpuramvillage- linkRoad at km 4/4 acrossMulliyar.
2Dismantling the existing Reinforced Cement Concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
3Dismantling theexisting Plain Cement Concrete in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.
4Earth work excavation in all classes of soils except hard rock requiring blasting and depositing onbank asper SS20B with allleadsand lifts andall other incidentalchargessuch asbailingout water shoringstrutting, walling&formingprotective bundswherevernecessaryetccompleteasper releventstandardspecificationforDRESSING THE BED UPTO SILL LEVEL AND FLEXIBLE APRON.
5Earth work excavation in all classes of soils except hard rockrequiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and allincidental charges such as providing and maintaining necessarycofferdams, sheeting, shoring, bracing and their subsequentremoval, removal of all logs, stumps and other deleterious matterand obstructions, trimming bottom of excavation backfilling, andclearing the site and disposal of all surplus materials etc., complete as per relevent standard specification for FOUNDATION OF RAFT AND CUT OFF WALLS
6Earth work excavation in all classes of soils except hard rockrequiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and allincidental charges such as providing and maintaining necessarycofferdams, sheeting, shoring, bracing and their subsequentremoval, removal of all logs, stumps and other deleterious matterand obstructions, trimming bottom of excavation backfilling, andclearing the site and disposal of all surplus materials etc., complete as per relevent standard specification for FOUNDATION OF TOE WALLS OF REVETMENTS AND FLEXIBLE APRON
7Vibrated Reiforced CementConcreteofgrade M20 design mixusing 40mm, 20mm& 10mm HBG metal including costandconveyanceofallmaterialstosite and cement at siteincludingcost offormwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants andincidentalchargessuchasmaintainingof protective bunds cofferdams,horing,strutting etc., completeas perreleventstandardspecification forCUTOFF WALL (BELOW SILL)
8Reinforced CementConcreteofgrade M30 design mixusing 20mm& 10mm HBG metal including costandconveyanceofallmaterialstosite and cement at siteincludingcost offormwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants andincidentalchargessuchasmaintainingof protective bunds cofferdams,horing,strutting etc., completeas perreleventstandardspecification for Raft Foundation (BELOW SILL)
9Vibrated CementConcreteofgrade M15 nominal mixusing 40mm, 20mm & 10mm HBG metal including costandconveyanceofallmaterialstosite and cement at siteincludingcost offormwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants andincidentalchargessuchasmaintainingof protective bunds cofferdams,horing,strutting etc., completeas perreleventstandardspecification forBase course below Raft
10Filling inside the raft with clean good coarse sand including cost and conveyance of sand to work site, laying, handling charges andfilling in layers , tamping under optimum moisture content to get the maximum density including watering,with all leads of water andall other incidental charges etc. complete
11Vibrated Cement Concrete of grade M20 design mixusing 40mm, 20mm & 10mm HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concreteworking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification for SUBSTRUCTRE OF ABUTMENT , WING AND PIER(Above sill level)
12Providing and fixing seepage pipes of 100mm PVC pipes ofrequired lengths for abutments and wings including cost andconveyance of all materials to worksite, cost and labour for900mm dia semi-spherical backfill arrangements with 100mm sizebroken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill .
13Reinforced cement concrete M30 design mix using 20mm & 10mm ISS gradedhard granite crushed stone including cost and conveyance of allmaterials to site and cement at site excluding cost and fabrication of steel but including formwork and centering, softwater, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing,working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per specification for BEDBLOCK Cum DIRT WALL OVER ABUTMENTS .
14Providing and fixing KRAFT paper for full width of seating of deck slab and including cost and conveyance to worksite, labour forfixing the same in correct position and all other incidentalcharges etc., complete
15Vibrated reinforced cement concrete M30 (Design mix) using 20mm & 10mm ISS graded hard granite broken metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering soft water labour charges for mixing, transporting, placing in, position vibrating and compacting finishing and curing concrete,working at heights, hire charges for tools and plants, including all other incidental charges etc complete as per Specification forRCC DECK SLAB
16Providing and fixing 300mm thick PVC EXPANSION JOINT inbetween deck slabs over abutment and pier as shown in the drawingincluding cost and conveyance of expansion joints including shalimar pad and joint sealent etc., complete.
17Providing filter media behind the abutments and wings with clean III graded material53mm to 5.6mm to 600mm and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST\"s ( Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305-4-4 etc., complete
18Filling behind Abutments and wings with clean gritty gravel to including cost and conveyance of gravel to worksite, laying,handling,charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other charges etc complete FOR FILLING BEHIND ABUTMENT AND WINGS
19Supply and fabrication of S-500 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting bending,tying grills, including applying anti corrosive treatment, including overlaping to the required length wherever necessary and placing the the reinforcement in position as specified inthe drawings, includingcost of binding wire, provision of spacer bars cover blocks and all other incidental charges etc complete, S-500 grade including suitable anticorrosive treatment.
20Vibrated Cement Concrete of grade M15 (nominal mix)using 40mm, 20mm & 10mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing, transporting, laying and curing concrete working in heights andHire chargesfor Tools and Plants and all other incidental chargesetc., complete as per relevent standard specification for BASE COURSE BELOW APPROACH SLAB
21Vibrated reinforced cement concrete M30 (Design mix) using 20mm & 10mm ISS graded hard granite crushed stoneincluding cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering soft water labour charges for mixing transporting, placing in,positionvibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all otherincidental charges etc complete as per standard specification for APPROACHSLAB
22Vibrated Cement Concrete of grade M30design mixusing 20mm & 10mm ISSsize graded HBG metal including cost and conveyance of all materials to siteand cement at site including all labour charges for mixing concrete laying,vibrating Hire charges forTools and Plants, compacting, curing with all leads of soft water,including and all other incidental charges form work cost of premoulded expansionjoints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab
23Vibrated reinforced cement concrete M30 grade using 20mm & 10mm ISS graded hard granite crushed stoneincluding cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel butincluding formwork and centering,soft water labour charges for mixing transporting, placing in position vibrating and compacting finishing and curing, working at heights, hire charges for tools and plants, including all other incidental charges etc complete as per standard specification for RCC Hand rail Deck Slab
24Vibrated Cement Concrete of grade M20 design mixusing 40mm, 20mm & 10mm HBG metal including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concreteworking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc., complete as per relevent standard specification forRCC Crash Barrier type Parapet
25Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawings SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them inposition etc., complete
26Providing and making Gabion structure with mechanical woven Double twisted Hexagonal shaped wire mesh gabion boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh type 10 x 12 (D=100mm with tolerance of +-2 %) Zinc coated, Mesh wire diameter 3.0mm, Mechanically edged / Selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per m of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied at 3% by weight of gabion boxes, filling with boulders with least dimension of 200mm, as per drawing, all complete as per direction of Engineer - in - charge
27Enamel painting for Crashbarrier and handrail usingtwo coat of enamel paint
28Whitewashing for Abutment and Pier Substructure using two coats of freshly burnt Shell lime
29Approach Road
30Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
31Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , wateringand compacting etc, complete as per MOST 301 - 305.
32Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal@20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).
33Providing and laying 75mm compacted thick WBM Gr. II using 1 cum of 90mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for bottom layer.
34Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63mm to 11.2mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
35Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
36Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
37Providing and laying Reinforced cement concrete NP3 pipe for culverts on first class ext complete
38Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
39Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
40Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.
41Retaining Wall
421.Earthwork excavation in all classes of soils except hard rock requiringblasting & depositing on bank with all leads and lifts as per SS20B,including costof all labour, equipments and all incidental charges such asproviding andmaintainingnecessary cofferdams,sheeting,shoring, bracingandtheir subsequent removal,removal of all logs, bracing & and their subsequent andobstructions, trimming bottom of excavationbackfilling, andclearingthe siteanddisposalofallsurplusmaterials etc.,completeasperreleventstandard specification forRetaining Wall
432.Vibrated Cement Concrete of grade M15 (nominal mix 1:2:4) using 40mm, 20mm, 10mmHBG metal including cost and conveyance of allmaterials tositeand cementat site including cost offormwork, soft water,labour charges formixing, transporting,laying& curing concrete working at depths,Tools and Plants and incidental charges suchas maintainingofprotective bunds, cofferdams, shoring,strutting etc.,complete for Retainng Wall Foundation
443.VibratedCement Concrete of grade M20 (nominal mix 1:1.5:3) using40mm,20mm & 10mmHBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,soft water,labour charges for mixing, transporting, laying andcuring concreteworking atdepths,Tools and Plants andincidental chargessuchasmaintainingof protective bunds,cofferdams,shoring,strutting etc.,complete as per relevent standard specification for SUPERSTRUCTURE OF RETAINING WALL (Abovesill level).
454.Providingandfixingseepage pipes of100mmPVCpipes ofrequired lengthsfor abutments andwings includingcostandconveyance of all materials to worksite, costand labourfor 900mm dia semi-sphericalbackfill arrangements with 100mm sizebrokengranite chips attheperiphery andlabourchargesforfixing, etc., complete to drain the backfill.
465.Refilling with excavated earth complying with the standard specification for filling in the foundation trench including labour charges etc., complete.
47Provision forsafe Load Test
48Provision for Name Board
49Provision for Maintence Board
50Provision for Citizen Board
51Provision for Logo Board
52Provision for SignBoard
53Towards the charges for routine maintenance of the bridge work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits for bridge approach road, rivertraining works, white washing abutment and pier, painting of handrails/ crash barrier, repairing of damaged wearing coats, cealing of cracks with cement/ epoxy grouting, repairing of bearings, expansion joints, concrete railings / crash barrier with the periodicity for the above activities as prescribed in IRC- SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractors at its own cost.
54For the First Year from the date of completion of work
55For the Second Year from the date of completion of work
56For the Third Year from the date of completion of work
57For the Fourth Year from the date of completion of work
58For the Fifth Year from the date of completion of work
59GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

AI Tender Summary

OUR REF NO 43428121
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 19-07-2024
Authority
Authority Name Rural Development And Panchayats Department
Work Description Construction of Bridge at Nunakadu viswakothamangalam madapuram - Deevambalpuramvillage- linkRoadkm 4/4 acrossMulliyar in Thiruthuraipoondi Block under PMGSY III (2023 - 2024), including 5 Years Maintenance,Tiruvarur District. Package No.TN21415.
Basic Detail
Tender No TN21415
Bidding Type Tender
Location
City thiruthuraipoondi
State Tamil Nadu
Key Dates
Publish Date 16 Jul 2024
Submission Date 19 Jul 2024
Open Date 19 Jul 2024
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3.82 Lakhs
Exemption Not Available
Document List
Tendernotice_1.pdf
42fdb206-4d03-4c8c-95b4-7b540d6b14d6.html
TN21-415_Bridge_TechBid.pdf
BOQ_210455.xls
TN21-415_Bridge_PriceBid.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 16, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 19, 2024
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 26, 2024
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 08, 2024
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 12, 2024
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 16, 2024
18:00 IST

Corrigendum-5 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 19, 2024
18:00 IST

Corrigendum-6 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 19, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 19, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

html

42fdb206-4d03-4c8c-95b4-7b540d6b14d6.html

pdf

TN21-415_Bridge_TechBid.pdf

xls

BOQ_210455.xls

pdf

TN21-415_Bridge_PriceBid.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders