Tender For Design And Construction Of 282.00 Mtr Span Balance Cantilever Psc Box Girder Bridge Over River Chimtuipui Including Approaches At Km 6.490 On Road Hnathial - Sangau - Saiha Under 71 Rcc/24 Brtf/ Project Pushpak In Mizoram State Through Epc Mode
Tender Overview
Project Description
Tender For Design And Construction Of 282.00 Mtr Span Balance Cantilever Psc Box Girder Bridge Over River Chimtuipui Including Approaches At Km 6.490 On Road Hnathial - Sangau - Saiha Under 71 Rcc/24 Brtf/ Project Pushpak In Mizoram State Through Epc Mode; DESIGN AND CONSTRUCTION OF 282.00 MTR SPAN BALANCE CANTILEVER PSC BOX GIRDER BRIDGE OVER RIVER CHIMTUIPUI INCLUDING APPROACHES AT KM 6.490 ON ROAD HNATHIAL - SANGAU - SAIHA UNDER 71 RCC/24 BRTF/ PROJECT PUSHPAK THROUGH AN ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) CONTRACT BASED ON HYDRAULIC DATA, SUB SOIL DATA, CONDITIONS, SPECIFICATIONS OF THE RFP & CA DOCUMENT INCLUDING ALL WORKS NECESSARY TO COMPLETE THE BRIDGE AND APPROACHES SUCH AS ALL PREPARATORY WORKS, PROTECTIVE WORKS, TEMPORARY RIVER TRAINING WORKS AND DIVERSION ETC. THE WORK WILL ALSO INCLUDE CONSTRUCTION, OPERATION AND MAINTENANCE OF TEMPORARY CROSSING ACROSS CHIMTUIPUI RIVER DURING CONSTRUCTION PERIOD OF BRIDGE.Drg No B-2165/RBAT Dte/Psk/2024 dated 09 Feb 2024
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Jun-2024 | Clarification to bidders queries and amendment in RFP Clauses | Other | 01-Jul-2024 |
| 2 | 22-Jun-2024 | Change in Bid Submission End Date | Date | 15-Jul-2024 |
| 3 | 22-Jun-2024 | Clarification to bidders queries | Other | 15-Jul-2024 |
| 4 | 02-Jul-2024 | Change in Item rate BOQ | Other | 15-Jul-2024 |
| 5 | 13-Jul-2024 | CHANGE IN BID SUBMISSION END DATE | Date | 25-Jul-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | DESIGN AND CONSTRUCTION OF 282.00 MTR SPAN BALANCE CANTILEVER PSC BOX GIRDER BRIDGE OVER RIVER CHIMTUIPUI INCLUDING APPROACHES AT KM 6.490 ON ROAD HNATHIAL - SANGAU - SAIHA UNDER 71 RCC/24 BRTF/ PROJECT PUSHPAK THROUGH AN ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) CONTRACT BASED ON HYDRAULIC DATA, SUB SOIL DATA, CONDITIONS, SPECIFICATIONS OF THE RFP & CA DOCUMENT INCLUDING ALL WORKS NECESSARY TO COMPLETE THE BRIDGE AND APPROACHES SUCH AS ALL PREPARATORY WORKS, PROTECTIVE WORKS, TEMPORARY RIVER TRAINING WORKS AND DIVERSION ETC. THE WORK WILL ALSO INCLUDE CONSTRUCTION, OPERATION AND MAINTENANCE OF TEMPORARY CROSSING ACROSS CHIMTUIPUI RIVER DURING CONSTRUCTION PERIOD OF BRIDGE.Drg No B-2165/RBAT Dte/Psk/2024 dated 09 Feb 2024 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents