}

Tender For Improvements Of Road Mrl04-Siruvatchi Kappalur Road To Kesani (Via) Ulakkudi- Package No Tn 16-195In Kannagudi Block Of Sivagangai District., sivagangai-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Improvements Of Road Mrl04-Siruvatchi Kappalur Road To Kesani (Via) Ulakkudi- Package No Tn 16-195In Kannagudi Block Of Sivagangai District.. Submission Date for this Tender is 19-06-2024. Road Work Tenders in sivagangai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

43393979
Tender For Improvements Of Road Mrl04-Siruvatchi Kappalur Road To Kesani (Via) Ulakkudi- Package No Tn 16-195In Kannagudi Block Of Sivagangai District.
Open Tender
Indian
Tamil Nadu
sivagangai
19-06-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Improvements of road MRL04-Siruvatchi Kappalur Road to Kesani (Via) Ulakkudi- Package No TN 16-195in Kannagudi Block of Sivagangai District.

Key Value

Document Fees
Refer document
EMD
INR 529000.0 /-
Tender Value
INR 2.64 Crore /-

Attachment

FileName File Description File Size
BOQ_209911.xls Tender Document 0 KB
195_Doc_Kannangudi.pdf Tender Document 0 KB
aa5fc146-33d5-4778-a547-afa6971100d1.html Tender Notice 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:Improvements of road MRL04-Siruvatchi Kappalur Road to Kesani (Via) Ulakkudi- Package No TN 16-195in Kannagudi Block of Sivagangai District.
Sl. No. Item Description
1Improvements of road MRL04-Siruvatchi Kappalur Road to Kesani (Via) Ulakkudi- Package No TN 16-195in Kannagudi Block of Sivagangai District.
2Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
3Km : 1/200 - 4/950
4Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
5Km : 1/200 - 4/950
6Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth)
7Km. 1/200 - 2/0
8Km. 2/0 - 3/0
9Km. 3/0 - 4/0
10Km. 4/0 - 4/950
11Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
12Km. 1/200 - 2/0
13Km. 2/0 - 3/0
14Km. 3/0 - 4/0
15Km. 4/0 - 4/950
16Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
17Km. 1/200 - 2/0
18Km. 2/0 - 3/0
19Km. 3/0 - 4/0
20Km. 4/0 - 4/950
21Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504.
22Km. 1/200 - 2/0
23Km. 2/0 - 3/0
24Km. 3/0 - 4/0
25Km. 4/0 - 4/950
26Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
27Km. 1/200 - 1/300
28Km. 2/0 - 3/0
29Km. 3/0 - 4/0
30Km. 4/0 - 4/950
31Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
32Km. 1/200 - 1/300
33Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING].
34Km. 1/200 - 1/300
35Providing and applying Tack-coat with cationic bitumen emulsion (CRS-1) in mixing ratio of 0.014 part Nanotechnology based Penetrative Reactive Water-solubleOrganosilane material (forming water clear solution) : 1 part water (<1000 ppm TDS) : 1 part cationic bitumen emulsion and spraying using emulsion distributor at the rate of 1.2 times of conventional spray rate 0.275 Kg per sqm (i.e 0.33 kg/sqm) on the prepared new bituminous surface cleaned with Hydraulic broom as perTechnical Specification Clause 503 .(ref:Mord pg.no 5-4)
36Km. 1/300 - 2/0
37Km. 2/0 - 3/0
38Km. 3/0 - 4/0
39Km. 4/0 - 4/950
40Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING - ZYCOTHERM].
41Km. 1/300 - 2/0
42Km. 2/0 - 3/0
43Km. 3/0 - 4/0
44Km. 4/0 - 4/950
45Waterproofing of the shoulder surface by spraying 1kg of Terrasil or Equivalent and 1kg of Zycobond or Equivalentin the ratio of 1:1:200 with Potable Water and spraying on the surface @ 3ltrs/sqm and compacting with a static roller. Complete job, finished work to be measured.
46Km. 1/200 - 2/0
47Km. 2/0 - 3/0
48Km. 3/0 - 4/0
49Km. 4/0 - 4/950
50Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
51Km. 1/200 - 2/0
52Km. 2/0 - 3/0
53Km. 3/0 - 4/0
54Km. 4/0 - 4/950
55Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
56Provision for Road Marker/ Road stud with lens Reflector
57Provision for Name Board
58Provision for PMGSY Logo Board
59Provision for Sign Board (1 curve =2Nos)
60Provision for Chevron Sign Octogan Board (90cm)
61Provision for 60 cm Circle(Mandatory Sign Baoard)
62Provision for Citizen Information Board
63Provision for Maintenance Board
64Provision for KM Stone
65Provision for HM Stone
66Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
67Pipe culvert at : 3095
68Removal of Pipes
69Removal of Body wall
70Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.
711 Row Pipe Culvert @ Ch. 3095,
72Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
731 Row Pipe Culvert @ Ch. 3095,
74Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
751 Row Pipe Culvert @ Ch. 3095,
76Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
771 Row Pipe Culvert @ Ch. 3095,
78Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
791 Row Pipe Culvert @ Ch. 3095,
80Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
811 Row Pipe Culvert @ Ch. 3095,
82Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets
831 Row Pipe Culvert @ Ch. 3095,
84Construction of Gravel/Soil-aggregate Baseby providingwell gradedmaterial, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with threewheel 80-100 kN static rollerto achieve thedesired density, complete as per Technical Specifications Clause 401 Grading III (GSB).
851 Row Pipe Culvert @ Ch. 3095,
86Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM)
87CC Pavement @ Ch. 1675 - 1885
88CC Pavement @ Ch. 2810 - 3000
89CC Pavement @ Ch. 3000 - 3075
90Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding25 mm minimumcement content of 375 kg per cum, mixing in concrete mixerat optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
91CC Pavement @ Ch. 1675 - 1885
92CC Pavement @ Ch. 2810 - 3000
93CC Pavement @ Ch. 3000 - 3075
94Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.
95Protective works@ Ch.2575 - 2650 RHS
96Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
97Protective works@ Ch.2575 - 2650 RHS
98Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
99Protective works@ Ch.2575 - 2650 RHS
100Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works
101Protective works@ Ch.2575 - 2650 RHS
102Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works
103Protective works@ Ch.2575 - 2650 RHS
104Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
105Protective works@ Ch.2575 - 2650 RHS
106Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial.
107Protective works@ Ch.1430 - 1475 LHS
108Protective works@ Ch.3335 - 3435 LHS
109Protective works@ Ch.3780 - 3800 LHS
110Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
111Protective works@ Ch.1430 - 1475 LHS
112Protective works@ Ch.3335 - 3435 LHS
113Protective works@ Ch.3780 - 3800 LHS
114Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
115Protective works@ Ch.1430 - 1475 LHS
116Protective works@ Ch.3335 - 3435 LHS
117Protective works@ Ch.3780 - 3800 LHS
118Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shutteringwherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works
119Protective works@ Ch.1430 - 1475 LHS
120Protective works@ Ch.3335 - 3435 LHS
121Protective works@ Ch.3780 - 3800 LHS
122Maintenance of the road
123Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
124For the First Year from the date of completion of work
125For the Second Year from the date of completion of work
126For the Third Year from the date of completion of work
127For the Fourth Year from the date of completion of work
128For the Fifth Year from the date of completion of work
129GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail